SOUDERTON, PA —
OSHA Inspection: WINRO CONTRACTORS, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of WINRO CONTRACTORS, INC. in 13-25 N. SCHOOL LANE, SOUDERTON, PA 18964 (NAICS 238130). OSHA activity number 343517496.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- WINRO CONTRACTORS, INC.
- Site address
- 13-25 N. SCHOOL LANE
- City
- SOUDERTON
- State
- PA
- ZIP
- 18964
- Mailing
- 12 SHETLAND LANE, WILLINGBORO, NJ 08046
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 6
- Ownership type
- A
Citations
5 citations on file for this inspection.
1926.150 C01 I
- Issued
- Mar 28, 2019
- Penalty
- Initial $3,031 · Current $3,031
General-duty citation text
29 CFR 1926.150(c)(1)(i): A fire extinguisher, rated not less than 2A, was not provided for each 3,000 square feet of the protected building area, or major fraction thereof: a) Construction site, unit block 13-25 - On or about October 4, 2018, fire extinguishers were not present during construction of a multi-unit block of townhomes.
Recent events (1)
- — Z (S) $3031
1926.252 A
- Issued
- Mar 28, 2019
- Penalty
- Initial $5,304 · Current $5,304
General-duty citation text
29 CFR 1926.252(a): An enclosed chute of wood, or equivalent material, was not used where materials were dropped more than 20 feet to points lying outside the exterior walls of the building(s): a) Construction site, Roof of unit block 13-25 - On or about October 4, 2018, employees threw cut off portions of roof sheathing from the roof more than 20 feet to the ground below, exposing employees walking/working below to serious injury from the falling debris.
Recent events (1)
- — Z (S) $5304
1926.501 B13
- Issued
- Mar 28, 2019
- Penalty
- Initial $4,546 · Current $4,546
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): b) Construction site, 2nd and 3rd floor units 19 & 21 - On or about October 4, 2018, employees worked/walked near unguarded floor openings for stairs exposing them to fall hazards greater than 6 feet.
Recent events (1)
- — Z (S) $4546
1926.602 C01 VIII
- Issued
- Mar 28, 2019
- Penalty
- Initial $5,304 · Current $5,304
General-duty citation text
29 CFR 1926.602(c)(1)(viii): A lift truck, equipped with vertical only, or vertical and horizontal controls elevatable with the lifting carriage or forks for lifting personnel, did not have the following precautions to include (A) Use of a safety platform firmly secured to the lifting carriage and/or forks (B) Means whereby personnel on the platform can shut off power to the truck (C) Protection from falling objects as indicated necessary by the operating conditions: a) Construction site, rear of unit block 13-25 - On or about October 4, 2018, the employer did not take precautions to protect an employee riding on unsecured wood sheathing on the forks of a Pettibone 8044, while accessing and transferring material to the second and third floor work area.
Recent events (1)
- — Z (S) $5304
1926.1051 A
- Issued
- Mar 28, 2019
- Penalty
- Initial $4,546 · Current $4,546
General-duty citation text
29 CFR 1926.1051(a): Stairway(s) or ladder(s) were not provided at all personnel points of access where there was a break in elevation of 19 inches (48 cm) or more, or no ramp, runway, sloped embankment, or personnel hoist was provided: a) Construction site, unit block 13-25 - On or about October 4, 2018, employees were exposed to serious injury while climbing the framing to access the second and third floor work areas with elevation changes greater than 19 inches.
Recent events (1)
- — Z (S) $4546
More inspections at Winro Contractors, INC.
View Winro Contractors, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238130)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343517496.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.