HADLEY, PA —
OSHA Inspection: DEIST, LLC.
Referral inspection · Health discipline
At a glance
On , OSHA opened a referral health inspection of DEIST, LLC. in 3547 PERRY HIGHWAY, HADLEY, PA 16130 (NAICS 332439). OSHA activity number 345773972.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- DEIST, LLC.
- Site address
- 3547 PERRY HIGHWAY
- City
- HADLEY
- State
- PA
- ZIP
- 16130
- Mailing
- 3550 PERRY HIGHWAY, HADLEY, PA 16130
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332439
- Employees
- 85
- Ownership type
- A
Citations
5 citations on file for this inspection.
1910.37 E
- Issued
- Aug 5, 2022
- Abate by
- Aug 17, 2022
- Penalty
- Initial $6,657 · Current $1,000 Reduced
General-duty citation text
29 CFR 1910.37(e):Employer did not install and maintain an operable employee alarm system that had a distinctive signal to warn employees of fire or other emergencies: a) Deist, LLC dba Bucks Manufacturing, various areas throughout the facility, on or about February 9th, 2022 and times prior thereto: The employer did not have an employee alarm system that was functional in the event of an emergency. b) Deist, LLC dba Bucks Manufacturing, various areas throughout the facility, on or about February 9th, 2022 and times prior thereto: The employee alarm system was not distinctively recognizable in that, a "PA system" was utilized during a fire incident on January 13th, 2022. The "PA system" did not function appropriately during the incident to alert employees of the fire. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1000
- — Z (S) $6657
1910.107 B05 IV
- Issued
- Aug 5, 2022
- Abate by
- Mar 17, 2023
- Penalty
- Initial $6,657 · Current $5,000 Reduced
General-duty citation text
29 CFR 1910.107(b)(5)(iv):Space within the spray booth on the downstream and upstream sides of filters were not protected with approved automatic sprinklers: a) Deist, LLC dba Bucks Manufacturing, North and South paint booth areas, on or about February 9th, 2022 and times prior thereto: Automatic sprinklers or other approved extinguishing equipment had not been installed on the downstream and upstream sides of filters in the North and South paint booths. Throughout each work shift, employees were potentially exposed to a fire hazard at the employer's paint booths where flammable materials were sprayed. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (3)
- — P (S) $5000
- — I (S) $5000
- — Z (S) $6657
1910.107 C09 I
- Issued
- Aug 5, 2022
- Abate by
- Aug 31, 2022
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.107(c)(9)(i): All metal parts of spray booths, exhaust ducts, and piping systems conveying flammable liquids or liquids with a flashpoint greater than 199.4 �F (93 �C) or aerated solids were not properly electrically grounded in an effective and permanent manner: a.) Deist, LLC dba Bucks Manufacturing, North and South paint booth areas, on or about February 9th, 2022 and times prior thereto: Employees perform spray painting/coating operations in the North and South paint booths with flammable liquids. All metal parts of the north and south paint booths including, but not limited to, spray guns, piping systems, drums, and paint kitchen were not electrically grounded in effective or permanent manner. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.107 B09
- Issued
- Aug 5, 2022
- Abate by
- Aug 17, 2022
- Penalty
- Initial $6,657 · Current $4,000 Reduced
General-duty citation text
29 CFR 1910.107(b)(9): A clear space of not less than 3 feet on all sides was not kept free from storage or combustible construction: a.) Deist, LLC dba Bucks Manufacturing, North and South paint booth areas, on or about February 9th, 2022 and times prior thereto: Employees perform spray painting/coating operations in the North and South paint booths. Materials including, but not limited to spray booth filters, cardboard, and various 55 gallon drums were stored within three feet of the spray booth. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $4000
- — Z (S) $6657
1910.107 E02
- Issued
- Aug 5, 2022
- Abate by
- Sep 30, 2022
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.107(e)(2): The quantity of flammable or combustible liquids kept in the vicinity of spraying operation(s) exceeded the minimum required for operation: a.) Deist, LLC dba Bucks Manufacturing, North and South paint booth areas, on or about February 9th, 2022 and times prior thereto: Employees perform spray painting/coating operations in the North and South paint booths with flammable liquids. Various containers of flammable liquids were stored next to the South booth. The quantities of flammable liquids that were stored next to the South booth were greater than the minimum required for spraying operations for one day and one shift. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at Deist, LLC.
View Deist, LLC.'s full OSHA safety record →
More inspections in this industry (NAICS 332439)
More inspections in PA