Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,198,547Inspections Most recent open 2026-09-01 Last loaded 2026-09-04

OSHA Inspection: STRAIGHT LINE PAINTING

Referral inspection · Health discipline

On , OSHA opened a referral health inspection of STRAIGHT LINE PAINTING in 4645 AVON LANE BUILDING #2, FRISCO, TX 75034 (NAICS 238320). OSHA activity number 343930277.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Straight Line Painting for free Get an email when a new federal OSHA severe-injury report for Straight Line Painting is published. One employer, no account, unsubscribe in one click.
Site address
4645 AVON LANE BUILDING #2
City
FRISCO
State
TX
ZIP
75034
Mailing
625 E. GANDY, DENISON, TX 75020
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
Non-union (B)
Opened
Case closed
Last modified
Data loaded
NAICS code
238320
Employees
4
Ownership type
Private (A)

7 citations on file for this inspection.

1910.134 C01

Serious Gravity 5 1 instance 3 exposed
Issued
Jul 9, 2019
Abate by
Aug 2, 2019
Penalty
Initial $2,273 · Current $1,364 Reduced
29 CFR 1910.134(c)(1): A written respiratory protection program that included the provisions in 29 CFR 1910.134(c)(1)(i) - (ix) with worksite specific procedures was not established and implemented for required respirator use: (Construction Reference 1926.103):  (a) On or about April 11, 2019 and times prior thereto, a written respiratory protection program was needed for painters who were assigned to use a 3M half facepiece elastomeric respirators. Employees used this product for protection against chemical inhalation hazards from Sherwin Williams ProMar 200, Sherwin Williams Wood Classic Fast Dry Oil Varnish, Startex Paint Thinner, Sherman Williams PVA Drywall Primer and Sealer when performing painting activities.
Recent events (2)
  • · I (S) $1363.8
  • · Z (S) $2273

1910.134 E01

Serious Gravity 5 1 instance 3 exposed
Issued
Jul 9, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.134(e)(1): The employer did not provide a medical evaluation to determine the employee's ability to use a respirator, before the employee was fit tested or required to use the respirator in the workplace: (Construction Reference 1926.103)(a):   (a) On or about April 11, 2019 and times prior thereto, the employer did not provide a medical evaluation for employee(s) who were required to wear a 3M half facepiece elastomeric respirators. Employees used this product for protection against chemical inhalation hazards from Sherwin Williams ProMar 200, Sherwin Williams Wood Classic Fast Dry Oil Varnish, Startex Paint Thinner, Sherman Williams PVA Drywall Primer and Sealer when performing painting activities.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1910.134 F02

Serious Gravity 5 1 instance 3 exposed
Issued
Jul 9, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.134(f)(2): Employee(s) using tight-fitting facepiece respirators were not fit tested prior to initial use of the respirator:  (a) On or about April 11, 2019 and times prior thereto, the employer did not provide a fit test for employee(s) who were required to wear a half mask negative pressure respirator. Employee(s) used this respirator for protection against chemical inhalation hazards from Sherwin Williams ProMar 200, Sherwin Williams Wood Classic Fast Dry Oil Varnish, Startex Paint Thinner, Sherman Williams PVA Drywall Primer and Sealer when performing painting activities.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1910.1200 E01

Serious Gravity 5 4 instances 3 exposed
Issued
Jul 9, 2019
Abate by
Aug 2, 2019
Penalty
Initial $2,842 · Current $1,705 Reduced
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met(Construction Reference: 1926.59):   On or about April 11, 2019 and times prior thereto,  the employer had not developed, implemented, and maintained a written hazard communication program for hazardous chemicals, which can result in lung cancer, reproductive hazards,  flammable liquids, skin irritation, and eye irritation. Hazardous chemicals included but not limited to:   (a) Sherwin Williams ProMar 200; (b) Sherwin Williams Wood Classic Fast Dry Oil Varnish; (c) Startex Paint Thinner; (d) Sherman Williams PVA Drywall Primer and Sealer.
Recent events (2)
  • · I (S) $1705.2
  • · Z (S) $2842

1910.1200 E01 I

Serious Gravity 5 4 instances 3 exposed
Issued
Jul 9, 2019
Abate by
Aug 2, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(e)(1)(i): The written hazard communication program did not include a list of the hazardous chemicals known to be present using an identity that was referenced on the appropriate material safety data sheet (Construction Reference: 1926.59):  At the jobsite, the employer had not developed, implemented, and maintained a written hazard communication program for hazardous chemicals, which can result in flammability hazards, fire and explosion hazards, skin corrosion, eye corrosion, carcinogenic hazards, poison hazards. Chemicals included but not limited to:   (a) Sherwin Williams ProMar 200; (b) Sherwin Williams Wood Classic Fast Dry Oil Varnish; (c) Startex Paint Thinner; (d) Sherman Williams PVA Drywall Primer and Sealer.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1910.1200 F06 I

Serious Gravity 5 1 instance 3 exposed
Issued
Jul 9, 2019
Abate by
Aug 2, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(f)(6)(i): Except as provided in 29 CFR 1910.1200(f)(7) and 29 CFR 1910.1200(f)(8), the employer did not ensure that each container of hazardous chemicals in the workplace was labeled, tagged or marked with the information required by 29 CFR 1910.1200(f)(1)(i) through 29 CFR 1910.1200(f)(1)(v) (Construction Reference 29 CFR 1926.59):   (a) On or about April 11, 2019 and times prior thereto, a water bottle was not labeled with the information required by 29 CFR 1910.1200(f)(1)(i) through 29 CFR 1910.1200(f)(1)(v). Employees were exposed to hazardous chemicals such as Startex Paint Thinner.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1910.1200 H01

Serious Gravity 5 4 instances 3 exposed
Issued
Jul 9, 2019
Abate by
Aug 2, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area:   On or about April 11, 2019 and times prior thereto, employees were not trained on the specific health hazards of the following hazardous chemical:  (a) Sherwin Williams ProMar 200; (b) Sherwin Williams Wood Classic Fast Dry Oil Varnish; (c) Startex Paint Thinner; (d) Sherman Williams PVA Drywall Primer and Sealer.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

View Straight Line Painting's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 343930277.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.