Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: PIONEER METAL FINISHING CORP.

Complaint inspection · Health discipline

On , OSHA opened a complaint health inspection of PIONEER METAL FINISHING CORP. in 486 GLOBE AVENUE, GREEN BAY, WI 54304 (NAICS 332813). OSHA activity number 342921236.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Pioneer Metal Finishing Corp. — free Get an email when a new federal OSHA severe-injury report for Pioneer Metal Finishing Corp. is published. One employer, no account, unsubscribe in one click.
Site address
486 GLOBE AVENUE
City
GREEN BAY
State
WI
ZIP
54304
Mailing
486 GLOBE AVENUE, GREEN BAY, WI 54304
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332813
Employees
265
Ownership type
A

2 citations on file for this inspection.

1910.124 J01

Serious Gravity 5 1 instance 75 exposed
Issued
Apr 13, 2018
Abate by
May 11, 2018
Penalty
Initial $6,912 · Current $4,147 Reduced
29 CFR 1910.124(j)(1): You must inspect the hoods and ductwork of the ventilation system for corrosion or damage:  At least quarterly during operation and prior to operation after a prolonged shutdown:    A)  On or about February 1, 2018, the employer had not developed and implemented an inspection procedure for the hoods and ductwork of the ventilation systems associated with the 450 and 850 Electroless Nickel Process Lines dip tanks.
Recent events (2)
  • — I (S) $4147.2
  • — Z (S) $6912

1910.124 J02

Serious Gravity 5 1 instance 75 exposed
Issued
Apr 13, 2018
Abate by
May 11, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.124(j)(2): You must ensure that the airflow is adequate: At least quarterly during operation and prior to operation after a prolonged shutdown:  A)  On or about February 1, 2018, the employer had not developed and implemented an inspection procedure of the ventilation systems associated with the 450 and 850 Electroless Nickel Process Lines dip tanks to ensure the airflow is adequate.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Pioneer Metal Finishing Corp.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342921236.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.