OSHA Inspection: MURRIETA CONSTRUCTION INC

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of MURRIETA CONSTRUCTION INC in 32687 PEZ LANDING LN, WESLEY CHAPEL, FL 33543 (NAICS 238140). OSHA activity number 344330733.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Murrieta Construction INC — free Get an email when a new federal OSHA severe-injury report for Murrieta Construction INC is published. One employer, no account, unsubscribe in one click.
Site address
32687 PEZ LANDING LN
City
WESLEY CHAPEL
State
FL
ZIP
33543
Mailing
PO BOX 722, DOVER, FL 33527
Inspection type
Unprogrammed Other (I)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
10
Ownership type
A

9 citations on file for this inspection.

1926.451 B01

Serious Gravity 5 1 instance 5 exposed
Issued
Mar 16, 2020
Penalty
Initial $3,470 · Current $3,470
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii):  a.  On or about September 24, 2019, at the jobsite, the tubular welded scaffolding used by employees was missing planking on the working level of the scaffold.
Recent events (1)
  • — Z (S) $3470

1926.451 B04

Serious Gravity 5 1 instance 5 exposed
Issued
Mar 16, 2020
Penalty
Initial $0 · Current $0
29 CFR 1926.451(b)(4): Each end of a platform, not cleated or otherwise restrained by hooks or equivalent means, did not extend over the centerline of its support at least 6 inches (15 cm):  a.  On or about September 24, 2019, at the jobsite, the tubular welded scaffolding used by employees had one plank installed and it extended three inches past the support brace.
Recent events (1)
  • — Z (S) $0

1926.452 C02

Serious Gravity 5 1 instance 5 exposed
Issued
Mar 16, 2020
Penalty
Initial $0 · Current $0
29 CFR 1926.452(c)(2): Tubular welded frame scaffold(s) were not properly braced by crossbracing or diagonal braces, or both, to secure vertical members laterally and to align them so that the erected scaffold was plumb, square, and rigid:  a.  On or about September 24, 2019, at the jobsite, the tubular welded scaffolding used by employees did not have cross bracing installed on both sides.
Recent events (1)
  • — Z (S) $0

1926.451 F07

Serious Gravity 10 1 instance 5 exposed
Issued
Mar 16, 2020
Penalty
Initial $0 · Current $0
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered by experienced and trained employees under the supervision of a competent person:  a.  On or about September 24, 2019, at the jobsite, untrained employees erected, worked on and dismantled tubular welded scaffolding without the supervision of a competent person. The scaffolding was missing cross bracing, the working levels of the scaffolding were not fully planked, and guardrails were not installed on the end section of one the scaffolds. Employees were exposed to fall hazards up to 16 feet 4 inches.
Recent events (1)
  • — Z (S) $0

1926.451 F03

Serious Gravity 10 1 instance 5 exposed
Issued
Mar 16, 2020
Penalty
Initial $4,048 · Current $4,048
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity:  a.  On or about September 24, 2019, at the jobsite, a competent person did not inspect the tubular welded scaffolding prior to employees working from the scaffolding. The scaffolding was missing cross bracing, the working levels of the scaffolding were not fully planked, and guardrails were not installed on the end section of one the scaffolds. Employees were exposed to fall hazards up to 16 feet 4 inches.
Recent events (1)
  • — Z (S) $4048

1926.454 B

Serious Gravity 10 1 instance 5 exposed
Issued
Mar 16, 2020
Abate by
Apr 9, 2020
Penalty
Initial $0 · Current $0
29 CFR 1926.454(b): The employer did not have each employee involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question:  a.  On or about September 24, 2019, at the jobsite, untrained employees erected, worked on and dismantled tubular welded scaffolding without the being trained on the proper methods of erecting scaffolding and the fall hazards of working from scaffolding. The scaffolding was missing cross bracing, the working levels of the scaffolding were not fully planked, and guardrails were not installed on the end section of one the scaffolds. Employees were exposed to fall hazards up to 16 feet 4 inches.
Recent events (1)
  • — Z (S) $0

1926.451 G01

Serious Gravity 5 1 instance 1 exposed
Issued
Mar 16, 2020
Penalty
Initial $2,892 · Current $2,892
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level:  a.  On or about September 24, 2019, at the jobsite, the tubular welded scaffolding employees were working from did not have guardrails on the ends and an employee was not protected from falling 16 feet 4 inches to the ground below.
Recent events (1)
  • — Z (S) $2892

1926.501 B13

Serious Gravity 5 1 instance 1 exposed
Issued
Mar 16, 2020
Penalty
Initial $2,892 · Current $2,892
29 CFR 1926.501(b)(13): Employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system or personal fall arrest systems:  a.  On or about September 24, 2019, at the jobsite, employees were building a concrete block wall on the second floor of a new residential property and the area just above the garage was not guarded.  An employee was observed standing directly at the unprotected edge, thus exposing the employee to a 11 foot 4 inch fall hazard.
Recent events (1)
  • — Z (S) $2892

1926.701 B

Serious Gravity 10 1 instance 5 exposed
Issued
Mar 16, 2020
Penalty
Initial $4,048 · Current $4,048
29 CFR 1926.701(b): All protruding reinforcing steel, onto and/or into which employees could fall, was not guarded to eliminate the hazard of impalement:  a.  On or about September 24, 2019, at the jobsite, employees were building a concrete block wall on the second floor of a new residential property and the area just above the garage had unprotected rebar extending upward, thus exposing employees to impalement hazards.
Recent events (1)
  • — Z (S) $4048

View Murrieta Construction INC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344330733.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.