OSHA Inspection: GEORGIA BUILDERS LLC

Special Programs inspection · Safety discipline

On , OSHA opened a special Programs safety inspection of GEORGIA BUILDERS LLC in 4912 WISCONSIN AVENUE, NW, WASHINGTON, DC 20016 (NAICS 236116). OSHA activity number 345760748.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Georgia Builders LLC — free Get an email when a new federal OSHA severe-injury report for Georgia Builders LLC is published. One employer, no account, unsubscribe in one click.
Site address
4912 WISCONSIN AVENUE, NW
City
WASHINGTON
State
DC
ZIP
20016
Mailing
4132 GEORGIA AVENUE NW, WASHINGTON, DC 20011
Inspection type
Special Programs (K)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236116
Employees
1
Ownership type
A

9 citations on file for this inspection.

1926.56 A

Serious Gravity 5 1 instance 5 exposed
Issued
Aug 1, 2022
Abate by
Aug 5, 2022
Penalty
Initial $2,486 · Current $2,486
29 CFR  1926.56(a): While work was in progress, construction areas, ramps, runways, corridors, offices, shops or storage areas were not lighted to the minimum illumination intensities as listed in Table D-3 of 29 CFR 1926.56:  a) Stairway Between First and Second - Employees were using stairway that was not provided with lighting, on or about 02/02/2022.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (1)
  • — Z (S) $2486

1926.403 D01

Serious Gravity 1 1 instance 5 exposed
Issued
Aug 1, 2022
Abate by
Aug 5, 2022
Penalty
Initial $1,865 · Current $1,865
29 CFR  1926.403(d)(1): Electric equipment was not firmly secured to the surface on which it was mounted:  a) Basement Level - Employees were using a 4 way temporary electrical outlet to supply power to a DeWalt portable electric air compressor, where the outlet was not secured and hanging by the BX cable, on or about 02/02/2022.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (1)
  • — Z (S) $1865

1926.403 H

Serious Gravity 1 1 instance 5 exposed
Issued
Aug 1, 2022
Abate by
Aug 5, 2022
Penalty
Initial $0 · Current $0
29 CFR  1926.403(h): Each service, feeder, and branch circuit was not legibly marked at its disconnecting means or overcurrent device to indicate its purpose, nor located and arranged so that the purpose was evident:  a) Basement Level -  Circuit breakers in a temporary service panel used to power portable tools were not labeled, on or about 02/02/2022.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (1)
  • — Z (S) $0

1926.404 B01 I

Serious Gravity 1 1 instance 5 exposed
Issued
Aug 1, 2022
Abate by
Aug 5, 2022
Penalty
Initial $0 · Current $0
29 CFR  1926.404(b)(1)(i):Employer did not use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section, or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites:  a) Jobsite - Employees were using temporary electric power to supply portable electric tools and ground fault circuit interrupter protection was not provided,  on or about 02/02/2022.   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (1)
  • — Z (S) $0

1926.405 B02

Serious Gravity 1 1 instance 5 exposed
Issued
Aug 1, 2022
Abate by
Aug 5, 2022
Penalty
Initial $0 · Current $0
29 CFR  1926.405(b)(2):In an energized installation, each outlet box did not have a cover, faceplate, or fixture canopy:  a) Basement Lower Level - Employees were using a temporary 4-way electric outlet to provide power to a DeWalt portable electric compressor,  and the cover was missing from the outlet, exposing live electrical parts,  on or about 02/02/2022.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (1)
  • — Z (S) $0

1926.701 B

Serious Gravity 5 1 instance 5 exposed
Issued
Aug 1, 2022
Penalty
Initial $2,486 · Current $2,486
29 CFR  1926.701(b):All protruding reinforcing steel, onto and/or into which employees could fall, was not guarded to eliminate the hazard of impalement:  (a) Rear Entrance - A piece of rebar that was 12 inches in height and 6 inches from the side of a stairway was not covered to prevent an impalement hazard, on or about 02/02/2022.  NO ABATEMENT DOCUMENTATION REQUIRED
Recent events (1)
  • — Z (S) $2486

1926.1052 B02

Serious Gravity 5 1 instance 5 exposed
Issued
Aug 1, 2022
Abate by
Aug 5, 2022
Penalty
Initial $2,486 · Current $2,486
29 CFR  1926.1052(b)(2): Foot traffic was not prohibited on skeleton metal stairs where permanent treads and/or landings were to be installed at a later date and the stairs were not fitted with secured temporary treads and/or landings long enough to cover the entire tread or landing area:  a) Stairway Between First and Second Floors - Employees were using a skeleton steel stairway to gain access between floors and the pans were not filled-in , on or about 02/02/2022.   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (1)
  • — Z (S) $2486

1926.1052 C01 I

Serious Gravity 1 1 instance 5 exposed
Issued
Aug 1, 2022
Penalty
Initial $0 · Current $0
29 CFR  1926.1052(c)(1)(i): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with at least one handrail:  a) Rear Entrance - Stairway to gain access to the building was 30 inches in height with a total of 4 risers and was missing a handrail, on or about 02/02/2022.  NO ABATEMENT DOCUMENTATION REQUIRED
Recent events (1)
  • — Z (S) $0

1926.501 B13

Serious Gravity 10 1 instance 2 exposed
Issued
Aug 1, 2022
Abate by
Aug 5, 2022
Penalty
Initial $4,351 · Current $4,351
29 CFR  1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):  a) Second Floor South Side - Employees were on an exterior top plate during a framing operation and exposed to a  fall hazard of 20-feet, on or about 02/02/2022.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification.  This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $4351

View Georgia Builders LLC's full OSHA safety record →