Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: METHOD CONSTRUCTION LLC

Unprogrammed Other inspection · Health discipline

On , OSHA opened an unprogrammed Other health inspection of METHOD CONSTRUCTION LLC in 4753 N. BROADWAY, CHICAGO, IL 60640 (NAICS 236118). OSHA activity number 345330799.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Method Construction LLC — free Get an email when a new federal OSHA severe-injury report for Method Construction LLC is published. One employer, no account, unsubscribe in one click.
Site address
4753 N. BROADWAY
City
CHICAGO
State
IL
ZIP
60640
Mailing
1025 W. SUNNYSIDE AVENUE # 300, CHICAGO, IL 60640
Inspection type
Unprogrammed Other (I)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236118
Employees
15
Ownership type
A

2 citations on file for this inspection.

1926.62 D01 I

Serious Gravity 5 1 instance 1 exposed
Issued
Oct 27, 2021
Abate by
Dec 15, 2021
Penalty
Initial $3,511 · Current $2,100 Reduced

Hazardous substances 1591

29 CFR  1926.62(d)(1)(i):Each employer who had a workplace or operation covered by 29 CFR 1926.62 did not initially determine if any employee was exposed to lead at or above the action level of 30 micrograms per cubic meter of air (30 ug/m3) calculated as an 8-hour time-weighted average (TWA):  a) On May 20, 2021, Method Construction did not initially determine if an employee was exposed to lead at or above the action level of 30 micrograms per cubic meter of air (30 ug/m3) calculated as an 8-hour time-weighted average (TWA). An employee was performing demolition of walls and ceilings with paint that contained 0.1-0.3% lead.  In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $2100
  • — Z (S) $3511

1926.62 D01 III

Serious Gravity 5 1 instance 1 exposed
Issued
Oct 27, 2021
Abate by
Dec 15, 2021
Penalty
Initial $0 · Current $0

Hazardous substances 1591

29 CFR  1926.62(d)(1)(iii):The employer did not collect personal samples representative of a full shift, including at least one sample for each job classification in each work area, either for each shift or for the shift with the highest exposure level:  a) On or about May 20, 2021, Method Construction, did not collect person samples representative of a full-shift for an employee performing demolition of walls and ceilings containing 0.1-0.3% lead.  In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Method Construction LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345330799.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.