BETHLEHEM, PA —
OSHA Inspection: CERA-MET LLC
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of CERA-MET LLC in 2175 AVE. C, BETHLEHEM, PA 18017 (NAICS 331524). OSHA activity number 343639779.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CERA-MET LLC
- Site address
- 2175 AVE. C
- City
- BETHLEHEM
- State
- PA
- ZIP
- 18017
- Mailing
- 2175 AVE. C, BETHLEHEM, PA 18017
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 331524
- Employees
- 120
- Ownership type
- A
Citations
2 citations on file for this inspection.
1910.95 B01
- Issued
- Jan 28, 2019
- Abate by
- May 14, 2019
- Penalty
- Initial $11,934 · Current $5,967 Reduced
81108111
General-duty citation text
29 CFR 1910.95(b)(1): When employees were subjected to sound exceeding those listed in Table G-16, feasible administrative and/or engineering controls were not utilized: a) Cera-Met - On or about December 20, 2018, an employee operating a two person water blast cabinet, was exposed to a continuous noise at 140.0% of the permissible exposure level of 90 dBA or an 8 hour time weighted average (TWA) noise exposure of 92.4 dBA. This exposure occurred over a 410 minute sampling period. A zero exposure was assumed for the 70 minutes not sampled. The employer did not implement feasible administrative and/or engineering controls. Step 1: Submit to the area director a written, detailed plan of abatement outlining a schedule for the implementation of engineering and/or administrative measures to control employee exposure to hazardous noise levels as referenced in this citation. this plan shall include, at a minimum, target dates for the following actions which must be consistent with the abatement dates required by this citation: (1) Evaluation of engineering/administrative control options; (2) Election of optimum control methods and completion of design; (3) Procurement, installation and operation of selected control measures; and (4) Testing and acceptance or modification/redesign of controls. Ninety (90) day progress reports are required during the abatement period. (The 90 day requirement can be shortened or lengthened by the area director depending on the specific circumstances.) Step 2: abatement shall have been completed by the implementation of feasible engineering and/or administrative controls upon the verification of their effectiveness in achieving compliance. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $5967
- — Z (S) $11934
1910.95 K02
- Issued
- Jan 28, 2019
- Penalty
- Initial $0 · Current $0
81108111
General-duty citation text
29 CFR 1910.95(k)(2): The training program was not repeated annually for each employee included in the hearing conservation program: a) Cera-Met - On or about December 20, 2018, an employee operating a two person water blast cabinet, was exposed to a continuous noise at 140.0% of the permissible exposure level of 90 dBA or an 8 hour time weighted average (TWA) noise exposure of 92.4 dBA. This exposure occurred over a 410 minute sampling period. A zero exposure was assumed for the 70 minutes not sampled. The employer did not ensure that hearing conservation training was conducted for employees exposed over the action level of 85 dBA, on or about December 20, 2018. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at Cera-Met LLC
View Cera-Met LLC's full OSHA safety record →
More inspections in this industry (NAICS 331524)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343639779.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.