OSHA Inspection: PM ENGINEERED SOLUTIONS INC.

Federal Agency inspection · Safety discipline

On , OSHA opened a federal Agency safety inspection of PM ENGINEERED SOLUTIONS INC. in 140 COMMERCIAL STREET, WATERTOWN, CT 06795 (NAICS 332117). OSHA activity number 345421648.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch PM Engineered Solutions INC. — free Get an email when a new federal OSHA severe-injury report for PM Engineered Solutions INC. is published. One employer, no account, unsubscribe in one click.
Site address
140 COMMERCIAL STREET
City
WATERTOWN
State
CT
ZIP
06795
Mailing
140 COMMERCIAL STREET, WATERTOWN, CT 06795
Inspection type
Federal Agency (M)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332117
Employees
90
Ownership type
A

72 citations on file for this inspection.

5(a)(1)

Serious Gravity 5 3 instances 20 exposed
Issued
Jan 6, 2022
Abate by
Nov 30, 2023
Penalty
Initial $6,827 · Current $4,500 Reduced

Hazardous substances M102

Section 5(a)(l) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm, including severe burns, to employees in that employees were exposed to dust explosion, deflagration, or other fire hazards from improperly designed and installed dust collection systems:  In the following locations, dust collection systems exposed employees to potential fire and explosion hazards:  A.	Thermoset Department:  On, or about, July 28, 2021, employees were exposed to fire and/explosion hazards because the combustible and explosive plastic dust generated by several finishing machines traveled through a dust collection system which had no protective measures to detect, suppress, contain and isolate any combustible dust fires and/or explosions that were at risk of occurring in or entering the work area.  Note:  The dust collection system included collection hoods, ducts and the large blue dust collector.  B.	Plastics Finishing Department:  On, or about, August 27, 2021, employees were exposed to fire and/or explosion hazards because the combustible and explosive plastic and walnut shell dust generated by the following Wheelabrator abrasive blasting machines traveled through dust collection systems which had no protective measures to detect, suppress, contain and isolate any combustible dust fires and/or explosions that were at risk of occurring in or entering the work area.  Note:  The dust collection systems included ducts, dust collectors and a collection barrel.  1.	Old Wheelabrator. 2.	Blue Wheelabrator.
Recent events (5)
  • — P (S) $4500
  • — P (S) $4500
  • — P (S) $4500

1910.22 A03

Serious Gravity 1 1 instance 3 exposed
Issued
Jan 6, 2022
Penalty
Initial $4,096 · Current $3,000 Reduced
29 CFR  1910.22(a)(3):  The employer did not ensure that walking-working surfaces are maintained free of hazards such as sharp or protruding objects, loose boards, corrosion, leaks, spills, snow, and ice:   Metal Department, Tumbling Area:  On, or about, August 6, 2021, a transfer pipe was located across the threshold of the doorway that communicated with the solids press area, creating a tripping hazard.
Recent events (2)
  • — I (S) $3000
  • — Z (S) $4096

1910.29 B01

Serious Gravity 5 12 instances 1 exposed
Issued
Jan 6, 2022
Abate by
Sep 30, 2022
Penalty
Initial $6,827 · Current $5,000 Reduced
29 CFR  1910.29(b)(1): The employer did not ensure that  guardrail systems met the requirement that the top edge height of top rails, or equivalent guardrail system members, that are 42 inches (107 cm), plus or minus 3 inches (8 cm), above the walking-working surface:  Roof:  On, or about, October 1, 2021, roof mounted skylights were provided with a single chain as a guardrail equivalent.  The chains were not installed at a height of 42 inches, nominal, above the roof surface.  Employees were exposed to fall distances of up to approximately eighteen feet.
Recent events (4)
  • — P (S) $5000
  • — P (S) $5000
  • — I (S) $5000

1910.29 B02

Serious Gravity 5 12 instances 1 exposed
Issued
Jan 6, 2022
Abate by
Sep 30, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.29(b)(2):  The employer did not ensure that guardrail systems met the requirement that  midrails, screens, mesh, intermediate vertical members, solid panels, or equivalent intermediate members that are installed between the walking-working surface and the top edge of the guardrail system as follows when there is not a wall or parapet that is at least 21 inches (53 cm) high:  Roof:  On, or about, October 1, 2021, roof mounted skylights were provided with a single chain as a guardrail equivalent.  A midrail equivalent was not provided.  Employees were exposed to fall distances of up to approximately eighteen feet.
Recent events (4)
  • — P (S) $0
  • — P (S) $0
  • — I (S) $0

1910.37 A04

Serious Gravity 1 2 instances 40 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $4,096 · Current $3,000 Reduced
29 CFR 1910.37(a)(4): Safeguard(s) designed to protect employees during an emergency (e.g., sprinkler systems, alarm systems, fire doors, exit lighting), were not in proper working order at all times:  A. Thermoset Department, Door Leading to Front Office: On, or about, July 28, 2021, the exit sign fixture was not provided with a sign or a light.  B. Cafeteria: On, or about, October 27, 2021, the exit sign provided over each of the two exit doors was not lit.
Recent events (2)
  • — I (S) $3000
  • — Z (S) $4096

1910.37 B02

Serious Gravity 1 1 instance 2 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.37(b)(2):  Each exit was not clearly visible and marked by a sign reading "Exit":  Main Electrical Room:  On, or about, August 27, 2021, the door providing egress from the room was not provided with an exit sign.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.37 B04

Serious Gravity 1 1 instance 5 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.37(b)(4):  Signs were not posted along the exit access indicating the direction of travel to the nearest exit and exit discharge when the direction of travel to the exit or exit discharge was not immediately apparent:  Powdered Metal Storage Area:  On, or about August 6, 2021, signage was not provided to direct employees to the exit door located along the exterior wall.  The mold rack obscured the exit sign.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.101 B

Serious Gravity 1 2 instances 4 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $4,096 · Current $3,500 Reduced
29 CFR  1910.101(b):  The in-plant handling, storage, and utilization of all compressed gases in cylinders, portable tanks, rail tankcars, or motor vehicle cargo tanks were not in accordance with Compressed Gas Association Pamphlet P-1-1965, which is incorporated by reference as specified in CFR 1910.6:  Ref. 1968 CGA P-1, 3.3.1, Ref. 2006 CGA P-1, 5.7.4.  A.  Maintenance Shop:  On, or about, September 2, 2021, a cylinder of argon/carbon dioxide was stored, unsecured, against the back wall.    B.  Outside Cylinder Storage Area:  On, or about, September 2, 2021, three cylinders of acetylene and one of inert gas were stored, unsecured, in the fence enclosure.
Recent events (2)
  • — I (S) $3500
  • — Z (S) $4096

1910.253 B04 III

Serious Gravity 1 1 instance 4 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $0 · Current $0
29 CFR 1910.253(b)(4)(iii): Oxygen cylinders in storage were not separated from fuel-gas cylinders or combustible materials (especially oil or grease), a minimum distance of 20 feet (6.1 m) or by a noncombustible barrier at least 5 feet (1.5 m) high having a fire-resistance rating of at least one half hour:  Outside Cylinder Storage Area: On, or about, September 2, 2021, an oxygen cylinder was stored in the same enclosure as three acetylene cylinders.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.103 C05

Serious Gravity 5 1 instance 20 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $5,461 · Current $4,500 Reduced
29 CFR  1910.103(c)(5):  Weeds or similar combustibles were permitted within 25 feet of any liquified hydrogen equipment:   Hydrogen Tank:  On, or about, September 20, 2021, weeds had grown in the enclosure where the liquefied hydrogen tank was located.
Recent events (2)
  • — I (S) $4500
  • — Z (S) $5461

1910.110 B06 VI

Serious Gravity 5 1 instance 4 exposed
Issued
Jan 6, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.110(b)(6)(vi):  Readily ignitable material such as weeds and long dry grass shall be removed within 10 feet of any container.  Outside Cylinder Storage Area:  On, or about, September 2, 2021, dried leaves/weeds were allowed to accumulate where propane cylinders were stored.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.253 B04 I

