OSHA Inspection: ALL QUALITY MACHINING & FINISHING, LLC

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of ALL QUALITY MACHINING & FINISHING, LLC in 11 GREEN STREET, CHRISTIANA, PA 17509 (NAICS 333999). OSHA activity number 343080958.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch ALL Quality Machining & Finishing, LLC — free Get an email when a new federal OSHA severe-injury report for ALL Quality Machining & Finishing, LLC is published. One employer, no account, unsubscribe in one click.
Site address
11 GREEN STREET
City
CHRISTIANA
State
PA
ZIP
17509
Mailing
PO BOX 146128, PHILADELPHIA, PA 19160
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
333999
Employees
35
Ownership type
A

21 citations on file for this inspection.

1910.37 A02

Deleted Serious Gravity 10 1 instance 35 exposed
Issued
Sep 21, 2018
Abate by
Sep 28, 2018
Penalty
Initial $9,054 · Current $0 Reduced
29 CFR 1910.37(a)(2): Exit routes were not arranged so that employees would not have to travel toward a high hazard area, nor was the path of travel effectively shielded from the high hazard area by suitable partitions or other physical barriers:  a) Main entrance- The employer stored propane in the entrance/egress that employees had to use to come to work.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $0
  • — C (S) $9054
  • — Z (S) $9054

1910.110 B17 V

Deleted Serious Gravity 10 1 instance 5 exposed
Issued
Sep 21, 2018
Abate by
Sep 28, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.110(b)(17)(v): Open flames were permitted within classified areas specified in Table H-28:  a) Propane storage - The employer allowed smoking next to the propane storage tanks on or about April 11, 2018.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1910.95 D01

Serious Gravity 5 1 instance 2 exposed
Issued
Sep 21, 2018
Penalty
Initial $6,467 · Current $4,773 Reduced

Hazardous substances 8111

29 CFR 1910.95(d)(1): When information indicated that any employee's exposure equaled or exceed the 8-hour time-weighted average of 85 decibels, the employer did not develop and implement a monitoring program:    (a) Welding and Grinding Area - The employer did not conduct noise monitoring to determine if any employee's exposure equaled or exceeded the 8-hour time-weighted average of 85 decibels, one employee was exposed to an eight-hour time weighted average of 91.0 another was exposed to an eight hour time-weighted average of 86.2, on or about April 11, 2018.    No abatement certification or documentation required.
Recent events (3)
  • — F (S) $4773
  • — C (S) $6467
  • — Z (S) $6467

1910.95 G06

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 21, 2018
Abate by
Oct 26, 2018
Penalty
Initial $6,467 · Current $4,773 Reduced

Hazardous substances 8111

29 CFR 1910.95(g)(6): At least annually after obtaining the baseline audiogram, the employer did not obtain a new audiogram for each employee exposed at or above an 8-hour time-weighted average of 85 decibels :    (a) Welding - The employer did not obtain an audiogram within twelve months of the employee's original baseline test that was conducted on December 5, 2016, on or about April 11, 2018.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $4773
  • — C (S) $6467
  • — Z (S) $6467

1910.95 K02

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 21, 2018
Abate by
Oct 26, 2018
Penalty
Initial $0 · Current $0

Hazardous substances 8111

29 CFR 1910.95(k)(2): The training program was not repeated annually for each employee included in the hearing conservation program:  (a) Welding - The employer did not provide annual noise training for an employee whose 8-hour time-weighted average was 91 decibels on the A weighted scale for an eight-hour time weighted average, on or about April 11, 2018.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1910.110 B05 III

Deleted Serious Gravity 5 1 instance 5 exposed
Issued
Sep 21, 2018
Abate by
Oct 3, 2018
Penalty
Initial $6,467 · Current $0 Reduced
29 CFR 1910.110(b)(5)(iii): When LP-Gas and one or more other gases were stored or used in the same area, the employer did not ensure that the containers were marked to identify their content:  a) Propane storage area - The portable propane fuel tanks were not labeled as to the contents on or about April 11, 2018.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $0
  • — C (S) $6467
  • — Z (S) $6467

