OSHA Inspection: ABEL CONSTRUCTION COMPANY INCORPORATED

Federal Agency inspection · Safety discipline

On , OSHA opened a federal Agency safety inspection of ABEL CONSTRUCTION COMPANY INCORPORATED in 520 VALENTINE LANE, BELLEFONTE, PA 16823 (NAICS 237310). OSHA activity number 345602379.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Abel Construction Company Incorporated — free Get an email when a new federal OSHA severe-injury report for Abel Construction Company Incorporated is published. One employer, no account, unsubscribe in one click.
Site address
520 VALENTINE LANE
City
BELLEFONTE
State
PA
ZIP
16823
Mailing
3925 COLUMBIA AVENUE P.O. BOX 476, MOUNTVILLE, PA 17554
Inspection type
Federal Agency (M)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237310
Employees
120
Ownership type
A

4 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 1 instance 5 exposed
Issued
Apr 25, 2022
Abate by
May 12, 2022
Penalty
Initial $14,502 · Current $14,502
OSH ACT of 1970 Section (5)(a)(1)  The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees  (a) 520 Valentine Lane Bellefonte PA , on or about October 25, 2021, construction activities were performed without a comprehensive analysis of the work area to ensure all unanticipated hazards had been effectively addressed.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $14502
  • — Z (S) $14502

1926.600 A06

Deleted Serious Gravity 10 1 instance 4 exposed
Issued
Apr 25, 2022
Abate by
May 12, 2022
Penalty
Initial $0 · Current $0
29 CFR  1926.600(a)(6): All equipment covered by this subpart did not comply with the following requirements when working or being moved in the vicinity of power lines or energized transmitters, except where electrical distribution and transmission lines have been deenergized and visibly grounded at point of work or where insulating barriers, not a part of or an attachment to the equipment or machinery, have been erected to prevent physical contact with the lines:   (a) 520 Valentine Lane Bellefonte PA New Residential Homes- Employees were excavating a trench for utilities under an energized power lines that was 26000 volts phase to ground that was not deenergized, grounded or had an insulating barrier to prevent physical contact, exposing employees to electrical hazards, on or about October 25, 2021.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records. -
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.416 A03

Deleted Serious Gravity 10 1 instance 5 exposed
Issued
Apr 25, 2022
Abate by
May 12, 2022
Penalty
Initial $0 · Current $0
29 CFR 1926.416(a)(3): Before work began, the employer did not ascertain by inquiry, direct observation, or by instruments, whether any part of an energized electric power circuit, exposed or concealed, was so located that the performance of the work could bring any person, tool, or machine into physical or electrical contact with the electric power circuit:  (a) 520 Valentine Lane Bellefonte PA New Residential Homes- The employer did not ensure that the work was conducted in such a way that the Case 300-D excavator could not come in contact with the overhead power line, on or about October 25, 2021.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.600 A06 IV

Deleted Serious Gravity 10 1 instance 4 exposed
Issued
Apr 25, 2022
Abate by
Jun 10, 2022
Penalty
Initial $14,502 · Current $0 Reduced
29 CFR  1926.600(a)(6)(iv): A person was not designated to observe clearance of the equipment and give timely warning for all operations where it is difficult for the operator to maintain the desired clearance by visual means:  (a) 520 Valentine Lane Bellefonte PA New Residential Homes- Employees were excavating a trench under energized power lines and did not designated an employee to observe clearance  from the power lines to the Case 300-D excavator, exposing employees to electrical hazards, on or about October 25, 2021.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $14502

View Abel Construction Company Incorporated's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345602379.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.