Serious Gravity 5 1 instance 4 exposed
Issued
Jan 6, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.253(b)(4)(i):  Oxygen cylinders were stored near highly combustible material, especially oil and grease; or near reserve stocks of carbide and acetylene or other fuel-gas cylinders, or near other substance likely to cause or accelerate fire; or in an acetylene generator compartment:  Outside Cylinder Storage Area:  On, or about, September 2, 2021, dried leaves had accumulated when an oxygen cylinder was stored.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.125 F03 III

Serious Gravity 1 1 instance 6 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $4,096 · Current $3,000 Reduced
29 CFR  1910.125(f)(3)(iii):  A cover that could be closed by an approved automatic device for the automatic fire-extinguishing system was not kept closed when the dip tank was not in use:  Machining Department:  On, or about, September 20, 2021, the Safety Kleen Model 81 parts washer contained Safety-Kleen Premium solvent, a Category 4 flammable liquid.  The cover of the sink/tank was left open when not in use.
Recent events (2)
  • — I (S) $3000
  • — Z (S) $4096

1910.132 D01

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $6,827 · Current $5,000 Reduced
29 CFR  1910.132(d)(1):  The employer did not assess the workplace to determine if hazards are present, or are likely to be present, which necessitate the use of personal protective equipment (PPE):  Plant:  On, or about, September 20, 2021, the employer had not conducted a Personal Protective Hazard Assessment for the task of forktruck battery maintenance.
Recent events (2)
  • — I (S) $5000
  • — Z (S) $6827

1910.133 A01

Serious Gravity 5 2 instances 2 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.133(a)(1):  Protective eye and face equipment was not required where there was a reasonable probability of injury that could be prevented by such equipment:  A.  Plastics Department, Trim Station 0287:  On, or about, July 28, 2021, an employee was trimming parts using a table saw that was provided with a disc grinder.  The employee was not wearing safety glasses.  B.  Shipping and Receiving:  On, or about, September 20, 2021, an employee who opened the battery on the Toyota forktruck was not provided with a face shield to protect against being splashed from the corrosive battery electrolyte solution.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.151 C

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.151(c):Where employees were exposed to injurious corrosive materials, suitable facilities for quick drenching or flushing of the eyes and body were not provided within the work area for immediate emergency use:  Plant:  On, or about, September 20, 2021, an employee who performed maintenance on the battery provided on the Toyota forktruck was not provided with an eyewash within his work area.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.146 C04

Serious Gravity 10 1 instance 2 exposed
Issued
Jan 6, 2022
Abate by
Jan 31, 2023
Penalty
Initial $9,557 · Current $6,000 Reduced
29 CFR  1910.146(c)(4):  When the employer decided that its employees would enter permit spaces, the employer did not develop and implement a written permit space entry program that complied with 29 CFR 1910.146:  Powder Metal Department, Machine pits located under compacting presses:  On, or about, October 1, 2021, the company had not developed and implemented procedures for entry into permit required confined spaces for machine set-up, cleaning and/or repairs.
Recent events (3)
  • — P (S) $6000
  • — I (S) $6000
  • — Z (S) $9557

1910.147 C02 II

Serious Gravity 1 2 instances 2 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $4,096 · Current $3,500 Reduced
29 CFR  1910.147(c)(2)(ii):  An energy isolating device that was capable of being locked out, did not utilize a lockout device which rendered the machine or equipment inoperative:   A.  Metal Department, Metal Compacting:  On, or about, July 15, 2021, Press #47, an Alpha Press hydraulic metal compacting press had been under repair for approximately two weeks.  Instead of applying a lockout device, the electrical disconnect was secured in the "off" position using a plastic tie wrap.  B.  Plastics Department, Pill Room #2:  On, or about, August 6, 2021, a B.I.P. Engineering hydraulic pre-former had been under repair since July 22, 2021.  Instead of applying a lockout device, a tag was affixed over the circuit breaker with electrical tape.
Recent events (2)
  • — I (S) $3500
  • — Z (S) $4096

1910.147 C04 I

Serious Gravity 10 3 instances 8 exposed
Issued
Jan 6, 2022
Abate by
Dec 30, 2022
Penalty
Initial $9,557 · Current $5,400 Reduced
29 CFR  1910.147(c)(4)(i):  Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section:  A.	Plastics Division, Maintenance Area:  On, or about, July 14, 2021, lockout procedures had not been developed, implemented and utilized for the maintenance and servicing of Sterl-Tronic portable water heater, including what procedures needed to be taken for tests that needed to be performed while the equipment was under repair.    B.	Plastics Division:  On, or about, October 6, 2021, specific lockout procedures had not been developed for machines and equipment such as, but not limited to, horizontal injection molding machines, thermoset presses, ovens, forming machines, finishing equipment, dust collection equipment and a cooling tower.  C.	Thermoset Department:  On, or about, July 28, 2021, lock out procedures had not been developed, implemented and utilized for machinery and equipment that had been acquired by the company and brought into the plant approximately one year prior.  The equipment that was acquired included, but was not limited to, sixteen Bipel hydraulic thermoset presses.
Recent events (4)
  • — P (S) $5400
  • — P (S) $5400
  • — I (S) $5400

1910.147 C06 I

Serious Gravity 5 1 instance 8 exposed
Issued
Jan 6, 2022
Abate by
Dec 30, 2022
Penalty
Initial $6,827 · Current $4,000 Reduced
29 CFR  1910.147(c)(6)(i):  The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed:  Plant:  On, or about, October 6, 2021, machine specific lockout procedures that had been developed for machinery and equipment located in the metal compacting area had not been subject to a periodic review since they were developed in 1997.  Machine specific procedures developed for machinery and equipment located in the machining and furnaces area had not been subject to a periodic review since they were developed in 2000.
Recent events (4)
  • — P (S) $4000
  • — P (S) $4000
  • — I (S) $4000

1910.147 C07 I A

Serious Gravity 10 2 instances 2 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $9,557 · Current $4,000 Reduced
29 CFR  1910.147(c)(7)(i)(A): Authorized employee(s) did not receive training in the recognition of applicable hazardous energy sources, the type and magnitude of the energy available in the workplace, and the methods and means necessary for energy isolation and control:  A.  Plastics Division, Maintenance Area:  On, or about, July 14, 2021, an employee was assigned maintenance tasks that required that equipment be de-energized and lockout out.  The employee had not been provided with lockout/tagout training.  B.  Thermoset Department:  On, or about, July 28, 2021, an employee who was responsible for setting up and maintaining the Bipel hydraulic thermoset presses had not been provided with lockout/tagout training.
Recent events (2)
  • — I (S) $4000
  • — Z (S) $9557

1910.169 B03 I

Serious Gravity 1 5 instances 6 exposed
Issued
Jan 6, 2022
Abate by
Jun 30, 2023
Penalty
Initial $4,096 · Current $3,000 Reduced
29 CFR  1910.169(b)(3)(i):  Compressed air receiver(s) were not equipped with an indicating pressure gauge and  one or more spring-loaded safety valves:  A.  Powder Metal Department:  On, or about, September 10, 2021, a gauge and pressure relief valve were not provided on the air receiver tank on Press #87, a Yoshizuka mechanical compacting press.  B.  Powder Metal Department:  On, or about, September 10, 2021, a gauge and pressure relief valve were not provided on the air receiver tank on Press #94, a Yoshizuka mechanical compacting press.  C.  Powder Metal Department:  On, or about, September 10, 2021, a gauge and pressure relief valve were not provided on the air receiver tank on Press #82, a Yoshizuka mechanical compacting press.  D.  Powder Metal Department:  On, or about, September 29, 2021, a gauge and pressure relief valve were not provided on the air receiver tank on Press #80, a Dorst mechanical compacting press.  E.  Powder Metal Department:  On, or about, September 29, 2021, a gauge and a pressure relief valve were not provided on the air receiver tank on Press # 76, a Stokes mechanical compacting press.
Recent events (4)
  • — P (S) $3000
  • — P (S) $3000
  • — I (S) $3000

1910.178 A04

Serious Gravity 5 1 instance 6 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $5,461 · Current $4,000 Reduced
29 CFR  1910.178(a)(4):  Modifications and additions which affect capacity and safe operation of powered industrial truck were performed by the employer without the manufacturer's prior written approval.   Capacity, operation, and maintenance instruction plates, tags or decals of the powered industrial truck were not changed accordingly:  Furnace Room:  On, or about, September 2, 2021, the Yale forktruck, Model GLC050VXNRE083 was not marked to indicate the reduced capacity of the vehicle when a boom extension was used.
Recent events (2)
  • — I (S) $4000
  • — Z (S) $5461

