OSHA Inspection: ALLEN DISTRIBUTION

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of ALLEN DISTRIBUTION in 1801 RITNER HWY, CARLISLE, PA 17015 (NAICS 493110). OSHA activity number 344597133.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Allen Distribution — free Get an email when a new federal OSHA severe-injury report for Allen Distribution is published. One employer, no account, unsubscribe in one click.
Establishment
ALLEN DISTRIBUTION
Site address
1801 RITNER HWY
City
CARLISLE
State
PA
ZIP
17015
Mailing
1801 RITNER HWY, CARLISLE, PA 17015
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
493110
Employees
670
Ownership type
A

3 citations on file for this inspection.

5(a)(1)

Serious Gravity 5 1 instance 8 exposed
Issued
May 12, 2020
Abate by
Feb 8, 2021
Penalty
Initial $9,639 · Current $13,494
OSH ACT of 1970 Section (5)(a)(1): OSHA ACT of Section (5)(a)(1):  The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to serious harm to employees exposed to being struck by and /or crushed by various sized metal cans:  a) 1801 Ritner Hwy - Employees attempting to remove various sized metal cans that become jammed throughout the conveyor system were exposed to caught-in hazards.l The employer did not ensure that an emergency stop pull cord was installed along the conveyor system, on or about January 30, 2020.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (S) $13494
  • — C (S) $9639
  • — Z (S) $9639

1910.36 G01

Other-than-serious Gravity 5 1 instance 8 exposed
Issued
May 12, 2020
Abate by
Feb 8, 2021
Penalty
Initial $7,711 · Current $0 Reduced
29 CFR 1910.36(g)(1): Ceiling of an exit route was not at least seven feet six inches.  Any projection from the ceiling must not reach a point less than six feet eight inches from the floor.   a) 1801 Ritner Hwy -  Employees working on labeling line 1 and 2 have to duck under the twist section of conveyor which was not at least six feet eight inches above the floor as a part of their egress, on or about January 31, 2020.   Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (3)
  • — F (O) $0
  • — C (S) $7711
  • — Z (S) $7711

1910.212 A03 II

Deleted Serious Gravity 5 2 instances 8 exposed
Issued
May 12, 2020
Abate by
Jun 29, 2020
Penalty
Initial $7,711 · Current $0 Reduced
29 CFR 1910.212(a)(3)(ii): Point of operation guards were not designed and constructed as to prevent the operator from having any part of their body in the danger zone during the operating cycle:  a) 1801 Ritner Hwy - The employer did not ensure that employees adjusting the reveal nut used to adjust the height of the labels on labeler 1 line 1 model # W704D6 serial number W70D6-650 were exposed to caught in hazards, on or about January 30, 2020.  b) 1801 Ritner Hwy - The employer did not ensure that employees adjusting the reveal nut used to adjust the height of the labels on labeler 1 line 2 model # W704D6 serial number W70D6-649 were exposed to caught in hazards, on or about January 30, 2020.  Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $7711

View Allen Distribution's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344597133.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.