OSHA Inspection: EFREN HERNANDEZ

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of EFREN HERNANDEZ in 1412 MOUNTAIN LAUREL LANE, MOODY, AL 35004 (NAICS 238140). OSHA activity number 344744958.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Efren Hernandez — free Get an email when a new federal OSHA severe-injury report for Efren Hernandez is published. One employer, no account, unsubscribe in one click.
Establishment
EFREN HERNANDEZ
Site address
1412 MOUNTAIN LAUREL LANE
City
MOODY
State
AL
ZIP
35004
Mailing
188 ESTES CIRCLE, ONEONTA, AL 35121
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
3
Ownership type
A

9 citations on file for this inspection.

1926.100 A

Serious Gravity 5 1 instance 2 exposed
Issued
Jul 8, 2020
Penalty
Initial $3,470 · Current $3,470
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets:  (a) On or about 05/07/2020 - 1412 Mountain Laurel Lane, Moody, AL, employee(s) exposed to falling bricks, tools, and other construction-related materials were not provided hard hats.
Recent events (1)
  • — Z (S) $3470

1926.451 H01

Serious Gravity 5 1 instance 2 exposed
Issued
Jul 8, 2020
Penalty
Initial $0 · Current $0
29 CFR 1926.451(h)(1): Each employee on a scaffold was not provided with additional protection from falling hand tools, debris, and other small objects through the installation of toe boards, screens, guardrail systems, or through the erection of debris nets, catch platforms, or canopy structures that contain or deflect the falling objects.  For falling objects too large, heavy or massive to be contained or deflected, the employer did not place and secure such potential falling objects away from the edge of the surface from which they could fall:  (a) On or about 05/07/2020 - 1412 Mountain Laurel Lane, Moody, AL, employee(s) working from fabricated frame scaffolding were exposed to falling bricks, tools, and other construction-related materials being used and/or stored on the upper levels.
Recent events (1)
  • — Z (S) $0

1926.451 B01

Serious Gravity 5 1 instance 1 exposed
Issued
Jul 8, 2020
Penalty
Initial $3,470 · Current $3,470
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guard rail supports:  (a) On or about 05/07/2020 - 1412 Mountain Laurel Lane, Moody, AL, employee(s) were exposed to fall hazards while working on a scaffold due to its planking having spaces greater than 1 inch on the scaffolding system with a height of approximately 13 feet, 9 inches from the working surface to the ground.
Recent events (1)
  • — Z (S) $3470

1926.451 C02

Serious Gravity 5 1 instance 2 exposed
Issued
Jul 8, 2020
Penalty
Initial $3,470 · Current $3,470
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames,  or uprights did not bear on base plates, mud sills or other adequate firm foundation:  (a) On or about 05/07/2020 - 1412 Mountain Laurel Lane, Moody, AL, scaffolding leg supports did not have base plates.
Recent events (1)
  • — Z (S) $3470

1926.451 C02 I

Serious Gravity 5 1 instance 2 exposed
Issued
Jul 8, 2020
Penalty
Initial $0 · Current $0
29 CFR 1926.451(c)(2)(i): Footings were not level, sound, rigid, and capable of supporting the loaded scaffold without settling or displacement:  (a) On or about 05/07/2020 - 1412 Mountain Laurel Lane, Moody, AL, the employer did not ensure the footings for scaffolds used to perform masonry work were level.
Recent events (1)
  • — Z (S) $0

1926.451 E01

Serious Gravity 5 1 instance 1 exposed
Issued
Jul 8, 2020
Penalty
Initial $2,313 · Current $2,313
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.  Cross braces were used as a means of access:  (a) On or about 05/07/2020 - 1412 Mountain Laurel Lane, Moody, AL, employee(s) were exposed to fall hazards of approximately 13 feet, 9 inches to the ground while climbing end frames of the fabricated frame scaffolding system.
Recent events (1)
  • — Z (S) $2313

1926.451 G04 I

Serious Gravity 5 1 instance 2 exposed
Issued
Jul 8, 2020
Penalty
Initial $3,470 · Current $3,470
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms:  (a) On or about 05/07/2020 - 1412 Mountain Laurel Lane, Moody, AL employees were exposed to fall hazards of approximately 13 feet, 9 inches while working from a fabricated frame scaffolding system where the sides and ends of the platforms were not guarded.
Recent events (1)
  • — Z (S) $3470

1926.454 A

Serious Gravity 5 1 instance 3 exposed
Issued
Jul 8, 2020
Penalty
Initial $0 · Current $0
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:  (a) On or about 05/07/2020 - 1412 Mountain Laurel Lane, Moody, AL, employees working from a scaffolding system to perform masonry work had not been trained.
Recent events (1)
  • — Z (S) $0

1910.1200 E01

Other-than-serious 1 instance 3 exposed
Issued
Jul 8, 2020
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(e)(1): Employer had not developed or implemented a written hazard communication program included the requirements outlined in 29 CFR 1910.1200(e)(1)(i) and (e)(1)(ii):   (a) On or about 05/07/2020 - 412 Mountain Laurel Lane, Moody, AL, a hazard communication program had not been developed and implemented for brick masons working with hazardous chemicals such as, but not limited to, Type N Masonry Cement.
Recent events (1)
  • — Z (O) $0

View Efren Hernandez's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 344744958.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.