1910.178 L04 III

Serious Gravity 5 1 instance 13 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $6,827 · Current $3,200 Reduced
29 CFR  1910.178(l)(4)(iii):  An evaluation of each powered industrial truck operator's performance was not being conducted at least once every three years:  Plant:  On, or about, July 14, 2021, employees who operated forktrucks had not been provided training since April, 2014.
Recent events (2)
  • — I (S) $3200
  • — Z (S) $6827

1910.178 P01

Serious Gravity 5 1 instance 8 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $6,827 · Current $3,200 Reduced
29 CFR  1910.178(p)(1):  Powered industrial truck(s) found to be in need of repair, defective, or in any way unsafe had not been  taken out of service until restored to safe operating condition(s):  Shipping:  On, or about, September 20, 2021, the battery provided on the Toyota forktruck was leaking acid solution.  The acid had dried and caked on the surface of the battery.
Recent events (2)
  • — I (S) $3200
  • — Z (S) $6827

1910.178 Q07

Serious Gravity 5 2 instances 13 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.178(q)(7):  Industrial trucks were not examined before being placed in service:  A.  Shipping:  On, or about, September 20, 2021, the emergency brake provided on the Yale forktruck, serial number A910V13485F, was loose/out of adjustment.  B.  Shipping:  On, or about, September 20, 2021, the battery provided on the Toyota forktruck was leaking acid solution.  The acid had dried and caked on the surface of the battery.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.184 E01

Serious Gravity 1 3 instances 3 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $4,096 · Current $2,000 Reduced
29 CFR  1910.184(e)(1):  Alloy steel sling(s) did not have permanently affixed durable identification stating size, grade, rated capacity, and reach:  A.  Thermoset Department, Tool & Die Bench:  On, or about, July 28, 2021, a J&L two legged chain alloy sling, serial number 8701050 had a worn identification tag.  The engraved capacity information was no longer legible.  B.  Furnace Room, Graphite Dip Tank:  On, or about, September 2, 2021, a two legged sling was not provided with an identification tag.  C.  Maintenance Shop:  On, or about, September 2, 2021, 2 two legged slings were joined on a shackle to make a four legged sling.  The identification tags on the 2 two legged slings were worn and were only partially legible.  The four legged sling assembly was not provided with a tag.
Recent events (2)
  • — I (S) $2000
  • — Z (S) $4096

1910.184 E02 I

Serious Gravity 1 1 instance 1 exposed
Issued
Jan 6, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.184(e)(2)(i):  Hooks, rings, oblong links, pear shaped links, welded or mechanical coupling links or other attachments did not have a rated capacity at least equal to that of the alloy steel chain with which they were used or the sling was used in excess of the rated capacity of the weakest component:  Maintenance Shop:  On, or about, September 2, 2021, 2 two legged slings were joined on a shackle to make a four legged sling.  The working load limit (WLL) stamped on the shackle indicated that it was rated for 1,500 pounds.  According to tabulated data for the size of the chain slings, the working load limit of the chain was at least 3,500 pounds.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.184 E03 I

Serious Gravity 1 4 instances 4 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.184(e)(3)(i):  A thorough periodic inspection of alloy steel chain slings was not made on a regular basis and/or were done at intervals greater than once every 12 months:  A.  Thermoset Department:  On, or about, July 28, 2021, a J&L two legged chain alloy sling, serial number 8701050, was not subject to periodic, documented inspections.  B.  Injection Molding Department, Near Machine #216:  On, or about, September 2, 2021, a two legged chain alloy sling, serial number 8701062, was not subject to periodic, documented inspections.   C.  Furnace Room, Graphite Dip Tank:  On, or about, September 2, 2021, a two legged chain alloy sling was not subject to periodic, documented inspections.  D.  Maintenance Shop:  On, or about, September 2, 2021, a four legged sling assembly that consisted of 2 two legged slings joined on a shackle was not subject to periodic, documented inspections.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.184 I09 III

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $5,461 · Current $4,000 Reduced
29 CFR  1910.184(i)(9)(iii):  Synthetic web sling(s) with snags, punctures, tears, or cuts were not immediately removed from service:  Powder Mixing Area:  On, or about, September 20, 2021, a Lift-All six foot long nylon sling was worn and damaged, exposing the inner red indicator threads.  The sling was used in a choker hitch to lift fiber barrels of metal powder.
Recent events (2)
  • — I (S) $4000
  • — Z (S) $5461

