PORTSMOUTH, VA —
OSHA Inspection: NORFOLK NAVAL SHIPYARD
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of NORFOLK NAVAL SHIPYARD in BUILDING 171, PORTSMOUTH, VA 23709 (NAICS 336611). OSHA activity number 344232079.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- NORFOLK NAVAL SHIPYARD
- Site address
- BUILDING 171
- City
- PORTSMOUTH
- State
- VA
- ZIP
- 23709
- Mailing
- BUILDING 1500 COMMANDER, PORTSMOUTH, VA 23709
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 336611
- Employees
- 1000
- Ownership type
- D
Citations
12 citations on file for this inspection.
1910.212 A01
- Issued
- Oct 30, 2019
- Abate by
- Nov 26, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks: a) Norfolk Naval Shipyard Building 171: On or about 08/13/2019, the Karmetal, model #500KSA, and serial #590-20 band-saw was not guarded to protection employees from a rotating worm gear. b) Norfolk Naval Shipyard Building 171: On or about 08/13/2019, multiple machine Lathes were not provided with a chuck guard thereby exposing employees to a possible hazard. c) Norfolk Naval Shipyard Building 171: On or about 08/13/2019, CNC lathes were used by bypassing the warning requirement to keep door shut during operation as a result employees were exposed to a possible hazard. d) Norfolk Naval Shipyard Building 171 section 400 Location J-2: On or about 08/14/2019, the Do-All vertical band saw #4215800114 used to cut metal the unused portion of the sawblade under the table was not guarded as a result exposed employees to a possible hazard. e) Norfolk Naval Shipyard Building 171 Toolmakers section D18: On or about 08/14/2019, the Do-All vertical band saw #06-457891277 used to cut metal the unused portion of the sawblade under the table was not guarded as a result exposed employees to a possible hazard. f) Norfolk Naval Shipyard Building 171 Nuclear Shop: On or about 08/14/2019, the Jet horizontal Band saw used to cut 6-inch pipe the unused portion of the sawblade was not guarded as a result exposed employee to a possible hazard. g) Nuclear Machinist Area Building 171: On or about 08/11/2019, the Birmingham Band saw #42150802146 used to cut mild steel the unused portion of the sawblade under the table was not guarded. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $0
1910.212 A05
- Issued
- Oct 30, 2019
- Abate by
- Nov 26, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.212(a)(5): Fan blade guards, where the periphery of the blades was less than seven feet above the floor or working level, had openings larger than one half inch: a) Norfolk Naval Shipyard Building 171: On or about 08/13/2019, a Port-A-Cool 2000 fan, serial #65203-02 had an approx. 3 inch gap between the mesh cover and housing thereby exposing employees to possible hazard. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $0
1910.213 I01
- Issued
- Oct 30, 2019
- Abate by
- Nov 26, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.213(i)(1): Non-working portion(s) of the blade of bandsaw(s) were not enclosed or guarded: a) Norfolk Naval Shipyard Building 171 Location D-18: On or about 08/13/2019, a vertical band saw, Equip #181-039089 used to cut wood, the unused portion of the sawblade under the table was not guarded as a result exposed employees to a possible hazard. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $0
1910.215 B09
- Issued
- Oct 30, 2019
- Abate by
- Nov 26, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.215(b)(9): The distance between the abrasive wheel periphery(s) and the adjustable tongue or the end of the safety guard peripheral member at the top exceeded one fourth inch: a) Norfolk Naval Shipyard Building 171: On or about 08/14/2019, the Cincinnati 10-inch bench grinder Model 104, serial #248656, tongue guard was measured 3/4 inches from the surface of the abrasive wheel, thereby exposing employees to possible flying fragments resulting from an exploding wheel. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $0
1910.242 B
- Issued
- Oct 30, 2019
- Abate by
- Nov 26, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.242(b): Compressed air used for cleaning purposes was not reduced to less than 30 p.s.i.: a) Norfolk Naval Shipyard Building 171: Sect-201, Loc-J16: On or about 08/14/2019, employees used compressed air set at 90 psi to clean parts and equipment. b) Norfolk Naval Shipyard Building 510 Code 930: On or about 08/14/2019, employee used compressed air set at 90psi for cleaning of parts and equipment. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $0
1910.303 G01 II
- Issued