1910.132 D01

Deleted Serious Gravity 5 1 instance 15 exposed
Issued
Sep 21, 2018
Abate by
Oct 3, 2018
Penalty
Initial $7,760 · Current $0 Reduced
29 CFR 1910.132(d)(1): The employer did not assess the workplace to determine if hazards are present, or are likely to be present, which necessitate the use of personal protective equipment (PPE):  a) Facility - The employer did not assess the facility to determine what PPE was required for employees performing such task but not limited spray painting, grinding and cutting, on or about April 11, 2018.   Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $0
  • — C (S) $7760
  • — Z (S) $7760

1910.132 D02

Serious Gravity 5 1 instance 15 exposed
Issued
Sep 21, 2018
Abate by
Oct 3, 2018
Penalty
Initial $0 · Current $6,047
29 CFR 1910.132(d)(2): The employer did not verify, through a written certification, that the required workplace hazard assessment had been performed:      a) Facility - The employer did not certify that a workplace personal protective equipment hazard assessment had be completed on or about April 11, 2018.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $6047
  • — C (S) $0
  • — Z (S) $0

1910.212 A01

Serious Gravity 5 1 instance 3 exposed
Issued
Sep 21, 2018
Abate by
Oct 3, 2018
Penalty
Initial $6,467 · Current $4,773 Reduced
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks:    a) Machine Shop- The employer did not provide machine guarding on the unused portion of the blade of the Cosen SH-500M horizontal pivot band saw on or about April 11, 2018.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $4773
  • — C (S) $6467
  • — Z (S) $6467

1910.215 B09

Other-than-serious 1 instance 5 exposed
Issued
Sep 21, 2018
Abate by
Oct 3, 2018
Penalty
Initial $5,174 · Current $0 Reduced
29 CFR 1910.215(b)(9): The distance between the abrasive wheel periphery(s) and the adjustable tongue or the end of the safety guard peripheral member at the top exceeded one fourth inch:    a) Grinding Department - The tongue guard on the eight inch bench grinder was adjusted to five eights of an inch on or about April 11, 2018.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (O) $0
  • — C (S) $5174
  • — Z (S) $5174

1910.242 B

Serious Gravity 5 1 instance 5 exposed
Issued
Sep 21, 2018
Abate by
Oct 3, 2018
Penalty
Initial $5,174 · Current $3,480 Reduced
29 CFR 1910.242(b): Compressed air used for cleaning purposes was not reduced to less than 30 p.s.i.:    a) Machine Shop - The compressed air used for cleaning was measured at 80 p.s.i. on or about April 11, 2018.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $3480
  • — C (S) $5174
  • — Z (S) $5174

1910.243 C03

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Sep 21, 2018
Abate by
Oct 3, 2018
Penalty
Initial $5,174 · Current $0 Reduced
29 CFR 1910.243(c)(3): Abrasive wheels used on vertical portable grinder(s) (right angle head grinders) were not provided with safety guard(s) having a maximum exposure angle of 180 degrees and located between the operator and wheel:  a) Welding Area - The Dewalt DWE 402 did not have guarding to cover the spindle end, nut, and flanged projection on or about April 11, 2018.   Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $0
  • — C (S) $5174
  • — Z (S) $5174

1910.303 B02

Serious Gravity 5 2 instances 3 exposed
Issued
Sep 21, 2018
Abate by
Oct 3, 2018
Penalty
Initial $5,174 · Current $3,480 Reduced
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling:    a) Machine Shop Area - Romex wire was being used as an extension cord to power the shop light on or about April 11, 2018.     b) Behind powder coat booth #3 - Two extension cords were plugged into each other to power the dust collector on or about April 11, 2018.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $3480
  • — C (S) $5174
  • — Z (S) $5174

1910.305 G01 IV B

Serious Gravity 5 1 instance 5 exposed
Issued
Sep 21, 2018
Abate by
Oct 25, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.305(g)(1)(iv)(B): Flexible cords and cables were run through holes in walls, ceilings, or floors:  a) Welding and grinding - Extension cords powering the dust collector were run through a hole in the wall on or about April 11, 2018.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1910.305 G01 IV A

