OSHA Inspection: MCSHANE WELDING COMPANY, INC.

Follow-up inspection · Safety discipline

On , OSHA opened a follow-up safety inspection of MCSHANE WELDING COMPANY, INC. in 12 PORT ACCESS ROAD, ERIE, PA 16507 (NAICS 332439). OSHA activity number 343871489.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Mcshane Welding Company, INC. — free Get an email when a new federal OSHA severe-injury report for Mcshane Welding Company, INC. is published. One employer, no account, unsubscribe in one click.
Site address
12 PORT ACCESS ROAD
City
ERIE
State
PA
ZIP
16507
Mailing
12 PORT ACCESS ROAD, ERIE, PA 16507
Inspection type
Follow-up (F)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332439
Employees
25
Ownership type
A

6 citations on file for this inspection.

1910.305 G01 IV

Serious Gravity 1 1 instance 3 exposed
Issued
Sep 17, 2019
Abate by
Oct 11, 2019
Penalty
Initial $1,932 · Current $1,352 Reduced
29 CFR 1910.305(g)(1)(iv): Flexible cords and/ or cables were used for purposes prohibited by paragraphs (A) through (F) of 29 CFR 1910.305(g)(1)(iv):  A.)  McShane Welding Company, Inc., 12 Port Access Road, Erie, PA  16507, northwest side of the building (Division 1), on or about March 22, 2019 and times prior thereto:  A flexible electrical cord was running under a garage door.  The flexible electrical cord was being used to power equipment including, but not limited to, a block heater on a diesel forklift truck.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1352.4
  • — Z (S) $1932

1910.303 G01 II

Serious Gravity 1 1 instance 3 exposed
Issued
Sep 17, 2019
Abate by
Oct 11, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.303(g)(1)(ii): The required working space about electric equipment rated 600 volts, nominal, or less to ground, was used for storage:  A.)  McShane Welding Company, Inc., 12 Port Access Road, Erie, PA  16507, southwest wall of the building (Division 1), on or about March 22, 2019 and times prior thereto:  Items including, but not limited to, a chop saw and a utility dolly were stored in front of the electrical disconnects.      ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.303 B07 I

Serious Gravity 1 1 instance 3 exposed
Issued
Sep 17, 2019
Abate by
Oct 11, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.303(b)(7)(i): Unused openings in boxes, raceways, auxiliary gutters, cabinets, equipment cases, or housings were not effectively closed to afford protection substantially equivalent to the wall of the equipment:  A.)  McShane Welding Company, Inc., 12 Port Access Road, Erie, PA  16507, southwest wall of the building at the chopsaw (Division 1), on or about March 22, 2019 and times prior thereto:  A 240-volt 3-phase electrical disconnect box had an uncovered unused opening on the lower right-hand side.    ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.178 A06

Other-than-serious 1 instance 2 exposed
Issued
Sep 17, 2019
Abate by
Oct 11, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.178(a)(6): The employer did not ensure that all nameplates or markings were maintained in a legible condition:  A.)  McShane Welding Company, Inc., 12 Port Access Road, Erie, PA  16507, northwest side of the building (Division 1), on or about March 22, 2019 and times prior thereto:  The load chart on the Clark forklift truck was illegible.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.179 L03 III D

Other-than-serious 1 instance 2 exposed
Issued
Sep 17, 2019
Abate by
Oct 11, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.179(l)(3)(iii)(d): Pendant control stations were not kept clean, and/or their function labels were not kept legible:  A.)  McShane Welding Company, Inc., 12 Port Access Road, Erie, PA  16507, Division 1, on or about March 22, 2019 and times prior thereto:  The buttons on the pendant control box for the 10-ton overhead crane was missing labels that identified the buttons functions.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.157 G02

Other-than-serious 2 instances 25 exposed
Issued
Sep 17, 2019
Abate by
Oct 21, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.157(g)(2): The educational program to familiarize employees with the general principles of fire extinguisher use and the hazards involved with incipient stage fire fighting was not provided to all employees upon initial employment, and at least annually thereafter:  A.)  McShane Welding Company, Inc., 12 Port Access Road, Erie, PA  16507, on or about March 22, 2019 and times prior thereto:  Employees are provided with, and permitted to use, portable fire extinguishers.  Employees had not had initial fire extinguisher training.   B.)  McShane Welding Company, Inc., 12 Port Access Road, Erie, PA  16507, on or about March 22, 2019 and times prior thereto:  Employees are provided with, and permitted to use, portable fire extinguishers.  Employees had not had annual fire extinguisher training.    ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View Mcshane Welding Company, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343871489.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.