- Oct 30, 2019
- Abate by
- Nov 26, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.303(g)(1)(ii): The required working space about electric equipment rated 600 volts, nominal, or less to ground, was used for storage: a) Norfolk Naval Shipyard Building 171 Section B-21: On or about 08/14/2019, the employer used the area in front of an electrical panel and disconnect box to store a pedestal fan and other materials. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $0
1910.305 A02 X
- Issued
- Oct 30, 2019
- Abate by
- Nov 26, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.305(a)(2)(x): Flexible cords and cables were not protected from accidental damage, as might be caused, for example, by sharp corners, projections, and doorways or other pinch points: a) Building 171, Toolmaker Column C2-thru C-5 Planners area: On or about 08/13/2019, multiple extension cords used to supply power to multiple computers and lights were routed between the sill and bottom rail of a metal door. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $0
1910.305 B01 II
- Issued
- Oct 30, 2019
- Abate by
- Nov 26, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.305(b)(1)(ii): Unused openings in boxes, cabinets, or fittings were not effectively closed: a) Norfolk Naval Shipyard Building 171, Column G-4 and G-18: On or about 08/13/2019, the unused openings on the electrical panels were not provided with knockout covers. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $0
1910.305 B02 I
- Issued
- Oct 30, 2019
- Abate by
- Nov 26, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.305(b)(2)(i): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose: a) Norfolk Naval Shipyard Building 171, Toolmakers Section G14: On or about 08/13/2019, an 115 volts electrical junction box was not provided with a cover to protect employees from a possible electrical shock hazard. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $0
1910.303 B02
- Issued
- Oct 30, 2019
- Abate by
- Nov 26, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions: a) Norfolk Naval Shipyard Building 171, Toolmaker Column C2-thru C-5: On or about 08/13/2019, extension cords were not used according to its listing and labeling in that multiple extension cords were connected together to supply power to office equipment and lights. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement. Notice 1 Item 2, 29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: as required by 29 CFR 1960.8(b): the yellow extension cords used to supply power to various appliances and a chop saw were not used in accordance with the listing and labeling in that one extension cord was plugged into another, thus exposing an employee to possible injuries. The employer was cited for the same standard and/or same hazard on August 09, 2017, Inspection #1254744, December 05, 2017, of final order/settlement and mean of abatement.
Recent events (1)
- — Z (R) $0
1910.157 E02
- Issued
- Oct 30, 2019
- Abate by
- Nov 26, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.157(e)(2): Portable fire extinguishers were not visually inspected at least monthly. a) Building 171, X06 Outside of Cleanliness Plug Issue: On or about 08/13/2019, a wall mounted ABC type fire extinguisher was last visually inspected on 05/01/2019, according to the attached tag. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (O) $0
1910.334 A02 I
- Issued
- Oct 30, 2019
- Abate by
- Nov 26, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.334(a)(2)(i): Portable cord and plug connected equipment and flexible cord sets (extension cords) were not visually inspected before use on any shift for external defects (such as loose parts, deformed and missing pins, or damage to outer jacket or insulation) and for evidence of possible internal damage (such as pinched or crushed outer jacket): a) Tool Maker section: On or about 08/13/2019, a visual inspection was not conducted for the black flexible cords plugged into the wall mounted receptacle where the extension cords were daisy chained to supply power to the Planner's Office. The outer jacket of the flexible cord was pulled away from the male attachment plug thus exposing the internal insulated wires. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (O) $0
More inspections at Norfolk Naval Shipyard
View Norfolk Naval Shipyard's full OSHA safety record →
More inspections in this industry (NAICS 336611)
More inspections in VA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344232079.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.