SULPHUR, LA —
OSHA Inspection: CITGO PETROLEUM CORPORATION-LCMC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of CITGO PETROLEUM CORPORATION-LCMC in 4401 LA HWY 108, SULPHUR, LA 70663 (NAICS 324110). OSHA activity number 342956711.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CITGO PETROLEUM CORPORATION-LCMC
- Site address
- 4401 LA HWY 108
- City
- SULPHUR
- State
- LA
- ZIP
- 70663
- Mailing
- P.O.BOX 1562, LAKE CHARLES, LA 70602
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 324110
- Employees
- 2500
- Ownership type
- A
Citations
8 citations on file for this inspection.
1910.119 D03 I B
- Issued
- Aug 9, 2018
- Abate by
- Aug 28, 2018
- Penalty
- Initial $12,934 · Current $1,000 Reduced
General-duty citation text
29 CFR 1910.119(d)(3)(i)(B): The employer's piping and instrument diagrams did not accurately represent equipment that was existing and was part of the process. (a) On or about 02/15/2018 in the Unicracker Unit at area 320 of the CITGO Refinery in Lake Charles, LA; the equipment observed in the field and marked as "LV052" did not match what was depicted on P & ID A-50459 for that equipment"and at times prior to, at the CITGO Refinery in Lake Charles, LA the P&ID A-50459 inaccurately depicted LV52 as FC43 in the Unicracker Unit at Area 320.
Recent events (3)
- — F (O) $1000
- — C (S) $12934
- — Z (S) $12934
1910.119 F01
- Issued
- Aug 9, 2018
- Abate by
- Aug 28, 2018
- Penalty
- Initial $12,934 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(f)(1): The employer did not develop and implement written operating procedures that provide clear instructions for safely conducting activities involved in each covered process. IN THE ALTERNATIVE 29 CFR 1910.119(j)(2): The employer did not establish or implement written procedures to maintain the on-going integrity of process equipment. (a) On or about February 13, 2018 and at a time prior to, in the 320 Area of the CITGO Refinery in Lake Charles, LA the employer did not implement written procedures to guide the operators while performing tasks that involve assembly of critical bolted flanges in process piping.
Recent events (3)
- — F (S) $0
- — C (S) $12934
- — Z (S) $12934
1910.119 L01
- Issued
- Aug 9, 2018
- Abate by
- Aug 28, 2018
- Penalty
- Initial $12,934 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(l)(1): The employer did not implement written procedures to manage changes to process chemicals, technology, equipment, and procedures, and changes to facilities that affect a covered process. On or about 02/15/2018 and at times after, in Area 320 of the CITGO Refinery in Lake Charles, the employer did not implement its management of change process when it deviated from its incident investigation and near miss/deficiencies observed in Area 320 on February 15, 2018 with the following instances: a. Non-functional instrument air gages on the Light Naphtha valve (LV052) was not investigated and tracked in the employers incident tracking system (IMPACT). b. Broken Eaton, pump switch on the Fractionator Reboiler Pump (JP8) was not investigated and tracked in the employers incident tracking system (IMPACT). c. Open ended pipe on the seal pump system for the debutanizer reboiler pump (JP6A) was not investigated and tracked in the employers incident tracking system (IMPACT). d. Open ended pipe found above the Depentanizer reboiler (C108) associated with instrument number 320LSL083 was not investigated and tracked in the employers incident tracking system (IMPACT)
Recent events (3)
- — F (S) $0
- — C (S) $12934
- — Z (S) $12934
1910.119 J05
- Issued
- Aug 9, 2018
- Abate by
- Aug 28, 2018
- Penalty
- Initial $12,934 · Current $7,760 Reduced
General-duty citation text
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that were outside acceptable limits (defined by the process safety information on paragraph (d) of this section) in a safe and timely manner when necessary means where taken to assure safe operation: (e) On or about 2/15/18, at in Area 320, at the Unicracker Unit, the main feeder line emanating from underground and supplying power to the Unicracker Unit had a cracked cover plate.
