OSHA Inspection: DAY & ZIMMERMANN NPS, INC.

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of DAY & ZIMMERMANN NPS, INC. in 2440 IGOU FERRY RD, SODDY DAISY, TN 37379 (NAICS 238210). OSHA activity number 343058830.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch DAY & Zimmermann NPS, INC. — free Get an email when a new federal OSHA severe-injury report for DAY & Zimmermann NPS, INC. is published. One employer, no account, unsubscribe in one click.
Site address
2440 IGOU FERRY RD
City
SODDY DAISY
State
TN
ZIP
37379
Mailing
1101 MARKET STREET BR 2B, CHATTANOOGA, TN 37402
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238210
Employees
290
Ownership type
A

6 citations on file for this inspection.

1910.269 B01 II

Deleted Serious Gravity 10 1 instance 1 exposed
Issued
Jul 31, 2018
Abate by
Aug 17, 2018
Penalty
Initial $12,934 · Current $0 Reduced
29 CFR 1910.269(b)(1)(ii): For fixed work locations the number of trained persons available was not sufficient to ensure that each employee exposed to electric shock could be reached within four (4) minutes by a trained person:  (a) On or about 3/16/2018 - Cooling Tower Lift Pump Station 6.9 KV Cooling Tower Board B Compartment 2, trained persons were not available within four (4) minutes of employees exposed to electric shock.
Recent events (3)
  • — F (S) $0
  • — C (S) $12934
  • — Z (S) $12934

1910.269 C02

Deleted Serious Gravity 10 1 instance 1 exposed
Issued
Jul 31, 2018
Abate by
Aug 6, 2018
Penalty
Initial $12,934 · Current $0 Reduced
29 CFR 1910.269(c)(2): The job briefing did not cover at least the following subjects:  hazards associated with the job, work procedures involved, special precautions, energy-source controls, and personal protective equipment requirements:  (a) On or about 3/16/2018 - Cooling Tower Lift Pump Station 6.9 KV Cooling Tower Board B Compartment 2, the employer did not ensure that special precautions and energy-source controls were discussed in the brief pre-job meeting.
Recent events (3)
  • — F (S) $0
  • — C (S) $12934
  • — Z (S) $12934

1910.269 C03 II

Deleted Serious Gravity 10 1 instance 1 exposed
Issued
Jul 31, 2018
Abate by
Aug 6, 2018
Penalty
Initial $12,934 · Current $0 Reduced
29 CFR 1910.269(c)(3)(ii): Additional job briefings were not held if significant changes, which might affect the safety of the employees, occurred during the course of the work:  (a) On or about 3/16/2018 - Cooling Tower Lift Pump Station 6.9 KV Cooling Tower Board B Compartment 2, an additional job briefing was not held after it was observed that the ground and test device was more difficult than usual to remove and before the compartment door was reopened for a foreign material inspection.
Recent events (3)
  • — F (S) $0
  • — C (S) $12934
  • — Z (S) $12934

1910.269 D06 VI

Other-than-serious 1 instance 1 exposed
Issued
Jul 31, 2018
Abate by
Aug 6, 2018
Penalty
Initial $6,929 · Current $6,929
29 CFR 1910.269(d)(6)(vi): When there was a possibility of reaccumulation of stored energy to a hazardous level, verification of isolation shall be continued until the servicing or maintenance is completed or until the possibility of such accumulation no longer exists:    (a) On or about 3/16/2018 - Cooling Tower Lift Pump Station 6.9 KV Cooling Tower Board B Compartment 2, the employer adversely affected the protective grounds associated with HO 0-202-0594 when he disconnected and re-connected ground truck cable phases for continuity checks and allowed for the possibility of 6.9 KV energy re-accumulation hazards.
Recent events (3)
  • — F (O) $6929
  • — C (S) $6929
  • — Z (S) $6929

1910.269 L03 III

Other-than-serious 1 instance 1 exposed
Issued
Jul 31, 2018
Abate by
Aug 6, 2018
Penalty
Initial $12,934 · Current $12,934
29 CFR 1910.269(l)(3)(iii): The employer did not ensure that no employee approached or took any conductive object closer to exposed energized parts than the employer's established minimum approach distance, unless provisions described in (l) (3) (iii) (A) - (C) were followed:     (a) On or about 3/16/2018 - Cooling Tower Lift Pump Station 6.9 KV Cooling Tower Board B Compartment 2, the employer did not ensure that conductive objects, such as but not limited to, a Fluke Digital Multimeter and a cell phone were not taken within the minimum approach distance or restricted approach boundary of 26 inches while an employee was standing inside the limited approach boundary of 60 inches and the employee and the multimeter were not adequately insulated.
Recent events (3)
  • — F (O) $12934
  • — C (S) $12934
  • — Z (S) $12934

1910.269 L08 V

Other-than-serious 1 instance 2 exposed
Issued
Jul 31, 2018
Abate by
Aug 6, 2018
Penalty
Initial $12,934 · Current $12,934
29 CFR 1910.269(l)(8)(v): The employer did not ensure that each employee exposed to hazards from electric arcs wore protective clothing and other protective equipment that had an arc rating greater than or equal to the heat energy estimated under paragraph (l)(8)(ii) of this section whenever that estimate exceeded 2.0 cal/cm2.  This protective equipment shall cover the employee's entire body, except as listed in paragraphs (A) - (E):    (a) On or about 3/16/2018 - Cooling Tower Lift Pump Station 6.9 KV Cooling Tower Board B Compartment 2, the employer did not ensure that an employee was wearing protective clothing and other protective equipment that had a minimum arc rating of 12.4 cal/cm2 when he was within the 16.5 foot arc flash boundary, the compartment door was open, and 6.9 KV cable continuity checks were being performed at the ground and test device GT-22 (ground truck).    (b) On or about 3/16/2018 - Cooling Tower Lift Pump Station 6.9 KV Cooling Tower Board B Compartment 2, the employer did not ensure that an employee was wearing protective clothing and other protective equipment that had a minimum arc rating of 12.4 cal/cm2 when he was within the 16.5 foot arc flash boundary, the compartment door was open, a foreign material inspection was being conducted, and the shutter panel was open or being manipulated.
Recent events (3)
  • — F (O) $12934
  • — C (S) $12934
  • — Z (S) $12934

View DAY & Zimmermann NPS, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343058830.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.