NORFOLK, VA —
OSHA Inspection: QED SYSTEMS INCORPORATED
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of QED SYSTEMS INCORPORATED in 3487 INVENTORS ROAD, NORFOLK, VA 23502 (NAICS 336611). OSHA activity number 345609887.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- QED SYSTEMS INCORPORATED
- Site address
- 3487 INVENTORS ROAD
- City
- NORFOLK
- State
- VA
- ZIP
- 23502
- Mailing
- 4646 NORTH WITCHDUCK ROAD, VIRGINIA BEACH, VA 23455
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 336611
- Employees
- 43
- Ownership type
- A
Citations
6 citations on file for this inspection.
1910.212 A03 II
- Issued
- Jan 10, 2022
- Abate by
- Feb 4, 2022
- Penalty
- Initial $6,583 · Current $3,686 Reduced
General-duty citation text
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): a). Building 5700: On or about 10/25/2021, the point of operation on the AFM Press Brake Model 5-55 was not guarded to prevent an employee from accessing the danger zone during cycling, as a result, exposed employee to a possible crushing and/or amputation hazard. Note: Special hand tools for placing and removing material shall be such as to permit easy handling of material without the operator placing a hand in the danger zone. Such tools shall not be in lieu of other guarding required by this section, but can only be used to supplement protection provided. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $3686.2
- — Z (S) $6583
1910.242 B
- Issued
- Jan 10, 2022
- Abate by
- Feb 4, 2022
- Penalty
- Initial $3,949 · Current $3,686 Reduced
General-duty citation text
29 CFR 1910.242(b): Compressed air used for cleaning purposes was not reduced to less than 30 p.s.i: a) Building 9A Weld Shop: On or about 10/27/2021, the compressed air nozzle, used by employees for cleaning purposes, was being used at 100 p.s.i. in lieu of using an approved nozzle or an inline regulator that would reduce the air pressure to less than 30 p.s.i Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $3686.2
- — Z (S) $3949
1910.304 B03 II A
- Issued
- Jan 10, 2022
- Abate by
- Feb 4, 2022
- Penalty
- Initial $5,266 · Current $3,686 Reduced
General-duty citation text
29 CFR 1910.304(b)(3)(ii)(A): All 125-volt, single-phase, 15, 20 and 30-ampere receptacle outlets that are not part of the permanent wiring of the building or structure and that are in use by personnel did not have ground-fault circuit-interrupter protection for personnel: a) Building 9A, Duck work section: On or about 10/26/2021, an employee used multiple extension cords plugged together to supply power to a portable Porter Cable jigsaw to cut sheet metal without ground fault circuit interrupter protection, as a result, exposed employee to a possible shock hazard. Note: A cord connector on an extension cord set is considered to be a receptacle outlet if the cord set is used for temporary electric power. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $3686.2
- — Z (S) $5266
1910.334 A02 II
- Issued
- Jan 10, 2022
- Abate by
- Feb 4, 2022
- Penalty
- Initial $5,266 · Current $3,686 Reduced
General-duty citation text
29 CFR 1910.334(a)(2)(ii): There was a defect or evidence of damage that could have exposed an employee to injury and the defective or damaged item was not removed from service and an employee was using it before repairs and tests necessary to render the equipment safe were made: a) Building 9A Weld shop: On or about 10/27/2021, the flexible cord on the Patton Air Circulator pedestal fan was not removed from service in that the male attachment plug was missing the ground prong, thereby exposed employees to a possible electrical shock hazard. Note: If there is a defect or evidence of damage that might expose an employee to injury, the defective or damaged item shall be removed from service, and no employee may use it until repairs and tests necessary to render the equipment safe have been made. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $3686.2
- — Z (S) $5266
1910.305 B01 II
- Issued
- Jan 10, 2022
- Abate by
- Feb 4, 2022
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.305(b)(1)(ii): Unused openings in boxes, cabinets, or fittings were not effectively closed: a) Building 9A Production Section: On or about 10/27/2021, breaker panels L2-B and L1 were not effectively closed in that knockouts were removed from the top surface, thereby exposed the internal wires in the breaker cabinet. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1915.89 Q01
- Issued
- Jan 10, 2022
- Abate by
- Feb 14, 2022
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1915.89(q)(1): The employer did not conduct an audit of the lockout/tags-plus program and procedures currently in use at least annually to ensure that the procedures and the requirements of this section are being followed and to correct any deficiencies: a) QED Systems Inc: On or about 10/27/2021, the employer failed to conduct an annual audit of the lockout/tagout-plus program as it pertain to vessels and shipyard related employment. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at QED Systems Incorporated
View QED Systems Incorporated's full OSHA safety record →
More inspections in this industry (NAICS 336611)
More inspections in VA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345609887.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.