Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of TYME TO BOWL LANE in 5 TYME WAY, OROVILLE, CA 95966 (NAICS 713290). OSHA activity number 343875720.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Tyme to Bowl Lane — free Get an email when a new federal OSHA severe-injury report for Tyme to Bowl Lane is published. One employer, no account, unsubscribe in one click.
Establishment
TYME TO BOWL LANE
Site address
5 TYME WAY
City
OROVILLE
State
CA
ZIP
95966
Mailing
5 TYME WAY, OROVILLE, CA 95966
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
713290
Employees
15
Ownership type
A

6 citations on file for this inspection.

1910.147 C01

Serious Gravity 1 1 instance 3 exposed
Issued
Apr 26, 2019
Abate by
May 21, 2019
Penalty
Initial $1,932 · Current $1,932
29 CFR 1910.147(c)(1): The employer did not establish a program consisting of an energy control procedure, employee training and periodic inspections to ensure that before any employee performed any servicing or maintenance on a machine or equipment where the unexpected energizing, startup or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source and rendered inoperative:   Bowling Alley:  Employees performing maintenance and repairs on pin setting machinery were exposed to hazards associated with the accidental release of stored energy types such as electrical and mechanical (belts and pulleys, pin setter).  Although a process is followed, procedures are not in writing and do not encompass the requirements of this section.
Recent events (1)
  • — Z (S) $1932

1910.147 C07 I A

Serious Gravity 5 1 instance 3 exposed
Issued
Apr 26, 2019
Abate by
May 21, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(7)(i)(A): Authorized employee(s) did not receive training in the recognition of applicable hazardous energy sources, the type and magnitude of the energy available in the workplace, and the methods and means necessary for energy isolate   Bowling Alley:  Authorized employees repair and maintain pin setting machines and are exposed to the unexpected release of stored energy types such as electrical and mechanical (belts, pulleys, pin setter); they have not received the required lock-out/tag-out training.
Recent events (1)
  • — Z (S) $0

1910.212 B

Serious Gravity 1 1 instance 3 exposed
Issued
Apr 26, 2019
Penalty
Initial $1,932 · Current $1,932
29 CFR 1910.212(b): Machine(s) designed for fixed location(s) were not securely anchored to prevent walking or moving:  Maintenance Work Bench:  A jet 6" bench grinder was not bolted down to the work bench.
Recent events (1)
  • — Z (S) $1932

1910.132 D01

Other-than-serious 1 instance 5 exposed
Issued
Apr 26, 2019
Abate by
May 21, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.132(d)(1): The employer did not assess the workplace determine if hazards are present, or are likely to be present, which necessitate the use of personal protective equipment (PPE):    Bowling Alley: The employer did not assess the workplace to determine if employees, particularly maintenance workers, should be required to wear personal protective equipment such as ear plugs or muffs to protect against excessive noise, and eye protection when performing mechanical maintenance duties or grinding metal pieces, and gloves when using chemical products for janitorial services.  The assessment needs to be written,  signed, and dated by the assessor.
Recent events (2)
  • — Z $400
  • — Z (O) $0

1910.305 G01 IV A

Other-than-serious 1 instance 3 exposed
Issued
Apr 26, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure:  Maintenance Bench:  An extension cord was used to energize a Jet 6" bench grinder instead of a fixed wired outlet.
Recent events (1)
  • — Z (O) $0

1910.305 G02 III

Other-than-serious 1 instance 3 exposed
Issued
Apr 26, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.305(g)(2)(iii): Flexible cords and cables were not connected to devices and fittings so that strain relief is provided that will prevent pull from being directly transmitted to joints and/or terminal screws.  Maintenance Bench:  An orange extension cord used to energize a Jet 6" bench grinder was showing strain at the female end.
Recent events (1)
  • — Z (O) $0

View Tyme to Bowl Lane's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343875720.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.