WINDSOR, CT —
OSHA Inspection: METAL IMPROVEMENT COMPANY, LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of METAL IMPROVEMENT COMPANY, LLC in 145 ADDISON ROAD, WINDSOR, CT 06095 (NAICS 332811). OSHA activity number 343548210.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- METAL IMPROVEMENT COMPANY, LLC
- Site address
- 145 ADDISON ROAD
- City
- WINDSOR
- State
- CT
- ZIP
- 06095
- Mailing
- 145 ADDISON ROAD, WINDSOR, CT 06095
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332811
- Employees
- 36
- Ownership type
- A
Citations
13 citations on file for this inspection.
1910.25 B01
- Issued
- Dec 6, 2018
- Abate by
- Jan 25, 2019
- Penalty
- Initial $4,712 · Current $3,298 Reduced
General-duty citation text
29 CFR 1910.25(b)(1): The employer did not ensure handrails, stair rail systems, and guardrail systems were provided in accordance with 1910.28: Shot Reclamation Platform: On, or about, November 8, 2018, the fixed stairs that provided access from the ground level to the first level was not provided with a midrail on the open side and a handrail on the closed side in accordance with Table D-2 as referenced by in 29 CFR 1910.28(b)(11)(ii). Abatement Note: 29 CFR 1910.29 provides specific design criteria for guardrail and handrail systems.
Recent events (2)
- — I (S) $3298.4
- — Z (S) $4712
1910.25 C04
- Issued
- Dec 6, 2018
- Abate by
- Jan 25, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.25(c)(4): Standard stairs did not have a minimum width of 22 inches (56 cm) between vertical barriers. Shot Reclamation Platform: On, or about, November 8, 2018, the access stairs from the ground level to the first level were measured to be 20 inches wide. The supports for the vertical opening were slightly narrower than the stairs.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.29 B01
- Issued
- Dec 6, 2018
- Abate by
- Jan 25, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.29(b)(1): The top edge height of top rails, or equivalent guardrail system members, were not 42 inches, plus or minus 3 inches, above the walking-working surface: Shot Reclamation Platform: On, or about, November 8, 2018, the top rail of the guardrail system provided on the first level was measured to be 36 inches high.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.29 B02 I
- Issued
- Dec 6, 2018
- Abate by
- Jan 25, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.29(b)(2)(i): Midrails were not installed at a height midway between the top edge of the guiderail system and the walking-working surface: Shot Reclamation Platform: On, or about, November 8, 2018, the guardrail provided along the edge of the stairway opening did not include a midrail.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.125 F03
- Issued
- Dec 6, 2018
- Abate by
- Jun 6, 2019
- Penalty
- Initial $4,712 · Current $3,298 Reduced
General-duty citation text
29 CFR 1910.125(f)(3): A cover that is closed by an approved automatic device for the automatic fire-extinguishing system was not installed: Cleaning Line: On, or about, October 18, 2018, the cover that was provided with a fusible link could not properly close due to the use of handled covers that projected above the top of the tank. The dip tank contained MIL-PRF-680, Type II, a category 4 flammable liquid.
Recent events (2)
- — I (S) $3298.4
- — Z (S) $4712
1910.125 F03 III
- Issued
- Dec 6, 2018
- Abate by
- Jun 6, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.125(f)(3)(iii): A cover that could be closed by an approved automatic device for the automatic fire-extinguishing system was not kept closed when the dip tank was not in use: Cleaning Line: On, or about, October 18, 2018, the dip tank that contained MIL-PRF-680, Type II, a category 4 flammable liquid, was not kept covered by the metal, self-closing cover when not in use.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.178 A04
- Issued
- Dec 6, 2018
- Penalty
- Initial $7,853 · Current $5,497 Reduced
General-duty citation text
29 CFR 1910.178(a)(4): Modifications and additions which affect capacity and safe operation of powered industrial truck were performed by the employer without the manufacturer's prior written approval and capacity, operation, and maintenance instruction plates, tags or decals of the powered industrial truck were not changed accordingly: Facility: On, or about, October 18, 2014, a barrel attachment was used with the CAT forktruck, serial number AT9020559, to move barrels of steel shot in the plant. The forktruck had not been evaluated and marked to show that the barrel lifter could be used and the reduced capacity of the forktruck when it was used. The estimated reduced capacity of the forktruck was 1,483 pounds. The weight of a full barrel of shot was estimated to be 1,837 pounds.
Recent events (2)
- — I (S) $5497.1
- — Z (S) $7853
1910.303 G01 I A
- Issued
- Dec 6, 2018
- Abate by
- Jan 25, 2019
- Penalty
- Initial $4,712 · Current $3,298 Reduced
General-duty citation text
29 CFR 1910.303(g)(1)(i)(A): For electric equipment operating at 600 volts, nominal, or less to ground, and likely to require examination, adjustment, servicing, or maintenance while energized, the depth of the working space in the direction of access to live parts (as measured from the live parts where they were exposed or from the enclosure front or opening whwere they were enclosed) was less than indicated in Table S-1 of Subpart S of Part 1910: Compressor Room: On, or about, October 18, 2018, a fresh air duct for the compressor was installed in the working space of the Westinghouse main distribution panel switchboard enclosure.
Recent events (2)
- — I (S) $3298.4
- — Z (S) $4712
1910.332 B01
- Issued
- Dec 6, 2018
- Abate by
- Jan 25, 2019
- Penalty
- Initial $6,282 · Current $4,397 Reduced
General-duty citation text
29 CFR 1910.332(b)(1): Employees were not trained in and familiar with the safety-related work practices required by 1910.331 through 1910.335 that pertained to their respective job assignments: Company: On, or about, November 8, 2018, an employee who performed maintenance or and around electrical equipment had not been trained regarding what work practices and protective equipment were required to protect him against electric shock, arc flash and arc blast hazards while performing live trouble-shooting and when verifying whether or not electrical equipment was properly de-energized. Abatement Note: At the time of the inspection, some flash gear could not be located. Ensure that personal protective equipment such as a helmet, face shield and fire resistive balaclava are provided for use by employees.
Recent events (2)
- — I (S) $4397.4
- — Z (S) $6282
1910.334 C02
- Issued
- Dec 6, 2018
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.334(c)(2): When there was a defect or evidence of damage that could expose an employee to injury, the defective or damaged item was not removed from service but was used before repairs and tests necessary to render the equipment safe had been performed: Company: On, or about, November 8, 2018, the red lead on a Fluke 336 multimeter/amprobe was damaged, exposing the copper wire.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.335 A01 II
- Issued
- Dec 6, 2018
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.335(a)(1)(ii): Protective equipment was not maintained in a safe, reliable condition and/or was not periodically inspected or tested: Company: On, or about, November 8, 2018, a pair of Salisbury Class voltage rated gloves had not been inspected since January, 2015.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.254 D07
- Issued
- Dec 6, 2018
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.254(d)(7): Electrode holders when not in use were not so placed that they could not make electrical contact with persons, conducting objects, fuel or compressed gas tanks: Aisle Outside Compressor Room: On, or about, October 18, 2018, an electrode was stored in the electrode holder for Lincoln Arc Welder, Idealarc R3R-300.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1910.304 A02
- Issued
- Dec 6, 2018
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.304(a)(2): Grounded conductors were attached to terminals or leads so as to reverse designated polarity: Magnaflux Booth: On, or about, October 18, 2018, a wall mounted receptacle provided to energize an inspection light showed reversed polarity when tested.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at Metal Improvement Company, LLC
View Metal Improvement Company, LLC's full OSHA safety record →
More inspections in this industry (NAICS 332811)
More inspections in CT
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343548210.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.