Recent events (3)
- — F (S) $7760.4
- — C (S) $12934
- — Z (S) $12934
1910.119 M01
- Issued
- Aug 9, 2018
- Abate by
- Aug 24, 2018
- Penalty
- Initial $12,934 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(m)(1): The employer did not investigate each incident which resulted in, or could reasonably have resulted in a catastrophic release of highly hazardous chemical in the workplace: On or about 02/15/2018 at a time there after, in Area 320 of the CITGO Refinery in Lake Charles, the employer fail to investigate each incidents at the Unicracker witnessed by the employer management team. Instances: a. Non-functional instrument air gages on the Light Naphtha valve (LV052) was not investigated and track in the employers incident tracking system (IMPACT). b. Broken Eaton, Clouse-Hines pump switch on the Fractionator Reboiler Pump (JP8) was not investigated and tract in the employers incident tracking system (IMPACT). c. Open ended pipe on the seal pump system for the debutanizer reboiler pump (JP6A) was not investigated and tract in the employers incident tracking system (IMPACT). d. Conduit with exposed wires going to the light fixtures by the light product pump (JP10A) was not investigated and tract in the employers incident tracking system (IMPACT) e. Open ended pipe found above the Depentanizer reboiler (C108) associated with instrument number 320LSL083 was not investigated and tract in the employers incident tracking system (IMPACT)
Recent events (3)
- — F (S) $0
- — C (S) $12934
- — Z (S) $12934
1910.307 C
- Issued
- Aug 9, 2018
- Abate by
- Jan 28, 2019
- Penalty
- Initial $12,934 · Current $7,760 Reduced
General-duty citation text
29 CFR 1910.307(c): Equipment, wiring methods, and installations of equipment in hazardous (classified) locations were not intrinsically safe, approved for the hazardous (classified) location, or safe for the hazardous (classified) location: On or about 02/15/2018 at a time prior to, in Area 320 of the CITGO Refinery in Lake Charles, LA the employer did not ensure that equipment, wiring methods and installations of equipment in hazardous location were intrinsically safe for the Class 1, Division 2 hazardous location or safely for the location. (a) Conduit with exposed wires going to the light fixtures by the light product pump (JP10A) were allowed in the unit. (c) Broken and exposed wire by the vessel C-94 allowed in the unit. (d) Broken seal plate for the main feeder circuit for the Unicracker Unit
Recent events (3)
- — F (S) $7760.4
- — C (S) $12934
- — Z (S) $12934
1910.305 B02 I
- Issued
- Aug 9, 2018
- Abate by
- Aug 28, 2018
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.305(b)(2)(i): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose. On or about February 15, at Area 320, in the Unicracker Unit, the employer failed to ensure to maintain a cover plate on; a) a junction box adjacent to lighting fixture #70. b) the main feeder line emanating from underground and supplying power to the Unicracker Unit. c. Junction box by the light product pump (JP10A). " No other changes.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1910.157 E01
- Issued
- Aug 9, 2018
- Abate by
- Aug 21, 2018
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.157(e)(1): The employer shall be responsible for the inspection, maintenance and testing of all portable fire extinguishers in the workplace: On or about 02/15/2018, at 4401 LA Hwy-108, Sulphur, LA, employees were working in the Unicracker unit area designated as a Class I, Division 2 location of the facility where light naphtha flammable liquid mixtures are handled, processed or used, and confined within a closed system from which the mixture could escape in the event of accidental rupture or breakdown of such systems resulting in a fire or explosion from an ignition source, and a portable fire extinguisher had not been inspected monthly in the area.
Recent events (3)
- — F (O) $0
- — C (O) $0
- — Z (O) $0
More inspections at Citgo Petroleum Corporation-Lcmc
View Citgo Petroleum Corporation-Lcmc's full OSHA safety record →
More inspections in this industry (NAICS 324110)
More inspections in LA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342956711.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.