WILMINGTON, DE —
OSHA Inspection: INDUSTRIAL SERVICES GROUP, INC.
Federal Agency inspection · Safety discipline
At a glance
On , OSHA opened a federal Agency safety inspection of INDUSTRIAL SERVICES GROUP, INC. in 1000 FERRY ROAD, WILMINGTON, DE 19801 (NAICS 238320). OSHA activity number 343703401.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- INDUSTRIAL SERVICES GROUP, INC.
- Site address
- 1000 FERRY ROAD
- City
- WILMINGTON
- State
- DE
- ZIP
- 19801
- Mailing
- 318 NEELEY STREET, SUMTER, SC 29150
What kind of inspection was it?
- Inspection type
- Federal Agency (M)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238320
- Employees
- 9
- Ownership type
- A
Citations
5 citations on file for this inspection.
1926.407 B
- Issued
- Jul 8, 2019
- Abate by
- Aug 1, 2019
- Penalty
- Initial $13,260 · Current $0 Reduced
General-duty citation text
29 CFR 1926.407(b): Equipment, wiring methods, and installations of equipment in hazardous (classified) locations were not approved as intrinsically safe or approved for the hazardous (classified) location or safe for the hazardous (classified) location: (a) 1000 Ferry Road, Wilmington, Delaware - On or about January 10th, 2019, the employer failed to use lighting fixtures on the scaffolding that were intrinsically safe for use in a hazardous location.
Recent events (3)
- — J (S) $0
- — C (S) $13260
- — Z (S) $13260
1926.451 D03 I
- Issued
- Jul 8, 2019
- Abate by
- Aug 1, 2019
- Penalty
- Initial $13,260 · Current $6,981 Reduced
General-duty citation text
29 CFR 1926.451(d)(3)(i): Before the scaffold was used, direct connections were not evaluated by a competent person to confirm, based on the evaluation, that the supporting surfaces are capable of supporting the loads to be imposed: (a)1000 Ferry Road, Wilmington, DE - On or about January 10th, 2019, the employer failed to examine the direct connections to the roof and the floor of the tank to confirm that the supporting surfaces are capable of supporting the load of employees and materials. As a result employees were exposed to a potential scaffold collapse, as the direct connections were not evaluated.
Recent events (3)
- — J (O) $6980.8
- — C (S) $13260
- — Z (S) $13260
1926.451 G01 IV
- Issued
- Jul 8, 2019
- Abate by
- Feb 25, 2021
- Penalty
- Initial $132,598 · Current $132,598
General-duty citation text
29 C.F.R. 1926.451(g)(1)(iv): Each employee on a self-contained adjustable scaffold was not protected by a guardrail system (with minimum 200 pound toprail capacity) when the platform was supported by the frame structure, and by both a personal fall arrest system and a guardrail system (with minimum 200 pound toprail capacity) when the platform was supported by ropes. a) 1000 Ferry Road, Wilmington, DE � On or about January 9, 2019, employees were not protected by appropriate fall protection while working on a hybrid scaffold at an elevated position greater than ten feet above a lower level.
Recent events (3)
- — J (S) $132598
- — C (W) $132598
- — Z (W) $132598
1926.451 G03
- Issued
- Jul 8, 2019
- Abate by
- Aug 1, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(g)(3): Personal fall arrest systems used on scaffolds were not attached by lanyard to a vertical lifeline, horizontal lifeline, or scaffold structural member. a) 1000 Ferry Road, Wilmington, Delaware - On or about January 10th, 2019, the employer failed to allow employees to wear fall protection connected to a vertical, horizontal, or scaffold member where the mast and scaffold working level were rated for over five thousand (5,000) pounds required for a personal fall arrest system.
Recent events (3)
- — J (W) $0
- — C (W) $0
- — Z (W) $0
1926.451 G04 IV
- Issued
- Jul 8, 2019
- Abate by
- Feb 25, 2021
- Penalty
- Initial $132,598 · Current $132,598
General-duty citation text
29 CFR 1926.451(g)(4)(iv): Midrails were not installed at a height approximately midway between the top edge of the guardrail system and the platform surface: a) 1000 Ferry Road, Wilmington, DE � On or about January 9, 2019, employees were working on an elevated scaffold platform where the midrails were installed at a height less than approximately midway between the top edge of the guardrail system and the platform surface.
Recent events (3)
- — J (S) $132598
- — C (W) $132598
- — Z (W) $132598
More inspections at Industrial Services Group, INC.
View Industrial Services Group, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238320)
More inspections in DE
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343703401.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.