Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: R & R PLASTER AND DRYWALL COMPANY, INC.

Unprogrammed Other inspection · Health discipline

On , OSHA opened an unprogrammed Other health inspection of R & R PLASTER AND DRYWALL COMPANY, INC. in 431 SCIENCE PARK RD, STATE COLLEGE, PA 16801 (NAICS 238310). OSHA activity number 344063029.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch R & R Plaster and Drywall Company, INC. — free Get an email when a new federal OSHA severe-injury report for R & R Plaster and Drywall Company, INC. is published. One employer, no account, unsubscribe in one click.
Site address
431 SCIENCE PARK RD
City
STATE COLLEGE
State
PA
ZIP
16801
Mailing
325 EASTERN DRIVE, # 100, HARRISBURG, PA 17111
Inspection type
Unprogrammed Other (I)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238310
Employees
50
Ownership type
A

4 citations on file for this inspection.

1926.1153 D02 I

Other-than-serious 1 instance 2 exposed
Issued
Sep 16, 2019
Abate by
Oct 21, 2019
Penalty
Initial $4,376 · Current $0 Reduced
29 CFR 1926.1153(d)(2)(i): The employer did not assess the exposure of each employee who was or may reasonably be expected to be exposed to respirable crystalline silica at or above the action level in accordance with either the performance option in paragraph (d)(2)(ii) or the scheduled monitoring option in paragraph (d)(2)(iii) of this section:    a) 431 Science Park Road - Employees working with USG-Sheetrock, All Purpose Joint Compound, Midweight were exposed to respirable crystalline silica from the employer not assessing the exposure of each employee, on or about June 6th, 2019.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (O) $0
  • — C (S) $4376
  • — Z (S) $4376

1926.1153 I02 I

Deleted Serious Gravity 1 1 instance 2 exposed
Issued
Sep 16, 2019
Abate by
Oct 3, 2019
Penalty
Initial $4,376 · Current $0 Reduced
29 CFR 1926.1153(i)(2)(i): The employer did not ensure that each employee covered by this section could demonstrate knowledge and understanding of at least the information contained in paragraphs (i)(2)(i)(A)-(i)(2)(i)(F) of this standard:  a) 431 Science Park Road - Employees working with USG-Sheetrock, All Purpose Joint Compound, Midweight were exposed to respirable crystalline silica from the employer not training employees on the hazards related to silica, on or about June 6th, 2019.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $0
  • — C (S) $4376
  • — Z (S) $4376

1910.1200 H01

Deleted Serious Gravity 1 1 instance 2 exposed
Issued
Sep 16, 2019
Abate by
Oct 3, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area:  a) 431 Science Park Road - Employees using USG-Sheetrock, All Purpose Joint Compound were not provided effective information and training on handling eye, skin and respiratory irritants, on or about June 6th, 2019.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $0
  • — C (S) $0
  • — Z (S) $0

1926.1153 G01

Deleted Other-than-serious 1 instance 50 exposed
Issued
Sep 16, 2019
Abate by
Oct 21, 2019
Penalty
Initial $0 · Current $0
29 CFR 1926.1153(g)(1): The employer did not establish and implement a written exposure control plan tailored to the company does, complying with the requirements of 1926.1153(g)(1)(I) through (iv):  a) Silica Control Program - The employer did not establish and implement a written silica control plan, on or about August 16th, 2019.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (O) $0
  • — C (O) $0
  • — Z (O) $0

View R & R Plaster and Drywall Company, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344063029.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.