GLENVIEW, IL —
OSHA Inspection: M.J.D. CONSTRUCTION, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of M.J.D. CONSTRUCTION, INC. in 2312 ROBINCREST, GLENVIEW, IL 60025 (NAICS 238160). OSHA activity number 343146478.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- M.J.D. CONSTRUCTION, INC.
- Site address
- 2312 ROBINCREST
- City
- GLENVIEW
- State
- IL
- ZIP
- 60025
- Mailing
- 1445 RIVER DRIVE, GLEN ELLYN, IL 60137
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 4
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.451 G01 I
- Issued
- Jun 18, 2018
- Abate by
- Jun 22, 2018
- Penalty
- Initial $4,268 · Current $2,500 Reduced
General-duty citation text
29 CFR 1926.451(g)(1)(i): Each employee on a boatswains' chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold was not protected by a personal fall arrest system: a) On or about May 9, 2018, employees were exposed to the hazard of falling approximately 18 feet while working from ladder jack scaffolding without the benefit of fall protection. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $2500
- — Z (S) $4268
1926.452 K05
- Issued
- Jun 18, 2018
- Abate by
- Jun 22, 2018
- Penalty
- Initial $3,049 · Current $1,500 Reduced
General-duty citation text
CFR 1926.452(k)(5): Scaffold platforms were bridged on to another: a) On or about May 9, 2018, employees were exposed to the hazard of falling approximately 18 feet where scaffold platforms were bridged together. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $1500
- — Z (S) $3049
1926.501 B13
- Issued
- Jun 18, 2018
- Abate by
- Jun 22, 2018
- Penalty
- Initial $4,268 · Current $3,000 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501(b): a) Front of Building - on or about May 9, 2018, employees were exposed to the hazard of falling while performing roofing work without fall protection from a pitched roof surface having a ground to eave height of approximately 12 feet. b) Front of Building - on or about May 9, 2018, employees were exposed to the hazard of falling while performing roofing work without fall protection from a pitched roof surface having a ground to eave height of approximately 18 feet. c) Rear of Building - on or about May 9, 2018, employees were exposed to the hazard of falling while performing roofing work without fall protection from a pitched roof surface having a ground to eave height of approximately 20 feet. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $3000
- — Z (S) $4268
More inspections at M.J.D. Construction, INC.
View M.J.D. Construction, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238160)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343146478.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.