1910.212 A01

Serious Gravity 10 62 instances 26 exposed
Issued
Jan 6, 2022
Abate by
Aug 25, 2025
Penalty
Initial $9,557 · Current $4,000 Reduced
29 CFR  1910.212(a)(1):  One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks:  A.	Plastics Department:  On, or about, July 28, 2021, a chuck guard or similar protection was not provided on the following drill presses that were used to trim plastic components: 1.	Rockwell provided with a flap wheel. 2.	Craftsman provided with a stone wheel. 3.	Rockwell provided with a stone wheel. B.	Thermoset Department:  On, or about, July 28, 2021, a chuck guard or similar protection was not provided on Duracraft Model DP-1617 drill press. C.	MRB Room:  On, or about, August 6, 2021, a chuck guard or similar protection was not provided on the following drill presses used to trim plastic components: 1.	Craftsman (left) provided with a stone wheel. 2.	Craftsman (right) provided with a stone wheel. 3.	Delta provided with a stone wheel. D.	Thermoset Department:  On, or about, September 2, 2021, safeguarding was not provided on the back side of the following Bipel hydraulic presses:  1.	401. 2.	402. 3.	403. 4.	405. 5.	406. 6.	407. 7.	410. 8.	412. 9.	414. 10.	415. 11.	416. 12.	417. 13.	419. 14.	420. 15.	421. E.	Injection Molding Department:  On, or about, September 2, 2021, Machine #217, a Reed horizontal injection molding machine, was not provided with a cover over the back clamp that contained moving parts. F.	Maintenance Shop:  On, or about, September 2, 2021, safeguarding was not provided for the lead screw on Machine #0175, a Hardinge lathe,  that was used for threading.   G.	Tool Room:  On, or about, September 2, 2021, safeguarding was not provided for the lead screw on Machine #0174, a REM horizontal lathe.    H.	Machining Department:  On, or about, September 20, 2021, the following Brother CNC milling machines were in operation with the broken door interlocks:   1.	Machine 308.   2.	Machine 310.  	 I.	Machining Department:  On, or about, September 20, 2021, Machine #703, a Rockwell horizontal belt sander, was not provided with a guard on the backside to protect the in-running nip point created by the sanding belt running over the pulley.   J.	Machining Department:  On, or about, September 20, 2021:  The following Sunnen honing machine were provided with what appeared to be standard drill press chucks to facilitate a secondary operation.  The chucks had projections and did not present a smooth surface, creating the potential to catch clothing, gloves and hair.  Safeguarding was not provided to protect employees from rotating parts:   1.	Machine 1504. 2.	Machine 501. K.	Powder Mixing Area:  On, or about, September 20, 2021, openings were left in the interlocked doors providing access to the rotating conical mixer. L.	Powered Metal Department: The following presses were not provided with adequate safeguarding: 1.	On, or about, September 10:  Press #95, a Yoshizuka mechanical compacting press:  The sensing field of the light curtain provided for safeguarding was measured to be within the minimum safety distance allowed as determined using a stop time meter. 2.	On, or about, September 10:  The bottom hinged guard that provided protection against moving press components was not interlocked. 3.	On, or about, September 10, 2021:  Press #59, an Olivetti mechanical compacting press:  The hinged barrier guard was not interlocked and left a three inch gap between the guard and the die bed that allowed access to pinch points in the die area. 4.	On, or about, September 10, 2021:  Press #102, a Yoshizuka mechanical compacting press:  The sensing field of the light curtain provided for safeguarding was measured to be within the minimum safety distance allowed as determined using a stop time meter.  Also, a gap was left under the sensing field that allowed access to the die area.   5.	On, or about, September 10, 2021:  Press #87, a Yoshizuka mechanical compacting press:  The sensing field of the light curtain provided for safeguarding was measured to be within the minimum safety distance allowed as determined using a stop time meter.  Also, a gap was left between the light curtain bracket and the machine frame on the right side, allowing access to pinch points in the die area.   6.	On, or about, September 10, 2021:  Press #94, a Yoshizuka mechanical compacting press: The sensing field of the light curtain provided for safeguarding was measured to be within the minimum safety distance allowed as determined using a stop time meter.  Also, a gap below the sensing field of the light curtain allowed access to pinch points in the die area. 7.	On, or about, September 10, 2021:  Press # 82, Yoshizuka mechanical compacting press:  The sensing field of the light curtain provided for safeguarding was measured to be within the minimum safety distance allowed as determined using a stop time meter.  Also, a gap below the sensing field of the light curtain allowed access to pinch points in the die area. 8.	On, or about, September 10, 2021:  Press #70, Gasbarre mechanical compacting press:  The opening in the barrier guard allowed access to the point of operation, a cover was not provided on the lower portion of the machine, under the die bed and the press was provided with a single jog button that was within reach of the point of operation. 9.	On, or about, September 29, 2021:  Press #92, a Cincinnati mechanical compacting press:  The sensing field of the light curtain provided for safeguarding was measured to be within the minimum safety distance allowed as determined using a stop time meter.   10.	On, or about, September 29, 2021:  Press #117, Cincinnati mechanical compacting press:  The sensing field of the light curtain provided for safeguarding was measured to be within the minimum safety distance allowed as determined using a stop time meter.  Also, the guard that was provided on the lower portion of the press had a potion that had been cut out that allowed access to moving platens.   11.	On, or about, September 29, 2021:  Press #118, a Cincinnati mechanical compacting press:   The interlock switch provided for the hinged, lower press guard was not operational. 12.	On, or about, September 29, 2021:  Press #62, an Olivetti mechanical compacting press:  The hinged barrier guard was not interlocked and left a three inch gap between the guard and the die bed that allowed access to pinch points in the die area. 13.	On, or about, September 29, 2021:  Press #80, Dorst mechanical compacting press:  The sensing field of the light curtain provided for safeguarding was measured to be within the minimum safety distance allowed as determined using a stop time meter.  Also, the gap left below the light curtain allowed access to pinch points in the die area.  14.	On, or about, September 29, 2021:  Press #89, Dorst mechanical compacting press:  The sensing field of the light curtain provided for safeguarding was measured to be within the minimum safety distance allowed as determined using a stop time meter.  Gaps left under the light curtain and between the light curtain brackets and machine frame allowed access to the die area.  Also, the in-running nip point for a chain and sprocket located near the floor level on the right side of the press not fully guarded. 15.	On, or about, September 29, 2021:  Press #76, Stokes mechanical compacting press:  The opening in the barrier guard allowed access to the point of operation. 16.	On, or about, September 29, 2021, Press #48, a Gasbarre mechanical compacting press:  The sensing field of the light curtain provided for safeguarding was measured to be within the minimum safety distance allowed as determined using a stop time meter.   17.	On, or about, September 29, 2021:  Press #78, Gasbarre mechanical compacting press:  The lower section of the press located below the die bed was not provided with a guard.  During press operation, the components moved, creating pinch points.   18.	On, or about, September 29, 2021:  Press #79 Gasbarre mechanical compacting press:   The opening in the barrier guard allowed access to the point of operation.   19.	On, or about, September 29, 2021:  Press #85, Yoshizuka mechanical compacting press:  The sensing field of the light curtain was set too high, allowing access to pinch points created by the die.   20.	On, or about, September 29, 2021:  Press #86 Yoshizuka mechanical compacting press:  The sensing field of the light curtain provided for safeguarding was measured to be within the minimum safety distance allowed as determined using a stop time meter. 21.	On, or about, September 29, 2021:  Press #7, a straight sided hydraulic press, was not provided with safeguarding on the backside of the press. 22.	On, or about, September 29, 2021:  Press #63, a Federal partial revolution mechanical power press, was not provided with safeguarding for the pinch points created by the cam, connecting arm and cylinder assembly located on the left side of the press. 23.	On, or about, October 1, 2021:  Press #46, a Gasbarre mechanical compacting press:  The sensing field of the light curtain provided for safeguarding was measured to be within the minimum safety distance allowed as determined using a stop time meter. 24.	On, or about, October 1, 2021:  Press #71, a Gasbarre mechanical compacting press:  The sensing field of the light curtain provided for safeguarding was measured to be within the minimum safety distance allowed as determined using a stop time meter. 25.	On, or about, October 1, 2021:  Press #74, Gasbarre mechanical compacting press:  The sensing field of the light curtain provided for safeguarding was measured to be within the minimum safety distance allowed as determined using a stop time meter.  ADD IN REMAINING ITEMS IN WORD
Recent events (6)
  • — P (S) $4000
  • — P (S) $4000
  • — P (S) $4000

1910.212 A03 II

Serious Gravity 10 3 instances 7 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $9,557 · Current $4,000 Reduced
29 CFR  1910.212(a)(3)(ii):  Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s):  A.  Thermoset Department:  On, or about, July 28, 2021, Machine 306, a hydraulic forming press, was provided with a single lever to start the press for each cycle.  The second control button was not operational.   B.  Old Pill Room:  On, or about, July 28, 2021, the barrier guard provided on the Green preforming press allowed access to the point of operation by reaching under the guard.  C.  Plastics Finishing:  On, or about, August 27, 2021, the two hand controls provided on machine #21014, a Patton-MacGuyer press, did not incorporate an anti-tie down relay.
Recent events (2)
  • — I (S) $4000
  • — Z (S) $9557

1910.212 A04

Serious Gravity 5 4 instances 3 exposed
Issued
Jan 6, 2022
Abate by
Nov 30, 2023
Penalty
Initial $5,461 · Current $4,500 Reduced
29 CFR  1910.212(a)(4):  Revolving drum(s), barrel(s), or container(s) were not guarded by enclosure(s) which were interlocked with the drive mechanism so that the barrel(s), drum(s), or container(s) could not revolve unless the enclosure(s) were in place:  In the following locations, tumbling/spinning equipment was not provided with an interlocked enclosure:  A.	Metal Department, Tumbling Area:  On, or about, August 6, 2021, the following centrifuge driers were missing the linkage that required the brake to be activated before the lid could be opened:  1.	Machine 0224, Nobles. 2.	Machine 0225, Nobles.  B.	Plastics Finishing:  On, or about, August 27, 2021, the Henderson Bros. rotary tumbler was not provided with safeguarding.  C.	Plastics Finishing:  On, or about, August 27, 2021, Machine #358, a Wheelabrator Tumble Blast finishing machine, was not provided with a door interlock.
Recent events (4)
  • — P (S) $4500
  • — P (S) $4500
  • — I (S) $4500

1910.212 B

Serious Gravity 1 5 instances 2 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $4,096 · Current $3,500 Reduced
29 CFR  1910.212(b):  Machine(s) designed for fixed location(s) were not securely anchored to prevent walking or moving:  A. MRB Room:  On, or about, August 6, 2021, the following drill presses had not been anchored to the deburring work table:  1.  Craftsman (left). 2.  Delta provided with drill bit. 3.  Craftsman (right). 4.  Delta provided with stone wheel.  B.  Maintenance Shop:  On, or about, September 2, 2021, Machine # 0172, a Rockwell drill press, was not anchored to the floor.
Recent events (2)
  • — I (S) $3500
  • — Z (S) $4096

1910.215 A02

Serious Gravity 1 3 instances 3 exposed
Issued
Jan 6, 2022
Abate by
Jul 31, 2023
Penalty
Initial $4,096 · Current $2,500 Reduced
29 CFR  1910.215(a)(2):  Abrasive wheel(s) used on grinding machinery were not provided with safety guard(s) which covered the spindle end, nut, flange projections:  A.  Maintenance Shop:  On, or about, September 2, 2021, the hood guard provided on the Boyar-Shultz surface grinder did not cover the spindle, nut and flange projections.  B.  Machining Department:  On, or about, September 20, 2021, the side guard provided on the Landis OD grinder did not cover the flange.  C.  Powder Metal Department:  On, or about, September 29, 2021, the hood guard provided on the Boyar-Shultz surface grinder did not cover the flange.
Recent events (4)
  • — P (S) $2500
  • — P (S) $2500
  • — I (S) $2500

