OSHA Inspection: COMPOSITE MODULES, INC.

Federal Agency inspection · Safety discipline

On , OSHA opened a federal Agency safety inspection of COMPOSITE MODULES, INC. in 61 UNION STREET, ATTLEBORO, MA 02703 (NAICS 335312). OSHA activity number 345635924.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Composite Modules, INC. — free Get an email when a new federal OSHA severe-injury report for Composite Modules, INC. is published. One employer, no account, unsubscribe in one click.
Site address
61 UNION STREET
City
ATTLEBORO
State
MA
ZIP
02703
Mailing
61 UNION STREET, ATTLEBORO, MA 02703
Inspection type
Federal Agency (M)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
335312
Employees
38
Ownership type
A

6 citations on file for this inspection.

1910.106 E03 IV A

Serious Gravity 5 1 instance 25 exposed
Issued
May 6, 2022
Abate by
Jun 28, 2022
Penalty
Initial $7,252 · Current $5,000 Reduced
29 CFR  1910.106(e)(3)(iv)(a):  Emergency drainage systems were not provided to direct flammable liquid leakage and fire protection water to a safe location:  Third Floor Ceramic Mixing Area:  Drainage systems were not provided to protect against spills and leaks from flammable liquids such as Toluene and the fire sprinkler system to a safe location.
Recent events (2)
  • — I (S) $5000
  • — Z (S) $7252

1910.106 E03 V A

Serious Gravity 5 1 instance 3 exposed
Issued
May 6, 2022
Abate by
Jun 28, 2022
Penalty
Initial $7,252 · Current $5,000 Reduced
29 CFR  1910.106(e)(3)(v)(a):Areas as defined in paragraph (e)(3)(i) of this section using Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 �F (37.8 �C), were not ventilated at a rate of not less than 1 cubic foot per minute per square foot of solid floor area. This shall be accomplished by natural or mechanical ventilation with discharge or exhaust to a safe location outside of the building. Provision shall be made for introduction of makeup air in such a manner as not to short circuit the ventilation. Ventilation was not arranged to include all floor areas or pits where flammable vapors may collect:  Third Floor Ceramic Mixing Area:  The mixing room was not equipped with adequate mechanical or natural ventilation.
Recent events (2)
  • — I (S) $5000
  • — Z (S) $7252

1910.106 E06 I

Serious Gravity 5 1 instance 1 exposed
Issued
May 6, 2022
Abate by
Jun 28, 2022
Penalty
Initial $7,252 · Current $5,000 Reduced
29 CFR  1910.106(e)(6)(i):  Adequate precautions were not taken to prevent the ignition of flammable vapors:  Third Floor Ceramic Mixing Area:  Precautions that included but not limited to signage indicating "No Open Flames"  or  "No Smoking", ensuring electrical outlets were properly covered, or ensuring equipment was intrinsically safe, among others were not taken to prevent ignition of flammable vapors.
Recent events (2)
  • — I (S) $5000
  • — Z (S) $7252

1910.106 E07 I A

Serious Gravity 10 1 instance 3 exposed
Issued
May 6, 2022
Abate by
Jun 28, 2022
Penalty
Initial $10,151 · Current $5,000 Reduced
29 CFR  1910.106(e)(7)(i)(a):All electrical wiring and equipment was not installed according to the requirements of Subpart S of this part:  Third Floor Ceramic Mixing Area:  The electric outlets in the area were not adequate to meet the requirements established in Subpart S.
Recent events (2)
  • — I (S) $5000
  • — Z (S) $10151

1910.106 E09 III

Serious Gravity 5 1 instance 3 exposed
Issued
May 6, 2022
Abate by
Jun 28, 2022
Penalty
Initial $7,252 · Current $5,000 Reduced
29 CFR  1910.106(e)(9)(iii):Combustible waste material and residues in a building or unit operating area were not kept to a minimum, stored in covered metal receptacles and disposed of daily:  Third Floor Ceramic Mixing Area:  Rags used for cleaning with Toluene were kept in an open container and not disposed of daily.
Recent events (2)
  • — I (S) $5000
  • — Z (S) $7252

1910.212 A01

Serious Gravity 5 1 instance 3 exposed
Issued
May 6, 2022
Penalty
Initial $8,702 · Current $5,000 Reduced
29 CFR  1910.212(a)(1):One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks:  (a) Stamping Area:  A Perkins Machine Company Model 32-S (Serial 43975) thirty-two (32) ton press was not guarded to protect employees from struck-by hazards at the point of operation.
Recent events (2)
  • — I (S) $5000
  • — Z (S) $8702

View Composite Modules, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 345635924.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.