OSHA Inspection: MCH CONSTRUCTION INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MCH CONSTRUCTION INC. in 2-10 N SPRING STREET, CONCORD, NH 03301 (NAICS 238160). OSHA activity number 343394763.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch MCH Construction INC. — free Get an email when a new federal OSHA severe-injury report for MCH Construction INC. is published. One employer, no account, unsubscribe in one click.
Site address
2-10 N SPRING STREET
City
CONCORD
State
NH
ZIP
03301
Mailing
208 MT. HOPE ST., LOWELL, MA 01854
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
7
Ownership type
A

5 citations on file for this inspection.

1903.19 C01

Other-than-serious 3 instances 3 exposed
Issued
Jan 31, 2019
Abate by
Feb 6, 2019
Penalty
Initial $319 · Current $319
29 CFR 1903.19(c)(1): Within 10 calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section:  a.    The employer did not furnish the abatement required for citations issued within 10 calendar days for Citation 1 Item 1a nor did they respond to the progress report letter sent January 16, 2019.  b.The employer did not furnish the abatement required for citations issued within 10 calendar days for Citation 1 Item 2 nor did they respond to the progress report letter sent January 16, 2019.   c.  The employer did not furnish the abatement required for citations issued within 10 calendar days for Citation 1 Item 3, nor did they respond to the progress report letter sent January 16, 2019.  d.    The employer did not furnish the abatement required for citations issued within 10 calendar days for Citation 2 Item 1, nor did they respond to the progress report letter sent January 16, 2019.
Recent events (1)
  • — Z (O) $319

1926.20 B02

Serious Gravity 5 1 instance 7 exposed
Issued
Oct 18, 2018
Abate by
Oct 24, 2018
Penalty
Initial $3,049 · Current $3,049
29 CFR 1926.20(b)(2): The employer did not initiate and maintain programs which provided for frequent and regular inspections of the job site, materials and equipment to be made by a competent person(s):  Site- Employees were not protected from fall and struck by hazards where the employer did not provide for frequent and regular inspections of the jobsite to be conducted by a competent person.
Recent events (1)
  • — Z (S) $3049

1926.102 A01

Serious Gravity 5 1 instance 3 exposed
Issued
Oct 18, 2018
Abate by
Oct 24, 2018
Penalty
Initial $3,049 · Current $3,049
29 CFR 1926.102(a)(1): 1926.102(a)(1): Employees were not provided with eye and face protection equipment when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents:  Site- Employees operating pneumatic nail guns were not protected from eye injuries where eye protection was not required to be worn.
Recent events (1)
  • — Z (S) $3049

1926.503 A01

Serious Gravity 5 1 instance 6 exposed
Issued
Oct 18, 2018
Abate by
Nov 6, 2018
Penalty
Initial $3,049 · Current $3,049
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards:  Site- Each employee exposed to a fall hazard was not provided with fall protection training from the employer.
Recent events (1)
  • — Z (S) $3049

1926.501 B13

Repeat Gravity 10 1 instance 6 exposed
Issued
Oct 18, 2018
Abate by
Oct 24, 2018
Penalty
Initial $8,536 · Current $8,536
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):   Site- Employees working from the roof were not protected from falls between approximately 24 and 30 feet where fall protection was not utilized.  MCH Construction Inc. was previously cited for a violation of this occupational safety and health standard which was contained in OSHA inspection number 1215799, citation number 1, item number 1, and was affirmed as a final order on June 2, 2017 with respect to a workplace located at Tanager Circle, Pelham, NH 03076.
Recent events (1)
  • — Z (R) $8536

View MCH Construction INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343394763.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.