1910.215 B05

Serious Gravity 1 1 instance 1 exposed
Issued
Jan 6, 2022
Abate by
Oct 31, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.215(b)(5):  The angular exposure of grinding wheel periphery and sides for safety guards used on surface grinding machine(s) employing the wheel periphery exceeded 150 degrees:  Maintenance Shop:  On, or about, September 2, 2021, the hood guard provided on the Boyer-Shultz surface grinder allowed approximately 165 degrees of angular exposure.
Recent events (3)
  • — P (S) $0
  • — I (S) $0
  • — Z (S) $0

1910.215 A04

Serious Gravity 5 2 instances 3 exposed
Issued
Jan 6, 2022
Abate by
Oct 31, 2022
Penalty
Initial $5,461 · Current $4,000 Reduced
29 CFR  1910.215(a)(4):  Grinding machinery was not used with work rest(s) to support offhand grinding work or work rest(s) on grinding machinery were not adjusted closely to the wheel with a maximum opening of one eighth inch:  A.  Old Pill Room:  On, or about, July 28, 2021, the Central Machinery bench grinder was not provided with proper work rests.  The work rest on the right side was adjusted too far from the abrasive wheel and a work rest was not provided on the left side.  B.  Tool and Die Department:  On, or about, August 27, 2021, the Wilton bench grinder was not provided with properly adjusted work rests.  The work rests on both sides of the grinder were adjusted too far from the abrasive wheel.
Recent events (3)
  • — P (S) $4000
  • — I (S) $4000
  • — Z (S) $5461

1910.215 B09

Serious Gravity 5 2 instances 3 exposed
Issued
Jan 6, 2022
Abate by
Aug 1, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.215(b)(9):  Guard for abrasive wheel machine where the operator stands in front of the machine was not constructed so that the peripheral protecting member could be adjusted to the constantly decreasing diameter of the wheel or the distance between the abrasive wheel periphery(s) and the adjustable tongue or the end of the safety guard peripheral member at the top exceeded one fourth inch:  A.  Old Pill Room:  On, or about, July 28, 2021, the Central Machinery bench grinder was not provided with proper tongue guards.  The tongue guard provided on the right side was adjusted too far from the wheel and a tongue guard was not provided on the left side.  B.  Tool and Die Department:  On, or about, August 27, 2021, the Wilton bench grinder was not provided with properly adjusted tongue guards.  The tongue guards on both sides of the grinder were adjusted too far from the abrasive wheel.
Recent events (3)
  • — P (S) $0
  • — I (S) $0
  • — Z (S) $0

1910.217 B07 V A

Serious Gravity 10 2 instances 2 exposed
Issued
Jan 6, 2022
Abate by
Jul 31, 2023
Penalty
Initial $9,557 · Current $4,000 Reduced
29 CFR  1910.217(b)(7)(v)(a):  Each two-hand control for single stroke operations on mechanical power press(es) using part revolution clutches was not protected against unintended operation:  Powder Metal Department:  On, or about, September 29, 2021, the two hand control buttons provided on the following partial revolution mechanical power presses were not ringed or otherwise protected against accidental contact:  A.	Press #63. B.	Press #64.
Recent events (4)
  • — P (S) $4000
  • — P (S) $4000
  • — I (S) $4000

1910.217 C03 VIII C

Serious Gravity 10 1 instance 2 exposed
Issued
Jan 6, 2022
Abate by
Jul 31, 2023
Penalty
Initial $0 · Current $0
29 CFR  1910.217(c)(3)(viii)(c):  The safety distance between each two hand control device and the point of operation shall be greater than the distance determined by the formula contained in 29 CFR 1910.217(c)(3)(viii)(c):  Powder Metal Department:  On, or about, September 29, 2021, the two hand controls buttons provided on Press #64, a Federal partial revolution mechanical power presses were located within the minimum safety distance as determined using a stop time meter.
Recent events (4)
  • — P (S) $0
  • — P (S) $0
  • — I (S) $0

1910.217 C05 I

Serious Gravity 10 1 instance 2 exposed
Issued
Jan 6, 2022
Abate by
Jul 31, 2023
Penalty
Initial $0 · Current $0
29 CFR  1910.217(c)(5)(i):  Mechanical power press(es) where the operator feeds or removes parts by placing one or both hands in the point of operation, and a two hand control, presence sensing device, or type B gate or movable barrier guard is used, were not provided with a control system and brake monitor which comply with paragraphs (b)(13) and (14) of  this section:  Powder Metal Department:  On, or about, September 29, 2021, Press #64, a Federal partial revolution mechanical power press was provided with two hand controls to operate the press.  The press was not provided with a brake monitor to verify the proper operation of the dual solenoid valve at the completion of each press stroke.
Recent events (4)
  • — P (S) $0
  • — P (S) $0
  • — I (S) $0

1910.217 E01 I A

Serious Gravity 5 2 instances 2 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $6,827 · Current $4,000 Reduced
29 CFR  1910.217(e)(1)(i)(A):  Periodic and regular inspections of each power press were not conducted to ensure that all of its parts, auxiliary equipment, and safeguards, including clutch/brake mechanism, anti-repeat feature, and single-stroke mechanism, are in safe operating condition and adjustment:  Powder Metal Department:  On, or about, October 27, 2021, the employer had not conduct documented inspections of the two Federal partial revolution mechanical power presses to ensure that all press components, safeguards, auxiliary equipment and anti-repeat feature were in a safe operating condition.
Recent events (2)
  • — I (S) $4000
  • — Z (S) $6827

1910.218 A02 II

Serious Gravity 5 3 instances 1 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $5,461 · Current $4,000 Reduced
29 CFR  1910.218(a)(2)(ii):  There was no scheduling and recording of inspections of guards and point of operation protection devices at frequent and regular intervals for forging machine(s):  On, or about, October 27, 2021, the employer had not implemented a program of regular, documented inspections of forge equipment to ensure the safe operation of the following equipment:  A.	Furnace Room:  Forge #126. B.	Furnace Room:  Forge #72. C.	Powder Metal Department:  Forge #42.
Recent events (2)
  • — I (S) $4000
  • — Z (S) $5461

1910.219 B01

Serious Gravity 1 1 instance 2 exposed
Issued
Jan 6, 2022
Abate by
Jul 31, 2023
Penalty
Initial $4,096 · Current $2,700 Reduced
29 CFR  1910.219(b)(1):  Flywheel(s) with parts seven feet or less above floor(s) or platform(s) were not guarded in accordance with the requirements specified in 29 CFR 1910.219(b)(1)(i) through (b)(1)(iv):  Powder Metal Department:  On, or about, September 29, 2021, a guard was not provided on the flywheel of Press #63, a Federal partial revolution mechanical power press.
Recent events (4)
  • — P (S) $2700
  • — P (S) $2700
  • — I (S) $2700

1910.219 E01 I

Serious Gravity 5 3 instances 1 exposed
Issued
Jan 6, 2022
Abate by
Aug 1, 2022
Penalty
Initial $5,461 · Current $4,000 Reduced
29 CFR  1910.219(e)(1)(i):  Horizontal belts which had both runs seven feet or less from the floor level were not guarded with a guard that extended to at least fifteen inches above the belt:  MRB Room:  On, or about, August 6, 2021, the following drill presses were not provided with a guard over the horizontal change-speed belt:  A.  Drill press used for tapping. B.  Delta provided with a drill bit. C.  Delta provided with a stone wheel.
Recent events (3)
  • — P (S) $4000
  • — I (S) $4000
  • — Z (S) $5461

1910.219 E03 I

Serious Gravity 1 2 instances 3 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.219(e)(3)(i):  Vertical or inclined belt(s) were not enclosed by guard(s) conforming to the requirements specified at 29 CFR 1910.219(m) and (o):  A.  Injection Molding Department:  On, or about, September 2, 2021, a guard was not provided for the fan drive belt on the #6 Grieve-Hendry drying oven.  B.  Old Pill Room:  On, or about, October 27, 2021, the guard provided for the belt and pulley drive for Machine 0155, a table saw used to trim parts, was partially detached from the machine frame.  Also, the guard was open on the bottom face, allowing access to the belt and pulley drive.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.303 B01 VIII

