LONGMEADOW, MA —
OSHA Inspection: MJC HOME IMPROVEMENT LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of MJC HOME IMPROVEMENT LLC in 68 HOPKINS PL, LONGMEADOW, MA 01106 (NAICS 238160). OSHA activity number 343061289.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MJC HOME IMPROVEMENT LLC
- Site address
- 68 HOPKINS PL
- City
- LONGMEADOW
- State
- MA
- ZIP
- 01106
- Mailing
- 183 MAYNARD ST, SPRINGFIELD, MA 01109
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 5
- Ownership type
- A
Citations
5 citations on file for this inspection.
1903.19 C03
- Issued
- Jul 30, 2018
- Abate by
- Aug 9, 2018
- Penalty
- Initial $311 · Current $311
General-duty citation text
29 CFR 1903.19(c)(3): The employer did not certify to OSHA within 10 calendar days after the abatement date, that each cited violation had been abated: As of July 27, 2018, the employer had not certified to OSHA that the abatement was completed for the following violations; Citation 1, Item 1, Item 2 and Item 3 from Inspection 1306128, issued on April 24, 2018 with a final order date of July 5, 2018
Recent events (1)
- — Z (O) $311
1903.19 D01
- Issued
- Jul 30, 2018
- Abate by
- Aug 9, 2018
- Penalty
- Initial $311 · Current $311
General-duty citation text
29 CFR 1903.19(d)(1): The employer did not submit to the Agency, documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required: As of July 27, 2018, the employer had not submitted documents to the Agency that the abatement was completed for the following violations; Citation 1, Item 1 from Inspection 1306128, issued April 24, 2018 with a final order date of July 5, 2018
Recent events (1)
- — Z (O) $311
1926.501 B13
- Issued
- Apr 24, 2018
- Abate by
- Apr 30, 2018
- Penalty
- Initial $3,880 · Current $3,880
General-duty citation text
29 CFR 1926.501(b)(13): Each employee engaged in residential construction activities 6 feet (1.8 m) or more above lower levels was not protected by guardrail systems, safety net system, or personal fall arrest system: a) 68 Hopkins Pl., Longmeadow, MA: On or about March 29, 2018 three employees were roofing this residence, more than 20 feet above the ground below without having fall protection. Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29CFR1903.19(d)(1).
Recent events (1)
- — Z (S) $3880
1926.503 B01
- Issued
- Apr 24, 2018
- Abate by
- Apr 30, 2018
- Penalty
- Initial $2,772 · Current $2,772
General-duty citation text
29 CFR 1926.503(b)(1): The employer did not verify compliance with paragraph (a) of this section by preparing a written certification record: a) 68 Hopkins Pl., Longmeadow, MA: On or about March 29, 2018, the employer had prepared written certifications documenting that his employees were trained in fall protection.
Recent events (1)
- — Z (S) $2772
1926.1053 B04
- Issued
- Apr 24, 2018
- Abate by
- Apr 30, 2018
- Penalty
- Initial $2,772 · Current $2,772
General-duty citation text
29 CFR 1926.1053(b)(4): Ladders were not used only for the purpose for which they were designed: a) 68 Hopkins Pl., Longmeadow, MA: On or about March 29, 2018 four employees were observed climbing on the shingle lift rails, using it as a ladder to reach the ground level. Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29CFR1903.19(d)(1).
Recent events (1)
- — Z (S) $2772
More inspections at MJC Home Improvement LLC
View MJC Home Improvement LLC's full OSHA safety record →
More inspections in this industry (NAICS 238160)
More inspections in MA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343061289.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.