On , OSHA opened a planned safety inspection of WEBB CONTRACTOR CORPORATION in 165 PINE STREET, LAKEWOOD, NJ 08701 (NAICS 238140). OSHA activity number 343978326.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- WEBB CONTRACTOR CORPORATION
- Site address
- 165 PINE STREET
- City
- LAKEWOOD
- State
- NJ
- ZIP
- 08701
- Mailing
- 2 BALA PLAZA SUITE 300, BALA CYNWYD, PA 19004
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 15
- Ownership type
- A
Citations
8 citations on file for this inspection.
1926.100 A
- Issued
- Jun 14, 2019
- Abate by
- Jun 20, 2019
- Penalty
- Initial $5,304 · Current $5,304
General-duty citation text
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets: a- 165 Pine Street, Lakewood NJ: Company employees not wearing hard hats/head protection, were exposed to struck by hazards when working beneath company workers performing masonry activities using unsecured hand tools and equipment. Observed on or about 05/02/19. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (1)
- — Z (S) $5304
1926.451 B01
- Issued
- Jun 14, 2019
- Abate by
- Jun 20, 2019
- Penalty
- Initial $5,304 · Current $5,304
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a- 165 Pine Street, Lakewood NJ: On or about 05/02/19, two company employees were exposed to fall hazards in excess of 10 feet to the ground surface below when working and walking from several supported scaffold systems whose walking and working surfaces were not fully planked between their front uprights. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (1)
- — Z (S) $5304
1926.451 B10
- Issued
- Jun 14, 2019
- Abate by
- Jun 20, 2019
- Penalty
- Initial $5,304 · Current $5,304
General-duty citation text
29 CFR 1926.451(b)(10): Scaffold components manufactured by different manufacturers were intermixed not allowing the components to fit together to maintain the scaffold's structural integrity: a- 165 Pine Street, Lakewood NJ: On or about 05/02/19, two company employees were exposed to fall hazards in excess of 10 feet to the ground surface below when working and walking from supported scaffold systems that contained end frames and cross braces manufactured by different manufacturers and did not maintain the scaffold's structural integrity. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (1)
- — Z (S) $5304
1926.451 C02
- Issued
- Jun 14, 2019
- Abate by
- Jun 20, 2019
- Penalty
- Initial $5,304 · Current $5,304
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, or uprights did not bear on base plates, mud sills or other adequate firm foundation: a- 165 Pine Street, Lakewood NJ: On or about 05/02/19, two company employees were exposed to fall hazards in excess of 10 feet to the ground surface below when working and walking from a supported scaffold system whose bottom end frame leg did not bear on an adequate, firm foundation. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (1)
- — Z (S) $5304
1926.451 E06 VI
- Issued
- Jun 14, 2019
- Abate by
- Jun 20, 2019
- Penalty
- Initial $5,304 · Current $5,304
General-duty citation text
29 CFR 1926.451(e)(6)(vi): Integral prefabricated scaffold access frames being used for access had a spacing greater than 16 3/4 inches: a- 165 Pine Street, Lakewood NJ: On or about 05/02/19, company employees were exposed to fall hazards in excess of 10 feet to the ground surface below when accessing and egressing the working levels of supported scaffolds using end frame openings that exceeded 16 3/4 inches. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (1)
- — Z (S) $5304
1926.451 F03
- Issued
- Jun 14, 2019
- Abate by
- Jun 20, 2019
- Penalty
- Initial $5,304 · Current $5,304
General-duty citation text
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity: a - 165 Pine Street, Lakewood NJ: On or about 05/02/19, two company employees were exposed to fall hazards in excess of 10 feet to the ground surface below when working and walking from several supported scaffold systems whose components were visibly bent, damaged, modified to accept the longer spans between the end frames, etc. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (1)
- — Z (S) $5304
1926.451 F04
- Issued
- Jun 14, 2019
- Abate by
- Jun 20, 2019
- Penalty
- Initial $5,304 · Current $5,304
General-duty citation text
29 CFR 1926.451(f)(4): Part(s) of a scaffold that were damaged or weakened, such that the scaffold's strength was less than that required by paragraph (a) of this section, were not immediately repaired, replaced, braced to meet those provisions, nor removed from service until repaired: a- 165 Pine Street, Lakewood NJ: On or about 05/02/19, two company employees were exposed to fall hazards in excess of 10 feet to the ground surface below when working and walking from several supported scaffold systems whose components were visibly bent, damaged, modified to accept the longer spans between the end frames, etc. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (1)
- — Z (S) $5304
1926.451 G01 VII
- Issued
- Jun 14, 2019
- Abate by
- Jun 20, 2019
- Penalty
- Initial $5,304 · Current $5,304
General-duty citation text
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. a- 165 Pine Street, Lakewood NJ: On or about 05/02/19, two company employees were exposed to fall hazards in excess of 10 feet to the ground surface below when working and walking from several supported scaffold systems whose walking and working surfaces were not provided with the required guard rail systems and these employees were not provided with a personal fall arrest system as an alternative. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.
Recent events (1)
- — Z (S) $5304
More inspections at Webb Contractor Corporation
View Webb Contractor Corporation's full OSHA safety record →
More inspections in this industry (NAICS 238140)
More inspections in NJ
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343978326.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.