Serious Gravity 5 1 instance 2 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $5,461 · Current $4,000 Reduced
29 CFR  1910.303(b)(1)(viii):  Electrical equipment was not free from recognized hazards based on other factors that contribute to the practical safeguarding of persons using or likely to come in contact with the equipment:   Machining Department:  On, or about, September 20, 2021, the replacement rotary table control box mounted on the rear of Machine #104, a Gardiner double disc grinder,  was not contained in an enclosure.  Coated electrical conductors were left open where they were subject to damage and contact.
Recent events (2)
  • — I (S) $4000
  • — Z (S) $5461

1910.303 B07 I

Serious Gravity 5 2 instances 4 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.303(b)(7)(i):  Unused openings in boxes, raceways, auxiliary gutters, cabinets, equipment cases, or housings were not effectively closed to afford protection substantially equivalent to the wall of the equipment:  A.  Plastics Finishing:  On, or about, August 27, 2021, a gap was left between the cover and the overcurrent devices in the large General Electric panelboard that energized presses in the work area.  B.  Main Electrical Room:  On, or about, August 27, 2021, cardboard was used to cover a gap between overcurrent devices and a blank panel on a General Electric switchboard enclosure.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.303 B07 IV

Serious Gravity 5 1 instance 2 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.303(b)(7)(iv):  There were damaged parts that may adversely affect safe operation or mechanical strength of the equipment, such as parts that are broken, bent, cut, or deteriorated by corrosion, chemical action or overheating:  Powder Metal Department:  On, or about, October 27, 2021, an electrical box that was provided on the right side of Press #49, an Alpha hydraulic metal compacting press, appeared to have been struck and damaged.  The box was hanging by the inner conductors, the liquid tight conduit was detached and the cover was hanging off.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.334 A02 II

Serious Gravity 5 2 instances 4 exposed
Issued
Jan 6, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.334(a)(2)(ii):  There was a defect or evidence of damage that could have exposed an employee to injury and the defective or damaged item was not removed from service:  A.  Plastics, Work Area for Machine #311:  On, or about, July 28, 2021, the power cord provided on the Dayton pedestal fan was damaged and wrapped with electrical tape.  B.  Thermoset Department, Machine #306:  On, or about, July 28, 2021, the orange extension cord used to energize a scale had a damaged outer jacket, exposing the inner conductors.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.303 B02

Serious Gravity 1 11 instances 24 exposed
Issued
Jan 6, 2022
Abate by
Sep 30, 2022
Penalty
Initial $4,096 · Current $3,000 Reduced

Hazardous substances M102

29 CFR  1910.303(b)(2):  Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling:  A.  Thermoset Department, Machine 306:  On, or about, July 28, 2021, a relocatable power tap was energized through a flat, white extension cord.  Relocatable power taps are not listed for use where they are energized through extension cords.  B.  Thermoset Department, Inspection Bench:  On, or about, July 28, 2021, a Lasko portable fan was in use that was not designed for use in an industrial location.  C.  Old Pill Room:  On, or about, August 27, 2021, a Torit Model 66 cabinet dust collector was provided for use with Machine 0155 to collect combustible dust generated when performing finishing operations on plastic parts.  A Dayton Model 5K683 C motor was provided inside of the dust collector enclosure.  The motor was not enclosed to prevent the entry of dust into the windings.    D.  Plastics Finishing, R.C. Finishing Bench:  On, or about, August 27, 2021, a Penguin and a CoolMaster portable fans were in use that were not designed for use in an industrial location.  E.  Plastics Finishing:  On, or about, August 27, 2021, a cabinet style dust collector was provided for use with the "Old Wheelabrator" abrasive tumbling machine to collect combustible dust generated in the abrasive blasting chamber.  A Duty Master motor was provided inside of the dust collector enclosure.  The motor was not enclosed to prevent the entry of dust into the windings.  F.  Injection Molding Department:  On, or about, September 2, 2021:  1.  A surface mount box designed for permanent mounting was used in an extension cord assembly at Machine 204, a BOY 22S injection molding machine.  The extension cord assembly was used to energize a PPE BTC15 auxiliary temperature control box.  2.  The power cord provided for the PPE BTC15 auxiliary temperature control box was marked as a 16/3 Type SO special purpose MSHA cord which was only rated for a load of 13 amperes.  The temperature control box was provided with 15 ampere receptacles and the Operation Manual stated that the unit contained overcurrent protection up to 21 amperes.  The power cord did not have sufficient ampacity for the equipment.  G.  Tool Room:  On, or about, September 2, 2021, Machine #1004, a Hardinge horizontal lathe, was energized through a double knockout pendant box that was designed for permanent mounting.    H.  Shipping and Receiving:  On, or about, September 20, 2021, a series of extension cords and relocatable power taps was used to energize computer equipment at the shipping and receiving workstation. Two relocatable power taps were energized in series and through an extension cord.  Relocatable power taps are not listed for use when energize through extension cords or in series.  I.  Powder Metal Department, Press #80, Dorst mechanical compacting press:  On, or about, September 29, 2021, a relocatable power tap was energized through a flat extension cord.  Relocatable power taps are not listed for use where they are energized through extension cords.
Recent events (3)
  • — P (S) $3000
  • — I (S) $3000
  • — Z (S) $4096

1910.303 G01 I A

Serious Gravity 1 1 instance 2 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $4,096 · Current $3,000 Reduced
29 CFR  1910.303(g)(1)(i)(A):  For electric equipment operating at 600 volts, nominal, or less to ground, and likely to require examination, adjustment, servicing, or maintenance while energized, the depth of the working space in the direction of access to live parts (as measured from the live parts where they were exposed or from the enclosure front or opening where they were enclosed) was less than indicated in Table S-1 of Subpart S of Part 1910:  Plastics Finishing:  On, or about, August 27, 2021, a Hobart forktruck charging unit and a bench mounted finishing machine were located in the working space in front of a General Electric circuit breaker panel labeled "Power" and a panelboard that energized presses in the area.
Recent events (2)
  • — I (S) $3000
  • — Z (S) $4096

1910.303 G01 I C

Serious Gravity 1 1 instance 3 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.303(g)(1)(i)(C):  For electric equipment operating at 600 volts, nominal, or less to ground, and likely to require examination, adjustment, servicing, or maintenance while energized, the width of work space was not clear and did not extend from the grade, floor, or platform to the height required by paragraph (g)(1)(vi) of 29 CFR 1910.303.  Other equipment associated with the electrical installation and located above or below the electric equipment extended more than 153 mm (6 inches) beyond the front of the electric equipment:  Furnace Room, Steam Treat Furnace:  On, or about, September 2, 2021, an ACME transformer was installed in the working space for the following 480 volt disconnect boxes:  Crane, Steam Boiler and Chromolox Boiler.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.303 G01 II

Serious Gravity 1 7 instances 2 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.303(g)(1)(ii):  The required working space about electric equipment rated 600 volts, nominal, or less to ground, was used for storage:    A.  Plastics Department, Negri Bossi H1600 Injection Molding Machine:  On, or about, July 28, 2021, a pallet was stored in the working space of the Eaton fused disconnect switch.   B.  Thermoset Department:  On, or about, July 28, 2021, an oil heater and a portable ladder were stored in the working space for a bank of electrical boxes and controls.  C.  Thermoset Department:  On, or about, July 28, 2021, a rolling tool box and cardboard boxes were stored in front of a distribution panel and two panelboards.    D.  MRB Room:  On, or about, August 6, 2021, a pallet was stored in front of a General Electric Load Center circuit breaker panel.  E.  Plastics Finishing:  On, or about, August 27, 2021, a ladder, bags of media, a hose reel and boxes were stored in front of disconnect and control boxes for the steam boiler and wheelabrator equipment.  F.  Plastic Molding Area:  On, or about, August 27, 2021, a pallet was stored in front of two General Electric circuit breaker panels.  G.  Injection Molding Department:  On, or about, September 2, 2021, shelving used to storage change-over components for the injection molding machine was located under a GE panelboard that contained circuit breakers for Press 209 and a grinder.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.303 G02 I

