Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: BONNEVILLE POWER ADMINISTRATION, CUSTER SUBSTATION

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of BONNEVILLE POWER ADMINISTRATION, CUSTER SUBSTATION in 7357 PORTAL WAY, CUSTER, WA 98240 (NAICS 221121). OSHA activity number 343849576.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Bonneville Power Administration, Custer Substation — free Get an email when a new federal OSHA severe-injury report for Bonneville Power Administration, Custer Substation is published. One employer, no account, unsubscribe in one click.
Site address
7357 PORTAL WAY
City
CUSTER
State
WA
ZIP
98240
Mailing
914 AVENUE D, SNOHOMISH, WA 98290
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
221121
Employees
5
Ownership type
D

4 citations on file for this inspection.

1910.1001 J04 I

Serious Gravity 1 1 instance 2 exposed
Issued
Apr 18, 2019
Penalty
Initial $0 · Current $0

Hazardous substances 9020

29 CFR 1910.1001(j)(4)(i): The employer did not ensure labels or signs required by 29 CFR 1910.1001(j)(4)(i) for previously installed presumed asbestos-containing material (PACM) and/or other asbestos-containing material (ACM) were attached or posted in areas where they will be clearly notice by employees who are likely to be exposed:  a) Maintenance Building, no warning signs were posted where materials in the building were presumed to be asbestos containing materials (PACM).
Recent events (1)
  • — Z (S) $0

1910.147 C06 I

Other-than-serious 1 instance 2 exposed
Issued
Apr 18, 2019
Abate by
Jul 5, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(6)(i):The employer did not conduct a periodic inspection of the energy control procedure(s) at least annually to ensure that the procedure and the requirements of this standard are being followed:   a) Maintenance Building, where employees performed preventative maintenance and repairs on building equipment such as, but not limited to, the hardwired Ingersoll Rand air compressor.
Recent events (1)
  • — Z (O) $0

1910.147 C06 II

Other-than-serious 1 instance 2 exposed
Issued
Apr 18, 2019
Abate by
Jul 5, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(6)(ii): The employer did not certify that periodic inspections of the energy control procedures had been performed:   a) Maintenance Building, where employees performed preventative maintenance and repairs on building equipment such as, but not limited to, the hardwired Ingersoll Rand air compressor.
Recent events (1)
  • — Z (O) $0

1910.303 G01 II

Other-than-serious 1 instance 2 exposed
Issued
Apr 18, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.303(g)(1)(ii): Working space for equipment likely to require examination, adjustment, servicing, or maintenance while energized was used for storage:   a) Maintenance Garage, where items including, shovels and hot sticks were stored adjacent to circuit panel-A.
Recent events (1)
  • — Z (O) $0

View Bonneville Power Administration, Custer Substation's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343849576.