Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: R.S. DELUCA CONSTRUCTION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of R.S. DELUCA CONSTRUCTION in 1534 BRIGHTON PLACE, PITTSBURGH, PA 15212 (NAICS 238170). OSHA activity number 342963972.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch R.S. Deluca Construction — free Get an email when a new federal OSHA severe-injury report for R.S. Deluca Construction is published. One employer, no account, unsubscribe in one click.
Site address
1534 BRIGHTON PLACE
City
PITTSBURGH
State
PA
ZIP
15212
Mailing
618 OVERHILL DRIVE, NORTH VERSAILLES, PA 15137
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238170
Employees
3
Ownership type
A

2 citations on file for this inspection.

1926.454 C

Serious Gravity 5 1 instance 2 exposed
Issued
Mar 12, 2018
Abate by
Mar 22, 2018
Penalty
Initial $2,772 · Current $1,400 Reduced
29 CFR 1926.454(c): When the employer had reason to believe that an employee lacked the skill or understanding needed for safe work involving the erection, use or dismantling of scaffolds, the employer did not retrain each such employee so that the requisite proficiency is regained:      a) Job site, 1534 Brighton Place, Pittsburgh, PA: On or about February 21, 2018, during construction activities, the employer did not ensure scaffold safety retraining was performed where employees were not following correct procedures to safely use aerial lifts. Deficiencies noted during the inspection included, but were not limited to, not using fall protection inside the basket at all times and not using appropriate fall protection systems in the baskets when fall protection was used.
Recent events (3)
  • — F (S) $1400
  • — C (S) $2772
  • — Z (S) $2772

1926.20 B01

Other-than-serious 1 instance 2 exposed
Issued
Mar 12, 2018
Abate by
Apr 5, 2018
Penalty
Initial $0 · Current $0
29 CFR 1926.20(b)(1): The employer did not initiate and maintain such programs as may be necessary to comply with this part:   a) Job site, 1534 Brighton Place, Pittsburgh, PA: On or about February 21, 2018, during construction activities, the employer did not ensure that appropriate safety and health programs were in place and that sound practices were followed in order to prevent injuries to employees.
Recent events (3)
  • — F (O) $0
  • — C (O) $0
  • — Z (O) $0

View R.S. Deluca Construction's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342963972.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.