Serious Gravity 5 1 instance 4 exposed
Issued
Sep 21, 2018
Abate by
Oct 3, 2018
Penalty
Initial $5,174 · Current $3,480 Reduced
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and cables were used as a substitute for the fixed wiring of a structure:    a) Machine Shop - An orange flexible cord was used to power a fluorescent shop light.      Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $3480
  • — C (S) $5174
  • — Z (S) $5174

1910.305 G01 IV D

Serious Gravity 5 1 instance 3 exposed
Issued
Sep 21, 2018
Abate by
Oct 3, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.305(g)(1)(iv)(D): Flexible cords and cables were attached to building surfaces;  a) Machine Shop - A powered orange flexible cord used to power a fluorescent shop light, was observed secured to a steel chain hanging from a metal I beam on or before April 11, 2018.   Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1910.1200 E01

Serious Gravity 10 1 instance 15 exposed
Issued
Sep 21, 2018
Abate by
Oct 25, 2018
Penalty
Initial $9,054 · Current $7,360 Reduced
29 CFR 1910.1200(e)(1): Employer had not developed or implemented a written hazard communication program included the requirements outlined in 29 CFR 1910.1200(e)(1)(i) and (e)(1)(ii):    a) Facility - The employer did not develop and implement a hazard communication program for employees exposed to chemicals such as but not limited to 1,3,5-tri s(oxiranylmehtyl), 1,3,5-triazine-2,4,6(1H, 3H, 5H) -trione, methylene chloride, barium sulphate, Nickel, chromium, Triglycidyl isocyanurate and manganese on or about April 11, 2018.     Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (3)
  • — F (S) $7360
  • — C (S) $9054
  • — Z (S) $9054

1910.1200 G01

Serious Gravity 10 1 instance 15 exposed
Issued
Sep 21, 2018
Abate by
Oct 25, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(g)(1): Employers did not have a safety data sheet in the workplace for each hazardous chemical which they use:  a) Facility - The employer diid not have safety data sheet (SDSs) for the products they used containing chemicals such as but not limited to 1,3,5-tri s(oxiranylmehtyl), 1,3,5-triazine-2,4,6(1H, 3H, 5H) -trione, methylene chloride, barium sulphate, Nickel, chromium, Triglycidyl isocyanurate and manganese on or about April 11, 2018.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1910.1200 H01

Serious Gravity 10 1 instance 15 exposed
Issued
Sep 21, 2018
Abate by
Oct 25, 2018
Penalty
Initial $9,054 · Current $7,360 Reduced
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area:    a) Facility - The employer diid not provide training to employees who used chemicals such as but not limited to 1,3,5-tri s(oxiranylmehtyl), 1,3,5-triazine-2,4,6(1H, 3H, 5H) -trione, methylene chloride, barium sulphate, Nickel, chromium, Triglycidyl isocyanurate and manganese on or about April 11, 2018.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (3)
  • — F (S) $7360
  • — C (S) $9054
  • — Z (S) $9054

1910.95 I03

Deleted Other-than-serious 1 instance 2 exposed
Issued
Sep 21, 2018
Abate by
Oct 26, 2018
Penalty
Initial $726 · Current $0 Reduced

Hazardous substances 8111

29 CFR 1910.95(i)(3): Employees were not given the opportunity to select their hearing protectors from a variety of suitable hearing protectors provided by the employer:  (a) Welding - The employer did not provide a selection of hearing protection for employees to choose from on or about April 11, 2018.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (O) $0
  • — C (O) $726
  • — Z (O) $726

1910.215 D01

Deleted Other-than-serious 1 instance 5 exposed
Issued
Sep 21, 2018
Abate by
Oct 3, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.215(d)(1): Wheel(s) on grinding machine(s) were not sounded (ring test) and inspected for damage before mounting:  a) Polishing Department - Employer did not ensure that ring tests were conducted on the abrasive grinding discs before installation on or about April 11, 2018.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (O) $0
  • — C (O) $0
  • — Z (O) $0

View ALL Quality Machining & Finishing, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343080958.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.