OSHA Inspection: MEC CONSTRUCTION LLC

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of MEC CONSTRUCTION LLC in 2519 TINGLEY LAKE ROAD, NEW MILFORD, PA 18834 (NAICS 236210). OSHA activity number 342978020.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch MEC Construction LLC — free Get an email when a new federal OSHA severe-injury report for MEC Construction LLC is published. One employer, no account, unsubscribe in one click.
Site address
2519 TINGLEY LAKE ROAD
City
NEW MILFORD
State
PA
ZIP
18834
Mailing
130 MEADOW RIDGE ROAD, MOUNT MORRIS, PA 15349
Inspection type
Complaint (B)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236210
Employees
415
Ownership type
A

3 citations on file for this inspection.

1926.652 A01

Serious Gravity 5 1 instance 3 exposed
Issued
Apr 6, 2018
Abate by
Apr 18, 2018
Penalty
Initial $6,929 · Current $4,157 Reduced
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652 (b) or (c):    a) CDP 5 Compressor Station, New Milford, PA: Employees entered and worked in a 6 to 7 foot deep trench that had been equipped with an inadequately installed Pioneer Speed Shoring system, exposing employees to a potential cave-in/engulfment hazard, on or about February 27, 2018.     ABATEMENT CERTIFICATION REQUIRED
Recent events (3)
  • — F (S) $4157
  • — C (S) $6929
  • — Z (S) $6929

1926.652 C02 I

Deleted Serious Gravity 5 1 instance 3 exposed
Issued
Apr 6, 2018
Abate by
Apr 18, 2018
Penalty
Initial $0 · Current $0
29 CFR 1926.652(c)(2)(i): 29 CFR 1926.652(c)(2)(i): Design of support systems, shield systems, or other protective systems that are drawn from manufacturer's tabulated data were not in accordance with all specifications, recommendations, and limitations issued or made by the manufacturer:  a) CDP Compressor Station, New Milford, PA: Installation and use of Pioneer Speed Shoring was not in accordance with the manufacturer's tabulated date, which resulted in employee exposure to failure of the cave-in protection system, on or about February 27, 2018.  ABATEMENT CERTIFICATION REQUIRED
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1926.651 K01

Deleted Serious Gravity 5 1 instance 3 exposed
Issued
Apr 6, 2018
Abate by
Apr 18, 2018
Penalty
Initial $0 · Current $0
29 CFR 1926.651(k)(1): Daily inspections of excavations, the adjacent areas, and protective systems were not made by a competent person for evidence of a situation that could have resulted in possible cave-ins, indications of failure of protective systems:  a) CDP 5 Compressor Station New Milford, PA: A 6 to 7 foot deep trench equipped with hydraulic shoring was not inspected by a competent person to ensure that the cave-in protection system was properly installed, on or about February 27, 2018.  ABATEMENT CERTIFICATION REQUIRED
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

View MEC Construction LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342978020.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.