OSHA Inspection: STUCCO PHILA LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of STUCCO PHILA LLC in 1017 E. MAIN STREET, GIRARD, PA 16417 (NAICS 238320). OSHA activity number 344348750.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Stucco Phila LLC — free Get an email when a new federal OSHA severe-injury report for Stucco Phila LLC is published. One employer, no account, unsubscribe in one click.
Establishment
STUCCO PHILA LLC
Site address
1017 E. MAIN STREET
City
GIRARD
State
PA
ZIP
16417
Mailing
15 FOREST AVENUE, LAWRENCEVILLE, NJ 08648
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238320
Employees
9
Ownership type
A

3 citations on file for this inspection.

1926.28 A

Serious Gravity 5 1 instance 4 exposed
Issued
Nov 15, 2019
Abate by
Dec 12, 2019
Penalty
Initial $1,932 · Current $1,352 Reduced
29 CFR 1926.28(a): The employer did not require the wearing of appropriate personal protective equipment in all operations where there is an exposure to hazardous conditions     A.) Stucco Phila LLC; 1017 E. Main Street, Girard, PA - On or about 10/2/19, and at times prior thereto, employees were not wearing hard hats when exposed to potential falling objects.  Employees were exposed to potential falling objects when working around, on and under scaffolding and erecting scaffolding.   ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1352.4
  • — Z (S) $1932

1926.451 H02

Serious Gravity 5 1 instance 4 exposed
Issued
Nov 15, 2019
Abate by
Dec 12, 2019
Penalty
Initial $0 · Current $0
29 CFR 1926.451(h)(2): Employees working below a scaffold were not protected from falling tools, materials or equipment in accordance with the provisions of paragraphs 29 CFR 1926.451 (h)(2)(i) through 29 CFR 1926.451 (h)(2)(v) of this section:    A.) Stucco Phila LLC; 1017 E. Main Street, Girard, PA - On or about 10/2/19, and at times prior thereto, employees were working around, on,  and under scaffolding that was not equipped with falling object protection.   ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 G04

Serious Gravity 5 1 instance 4 exposed
Issued
Nov 15, 2019
Abate by
Dec 12, 2019
Penalty
Initial $1,932 · Current $1,352 Reduced
29 CFR 1926.451(g)(4): Guardrail systems installed to meet the requirements of this section did not comply with the provisions listed in subparagraphs (i) through (xv) of this paragraph.   A.)  Stucco Phila, LLC; 1017 E. Main Street, Girard, PA - On or about 10/2/19, and at times prior thereto, employees were walking and working on a scaffold that did not have any mid rails.  Employees were performing stucco work to the exterior of the building and were exposed to a potential fall hazard of approximately 14 feet.    ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1352.4
  • — Z (S) $1932

View Stucco Phila LLC's full OSHA safety record →