LANCASTER, PA —
OSHA Inspection: BRUBAKER, INCORPORATED
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of BRUBAKER, INCORPORATED in 1485 MANHEIM PIKE, LANCASTER, PA 17602 (NAICS 238220). OSHA activity number 343517819.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- BRUBAKER, INCORPORATED
- Site address
- 1485 MANHEIM PIKE
- City
- LANCASTER
- State
- PA
- ZIP
- 17602
- Mailing
- 1284 ROHRERSTOWN ROAD, LANCASTER, PA 17601
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238220
- Employees
- 3
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.501 B01
- Issued
- Dec 13, 2018
- Abate by
- Jan 10, 2019
- Penalty
- Initial $6,467 · Current $5,170 Reduced
General-duty citation text
29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems: a) Roof - Employees were observed working on the uppermost level of a multi-level flat roof and were not protected from an approximate 26 foot fall hazard to the ground below, on or about October 5, 2018. b) Roof - Employees were observed working on the uppermost level of a multi-level flat roof and were not protected from an approximate 8 foot fall hazard to the lower roof surface below, on or about October 5, 2018. c) Roof - Employees were observed working on the first level of a multi-level flat roof and was not protected from an approximate 18 foot fall hazard to the ground below, on or about October 5, 2018. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $5170
- — Z (S) $6467
1926.1051 A
- Issued
- Dec 13, 2018
- Abate by
- Jan 10, 2019
- Penalty
- Initial $6,467 · Current $6,460 Reduced
General-duty citation text
29 CFR 1926.1051(a): Stairways or ladders were not provided at all personnel points of access where there was a break in elevation of 19 inches (48 cm) or more, and no ramp, runway, sloped embankment, or personnel hoist was provided: a) Roof - On or about October 5, 2018, the employer had not installed stairs or a ladder for employees to access multiple levels of the roof area, requiring employees to climb over an approximate 2 foot high wall to gain access from the lower roof to an upper level roof. b) Roof - On or about October 5, 2018, the employer had not installed stairs or a ladder for employees to access multiple levels of the roof area, requiring employees to climb over an approximate 4 foot high wall to gain access from the lower roof to an upper level roof. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $6460
- — Z (S) $6467
1926.451 E01
- Issued
- Dec 13, 2018
- Abate by
- Jan 10, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access. a) Jobsite - An employee stood on and climbed the guardrails of a Genie-1930 scissors lift to access and egress the roof of a building, instead of positioning the machine so that direct access could be made within 24 inches above or below the point of access, on or about October 5, 2018. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at Brubaker, Incorporated
View Brubaker, Incorporated's full OSHA safety record →
More inspections in this industry (NAICS 238220)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343517819.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.