Serious Gravity 5 5 instances 7 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $6,827 · Current $3,000 Reduced
29 CFR  1910.303(g)(2)(i):  Except as elsewhere required or permitted by Subpart S of Part 1910, live parts of electric equipment operating  at 50 volts or more were not guarded against accidental contact by use of approved cabinets or other forms of approved enclosures or by any of the means identified in paragraphs (A), (B), (C), and (D) of 29 CFR 1910.303(g)(2)(i):  A.  Plastics Finishing:  On, or about, August 27, 2021, an open light socket was located in the blast chamber of Machine #358, a Wheelabrator tumble blast machine.  B.  Plastics Finshing:  On, or about, August 27, 2021, a General Electric circuit breaker panel labeled "Lights" did not present a dead front when the door was opened.  Circuit breakers/blanks were not provided to fill the spaces which exposed the live buss bars.    C.  Injection Molding Department, Machine #204:  On, or about, September 2, 2021, a Plastics Processing Equipment Model BTC 15 auxiliary temperature control unit had a gap between a control unit and the frame of the machine, explosive live electrical parts.  D.  Powder Metal Compacting:  On, or about, September 29, 2021, a cover was not provided over the cam box located on the back side of Machine #92, a Cincinnati mechanical powder compacting press.   E.  Powder Metal Compacting:  On, or about, September 29, 2021, a cover was not provided over the cam box located on the left side of Press #86, a Yoshizuka mechanical press.
Recent events (2)
  • — I (S) $3000
  • — Z (S) $6827

1910.304 G05

Serious Gravity 5 5 instances 9 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $6,827 · Current $3,000 Reduced
29 CFR  1910.304(g)(5):The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective:  A.  Plastics Department, Drill press workstation located next to machine #311:  On, or about, July 28, 2021, the following equipment did not have a continuous path to ground:  1.	Relocatable power tap energizing the Craftsman drill press and the overhead work light. 2.	The Craftsman drill press was missing the ground prong on the plug.   B.  Thermoset Department, Machine 307:  On, or about, July 28, 2021, the receptacle provided on the back of Machine #307 showed an open ground when tested.  The receptacle was used to energize a work light at Machine #308.  C.  Metal Department, Tumbling Area:  On, or about, August 6, 2021, a yellow Maxx Air fan was missing the ground pin on the plug connection.  D.  Maintenance Shop:  On, or about, September 2, 2021, the light fixture provided at the Boyar-Shultz surface grinder was energized through an extension cord that was missing the ground prong.
Recent events (2)
  • — I (S) $3000
  • — Z (S) $6827

1910.305 B02 I

Serious Gravity 5 11 instances 15 exposed
Issued
Jan 6, 2022
Abate by
Sep 30, 2022
Penalty
Initial $5,461 · Current $3,000 Reduced
29 CFR  1910.305(b)(2)(i):  Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose.  Each outlet box in completed installations did not have a cover, faceplate or fixture canopy:  A.  Water Recirculating Unit:  On, or about, August 6, 2021, a cover was missing on the General Electric transformer located under the ITE disconnect labelled "pump".  B.  Plastics Finishing:  On, or about, August 27, 2021, a cover was missing on the junction box mounted on the side of the Chromalox boiler.  C.  Plastic Molding, Machine #331, Reed:  On, or about, August 27, 2021, a cover was missing on the hydraulic interlock switch junction box.    D.  Plastic Molding, White HPM:  On, or about, August 27, 2021, covers were missing for the barrel position cam switches and on a valve.  E.  Plastic Molding:  On, or about, August 27, 2021, a wall mounted junction box that was located above the opening that communicated with the Old Pill Room was not provided with a cover.  F.  Injection Molding Department, Machine #207, Reed Injection Molding Machine:  On, or about, September 2, 2021, a cover was not provided on green junction box for press wiring and the back of the control box for the machine.  G.  Injection Molding Department, Machine 216, a HPM Injection Molding Machine:  On, or about, September 2, 2021, a cover was not provided on a pressure switch used for lubricants.    H.  Injection Molding Department, Machine #265, a HPM Horizontal Injection molding machine:  On, or about, September 2, 2021, a cover was not provided on the back of the control box and on a solenoid valve.  I.  Tool Room:  On, or about, September 2, 2021, an elbow fitting provided on the back of Machine #0174, a REM horizontal lathe, was not provided with a cover.    J.  Shipping and Receiving:  On, or about, September 20, 2021, a cover was not provided on the quad receptacle box that was used to energize the shrink wrap machine.    K.  Power Metal Compacting:  On, or about, October 6, 2021, a cover was not provided on a junction box located on the right side of Press #39, an Alpha hydraulic compacting press.
Recent events (4)
  • — P (S) $3000
  • — P (S) $3000
  • — I (S) $3000

1910.305 G01 IV A

Serious Gravity 1 17 instances 26 exposed
Issued
Jan 6, 2022
Abate by
Sep 30, 2022
Penalty
Initial $4,096 · Current $2,500 Reduced
29 CFR  1910.305(g)(1)(iv)(A):  Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure:  A.  Thermoset Department, Machine 306:  On, or about, July 28, 2021, an orange extension cord was used to energize a scale.  B.  Thermoset Department, Machine 306:  On, or about, July 28, 2021, a flat, white extension cord was used to energize a relocatable power tap.  C.  Thermoset Department, Machine 308:  On, or about, July 28, 2021, a black extension cord was used to energize a scale.  The extension cord was energized through a receptacle mounted on the back of Machine 307.  D.  Thermoset Department, Machine 308:  On, or about, July 28, 2021, a green extension cord was used to energize a work light.  The extension cord was energized through a receptacle mounted on the back of Machine 307.  E.  Thermoset Department, Machine 309:  On, or about, July 28, 2021, a black extension cord was used to energize a work light.  F.  Thermoset Department, Machine 310:  On, or about, July 28, 2021, a black extension cord was used to energize a scale.  G.  Thermoset Department, Inspection Bench:  On, or about, July 28, 2021, a black extension cord was used to energize an overhead light fixture.  H.  Old Pill Room:  On, or about, July 28, 2021, a green extension cord was used to energize a light fixture that was used at Machine 0155, a trimming station.  I.  Plastics Maintenance Area:  On, or about, August 6, 2021, a brown two wire cord was wired into a switch box to energize the overhead work light.  J.  Plastics Finishing, R.C. Finishing Bench:  On, or about, August 27, 2021, a series of extension cords and splitters were used to provide power to lights, fans and other equipment at a group of finishing workstations.    K.  Plastic Molding Area:  On, or about, August 27, 2021, a flat extension cord was used to energize a scale at the shipping/counting work station.  L.  Plastic Molding:  On, or about, August 27, 2021, a flat extension cord was used to energize a hanging light fixture at Machine #331, a Reed injection molding machine.  M.  Maintenance Shop:  On, or about, September 2, 2021, the light fixture provided on the Boyar-Shultz surface grinder was energized through an extension cord.  N.  Shipping and Receiving:  On, or about, September 20, 2021, a series of extension cords and relocatable power taps was used to energize computer equipment at the shipping and receiving workstation.   O.  Shipping and Receiving:  A flat extension cord was used to energize the shrink wrap machine.  P.  Powder Metal Department, Press #80, Dorst mechanical compacting press:  On, or about, September 29, 2021, a flat extension cord was used to energize a relocatable power tap that was used to energize an overhead work light.  Q.   Cafeteria:  On, or about, October 27, 2021, the Kenmore refrigerator was energized through an extension cord.
Recent events (4)
  • — P (S) $2500
  • — P (S) $2500
  • — I (S) $2500

1910.305 G01 IV C

Serious Gravity 1 1 instance 2 exposed
Issued
Jan 6, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.305(g)(1)(iv)(C):  Flexible cords and cables were used where run through doorways, windows, or similar openings:  Metal Department, Tumbling:  On, or about, August 6, 2021, a black and red extension cord was used to energize a pH sensor.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.305 G02 III

