Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: WINDY CITY WIRE CABLE AND TECHNOLOGY PRODUCTS, LLC

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of WINDY CITY WIRE CABLE AND TECHNOLOGY PRODUCTS, LLC in 386 INTERNATIONAL DRIVE, BOLINGBROOK, IL 60440 (NAICS 332618). OSHA activity number 342958527.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Windy City Wire Cable and Technology Products, LLC — free Get an email when a new federal OSHA severe-injury report for Windy City Wire Cable and Technology Products, LLC is published. One employer, no account, unsubscribe in one click.
Site address
386 INTERNATIONAL DRIVE
City
BOLINGBROOK
State
IL
ZIP
60440
Mailing
386 INTERNATIONAL DRIVE, BOLINGBROOK, IL 60440
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332618
Employees
200
Ownership type
A

2 citations on file for this inspection.

1910.147 C06 I

Other-than-serious 1 instance 7 exposed
Issued
Mar 21, 2018
Abate by
Apr 16, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed.   On February 16, 2018, a periodic inspection of the energy control procedure was not conducted in the past 12 months.    Certification, with date and method of abatement required.  Certification of abatement is required by 29 CFR Part 1903 and is to be submitted within (10) calendar days after the abatement date.
Recent events (1)
  • — Z (O) $0

1910.147 C07 IV

Other-than-serious 1 instance 125 exposed
Issued
Mar 21, 2018
Abate by
Apr 16, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(7)(iv): The employer did not certify that employee training had been accomplished and kept up to date.   Production area: On February 16, 2018, lock out training for affected and other employees was not certified.    Certification, with date and method of abatement required.  Certification of abatement is required by 29 CFR Part 1903 and is to be submitted within (10) calendar days after the abatement date.
Recent events (1)
  • — Z (O) $0

View Windy City Wire Cable and Technology Products, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342958527.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.