At a glance
On , OSHA opened a complaint safety inspection of HARVESTLAND CONSTRUCTORS, INC. in 501 S. WILLIAMS STREET, CAMBRIA, WI 53923 (NAICS 236210). OSHA activity number 342849379.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- HARVESTLAND CONSTRUCTORS, INC.
- Site address
- 501 S. WILLIAMS STREET
- City
- CAMBRIA
- State
- WI
- ZIP
- 53923
- Mailing
- 206 12TH AVENUE NE, WEST FARGO, ND 58078
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236210
- Employees
- 231
- Ownership type
- A
Citations
5 citations on file for this inspection.
1926.405 A02 II J
- Issued
- Jun 8, 2018
- Abate by
- Jun 18, 2018
- Penalty
- Initial $7,484 · Current $4,490 Reduced
General-duty citation text
29 CFR 1926.405(a)(2)(ii)(J): Extension cord sets used with portable electric tools and appliances shall be of three-wire type and shall be designed for hard or extra-hard usage. Flexible cords used with temporary and portable lights shall be designed for hard or extra-hard usage. NOTE: The National Electrical Code, ANSI/NFPA 70, in Article 400, Table 400-4, lists various types of flexible cords, some of which are noted as being designed for hard or extra-hard usage. Examples of these types of flexible cords include hard service cord (types S, ST, SO, STO) and junior hard service cord (types SJ, SJO, SJT, SJTO). On or about December 20, 2017, an extension cord that was utilized for temporary wiring was not designed for hard or extra-hard usage.
Recent events (2)
- — I (S) $4490.4
- — Z (S) $7484
1926.451 B01 I
- Issued
- Jun 8, 2018
- Abate by
- Jun 18, 2018
- Penalty
- Initial $7,484 · Current $4,490 Reduced
General-duty citation text
29 CFR 1926.451(b)(1)(i): Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) was not installed so that the space between adjacent units and the space between the platform and the uprights were no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary. On or about December 20, 2017, employees performing work from a finishing scaffold were doing so with plank spacing greater than one inch.
Recent events (2)
- — I (S) $4490.4
- — Z (S) $7484
1926.451 B05 II
- Issued
- Jun 8, 2018
- Abate by
- Jun 18, 2018
- Penalty
- Initial $7,484 · Current $2,000 Reduced
General-duty citation text
29 CFR 1926.451(b)(5)(ii): The end of a platform greater than 10 feet in length extended over its support more than 18 inches and the platform was not designed and installed so that the cantilevered portion of the platform was able to support employees without tipping, or had guardrails which blocked employee access to the cantilevered end: On or about December 20, 2017, employees performing work from a finishing scaffold were doing so with the planks extended more than eighteen inches over the supports.
Recent events (2)
- — I (O) $2000
- — Z (S) $7484
1926.451 B07
- Issued
- Jun 8, 2018
- Abate by
- Jun 18, 2018
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(b)(7): On scaffolds where platforms are overlapped to create a long platform, the overlap shall occur only over supports, and shall not be less than 12 inches (30 cm) unless the platforms are nailed together or otherwise restrained to prevent movement. On or about December 20, 2017, employees performing work from a finishing scaffold were doing so with planking that was not overlapped over supports.
Recent events (2)
- — I (O) $0
- — Z (S) $0
1926.502 D08
- Issued
- Jun 8, 2018
- Abate by
- Jun 22, 2018
- Penalty
- Initial $7,484 · Current $4,490 Reduced
General-duty citation text
29 CFR 1926.502(d)(8): Horizontal lifelines were not designed, installed, and used under the supervision of a qualified person, as part of a complete personal fall arrest system, which maintained a safety factor of at least two: On or about December 20, 2017, employees performing work from a finishing scaffold were utilizing a horizontal lifeline that was not designed, installed, and used under the supervision of a qualified person, and as part of a complete personal fall arrest system which maintained a safety factor of at least two.
Recent events (2)
- — I (S) $4490.4
- — Z (S) $7484
More inspections at Harvestland Constructors, INC.
View Harvestland Constructors, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 236210)
More inspections in WI
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342849379.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.