Serious Gravity 1 5 instances 9 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $4,096 · Current $2,000 Reduced
29 CFR  1910.305(g)(2)(iii):  Flexible cords were not connected to devices and fittings so that tension would not be transmitted to joints or terminal screws:  A.  Plastics Department, Trimming Station #0287:  On, or about, July 28, 2021, the power cord was pulled from the motor connection, exposing the inner wires.  B.  Old Pill Room:  On, or about, July 28, 2021, the power cord provided on a Dayton pedestal fan appeared to have been replaced with an orange extension cord that was pinched between a cover and the motor housing.  C.  Metal Department, Tumbling Area:  On, or about, August 6, 2021, the power cord for a wall mounted pH sensor was damaged at the male plug connection, reducing the level of strain relief on the terminal connections.  D.  Furnace Room, Graphite Dip Tank:  On, or about, September 2, 2021. The power cord provided for the hoist pendant control was pulled from the compression fitting at the hoist housing.    E.  Shipping and Receiving:  On, or about, September 20, 2021, the power cord for Machine #0237, a demagnetizer, was pulled from the male plug cable clamp, exposing the inner wires.
Recent events (2)
  • — I (S) $2000
  • — Z (S) $4096

1910.335 A01 I

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $6,827 · Current $3,000 Reduced
29 CFR  1910.335(a)(1)(i):  Employees working in areas where there were potential electrical hazards were not provided with electrical protective equipment that was appropriate for the specific parts of the body that needed to be protected and for the work being performed:  Plant:  On, or about, July 14, 2021, personal protective equipment such as, but not limited to, voltage rated gloves, fire resistive clothing, face shields, balaclavas, hard hats and hearing protection were not provided to employees who performed live electrical work, including trouble-shooting, or who verified that electrical equipment was properly de-energized.
Recent events (2)
  • — I (S) $3000
  • — Z (S) $6827

1910.335 A01 II

Serious Gravity 1 1 instance 1 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.335(a)(1)(ii):Protective equipment was not maintained in a safe, reliable condition and/or was not periodically inspected or tested:  Plant:  On, or about, July 14, 2021, a pair of Salisbury Class 0 voltage rated gloves had not been inspected since September 2012.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.1200 F06 II

Serious Gravity 1 3 instances 5 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $4,096 · Current $1,500 Reduced
29 CFR  1910.1200(f)(6)(ii):  Except as provided in 29 CFR 1910.1200(f)(7) and 29 CFR 1910.1200(f)(8), the employer did not ensure that each container of hazardous chemicals in the workplace was labeled, tagged or marked with the product identifier and words, pictures, symbols, or combination thereof, which provide at least general information regarding the hazards of the chemicals and which, in conjunction with the other information immediately available to employees under the hazard communication program, would provide employees with the specific information regarding the physical and health hazards of the hazardous chemical:  A.  Furnace Room:  On, or about, September 2, 2021, the dip tank that contained a solution of Graphokote 664 was not provided with a label, sign or placard to indicate the identity of the contents and the appropriate hazard warning.    B.  Oil Room:  On, or about, September 2, 2021, there were several unlabeled pails and barrels that appeared to contain used oil and mineral spirits.  C.  Machining Department:  On, or about, September 20, 2021, the Safety Kleen Model 81 parts washer that contained Safety-Kleen Premium Solvent, a Category 4 flammable liquid with a flashpoint of 148 degrees, F.  The tank was not provided with a label or placard to identify the contents of the tank or the appropriate hazard warning.
Recent events (2)
  • — I (S) $1500
  • — Z (S) $4096

1910.25 B02

Other-than-serious 1 instance 40 exposed
Issued
Jan 6, 2022
Abate by
Oct 21, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.25(b)(2):  The employer did not ensure that vertical clearance above any stair tread to any overhead obstruction is at least 6 feet, 8 inches (203 cm), as measured from the leading edge of the tread:  Plastic Department:  On, or about, October 27, 2021, the fixed stairs leading up to the cafeteria were not provided with sufficient head room in that a horizontal beam/wall provided for the structure for the interior office was located less than six foot, eight inches above the stair risers.
Recent events (3)
  • — P (O) $0
  • — I (O) $0
  • — Z (O) $0

1910.29 F04

Other-than-serious 1 instance 2 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.29(f)(4):  The employer did not ensure that no opening in a stair rail system exceeds 19 inches (48 cm) at its least dimension:  Furnace Room:  On, or about, September 2, 2021, a set of fixed stairs located at the Steam Treat Furnace was not provided with a midrail in the guardrail system.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.94 A07

Other-than-serious 1 instance 10 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.94(a)(7):  Abrasive blasting dust(s) were permitted to accumulate on the floor or on ledges outside of the abrasive blasting enclosure(s):  Plastics Finishing:  On, or about, August 27, 2021, blast media was present on the floor around the base of the dust collector for Wheelabrator #2 and in the walkway to access the office/storage room.  The media created a slip hazard.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.242 B

Other-than-serious 1 instance 2 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.242(b):  Compressed air used for cleaning purposes was not reduced to less than 30 p.s.i.:  Machining Department:  On, or about, September 20, 2021, a compressed air nozzle provided at Machine #308, a Brother TC-324 CNC milling machine, was measured to be 90 p.s.i., dead-ended.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.303 F02

Other-than-serious 3 instances 4 exposed
Issued
Jan 6, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.303(f)(2):Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident:  A.  Plastics Department, Work Area of Negri Bossi H1600 Horizontal Injection Molding Machine:  On, or about, July 28, 2021, the electrical disconnect for the machine was not labelled to indicate its purpose.  B.  Metal Department, Tumbling Area:  On, or about, August 6, 2021, two ITE disconnect boxes provided for vibratory bowls were not labelled.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.305 B01 I

Other-than-serious 4 instances 10 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.305(b)(1)(i):  Conductors entering cutout boxes, cabinets, or fittings were not protected from abrasions:  A.  Plastics Department, Drill press work station near Machine #311:  On, or about, July 28, 2021, the power cord connection to the motor on the Rockwell drill press (right) had an unsecured fitting.  The inner conductors were exposed to the edge of the motor junction box.  B.  Plastics Maintenance Area:  On, or about, August 6, 2021, armored cable that connected wiring for the overhead light fixture to a box containing a snap switch was not provided with a proper connector, exposing the inner conductors to the sharp edge of the box.  C.  Plastic Molding, Tan HPM:  On, or about, August 27, 2021, a fitting for the box for the sliding door was unsecured, exposing the inner conductors.  D.  Powder Metal Department:  On, or about, September 29, 2021, an electrical box provided on the back of Press #89, a Dorst mechanical compacting press had an unsecured fitting.  The inner conductors were exposed to the sharp edges of the box.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.305 J02 I

Other-than-serious 1 instance 1 exposed
Issued
Jan 6, 2022
Abate by
Feb 24, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.305(j)(2)(i):  Receptacles may not be installed so as to require an energized attachment plug as its source of supply:  Old Pill Room:  On, or about, July 28, 2021, a quad receptacle box mounted on the grinding work bench was energized through a cord and plug connection.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.303 B08 I

Other-than-serious 1 instance 2 exposed
Issued
Jan 6, 2022
Penalty
Initial $0 · Current $0
29 CFR  1910.303(b)(8)(i):  Electrical equipment was not firmly secured to the surface on which it was mounted:   Plastics Maintenance Area:  On, or about, August 6, 2021, a knockout box that contained a duplex receptacle was not properly secured to the wall.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1904.41 A02

Other-than-serious 1 instance 65 exposed
Issued
Aug 30, 2021
Penalty
Initial $0 · Current $0
29 CFR  1904.41(a)(2):  The establishment had 20 or more but fewer than 250 employees at any time during the previous calendar year, and the establishment was classified as an industry listed in appendix A to subpart E of this part, but did not electronically submit information from OSHA 300A Summary of Work-Related Injuries and Illnesses to OSHA or OSHA's designee.  The employer did not submit the information once a year, no later than the date listed in paragraph (c) of this section of the year after the calendar year covered by the form:  (a) PM Engineered Solutions, Inc., 140 Commercial Street, Watertown, Connecticut:  On or about July 15, 2021, and times prior thereto, the employer failed to electronically submit information from their OSHA Form 300A Summary of Work-Related Injuries and Illnesses for 2020 or equivalent on or before March 2, 2021.  The establishment employed 65 employees and was classified under NAICS 332117 during calendar year 2020.
Recent events (1)
  • — Z (O) $0

View PM Engineered Solutions INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345421648.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.