Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: STS PRECISION DRYWALL, INC.

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of STS PRECISION DRYWALL, INC. in MARINE CORP AIR STATION MIRIMAR, SAN DIEGO, CA 92145 (NAICS 238310). OSHA activity number 345513949.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch STS Precision Drywall, INC. — free Get an email when a new federal OSHA severe-injury report for STS Precision Drywall, INC. is published. One employer, no account, unsubscribe in one click.
Site address
MARINE CORP AIR STATION MIRIMAR
City
SAN DIEGO
State
CA
ZIP
92145
Mailing
19775 MARIPOSA AVENUE, RIVERSIDE, CA 92508
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238310
Employees
4
Ownership type
A

4 citations on file for this inspection.

1910.134 C01

Serious Gravity 1 1 instance 3 exposed
Issued
Sep 30, 2021
Abate by
Nov 18, 2021
Penalty
Initial $1,492 · Current $1,044 Reduced
29 CFR  1910.134(c)(1):  A written respiratory protection program that included the provisions in 29 CFR 1910.134(c)(1)(i) - (ix) with worksite specific procedures was not established and implemented for required respirator use: (Construction Reference 1926.103)    MCAS BEQ 5697/5698:  Employees conducted drywall operations which generated dusts and were required to wear a 3M N95 respirator.   The employer did not have a written respiratory protection program implemented for required respirator use at the project site. The employees were exposed to hazards that could exacerbate underlying medical conditions.
Recent events (2)
  • — I (S) $1044.4
  • — Z (S) $1492

1910.134 E01

Serious Gravity 1 1 instance 3 exposed
Issued
Sep 30, 2021
Abate by
Nov 18, 2021
Penalty
Initial $0 · Current $0
29 CFR  1910.134(e)(1):The employer did not provide a medical evaluation to determine the employee's ability to use a respirator, before the employee was fit tested or required to use the respirator in the workplace: (Construction Reference 1926.103)  MCAS BEQ 5697/5698:  Employees conducted drywall operations which generated dusts and were required to wear a 3M N95 respirator.   The employer did not provide  medical evaluations prior to initial respirator use at the project site.  The employees were exposed to hazards that could exacerbate underlying medical conditions.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.134 F02

Serious Gravity 1 1 instance 3 exposed
Issued
Sep 30, 2021
Abate by
Nov 18, 2021
Penalty
Initial $0 · Current $0
29 CFR  1910.134(f)(2): The employer did not ensure that an employee using a tight-fitting facepiece respirator was fit tested prior to initial use of the respirator: (Construction Reference 1926.103)   MCAS BEQ 5697/5698:  Employees conducted drywall operations which generated dusts and were required to wear a 3M N95 respirator.   The employer did not provide a fit test to employees required to wear respirators prior to initial use at the project site.  The employees were exposed to hazards that could exacerbate underlying medical conditions.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.134 K01

Serious Gravity 1 1 instance 3 exposed
Issued
Sep 30, 2021
Abate by
Nov 18, 2021
Penalty
Initial $0 · Current $0
29 CFR  1910.134(k)(1):  The employer did not provide effective training to employees who were required to use respirators:  MCAS BEQ 5697/5698:  Employees conducted drywall operations which generated dusts and were required to wear a 3M N95 respirator.   The employer did not provide effective respiratory protection training to employees prior to initial use at the project site.  The employees were exposed to hazards that could exacerbate underlying medical conditions.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View STS Precision Drywall, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345513949.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.