MOUNT JOY, PA —
OSHA Inspection: J.Z. SHIRK CONSTRUCTION LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of J.Z. SHIRK CONSTRUCTION LLC in 4 EMERALD WAY, MOUNT JOY, PA 17552 (NAICS 236115). OSHA activity number 346007206.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- J.Z. SHIRK CONSTRUCTION LLC
- Site address
- 4 EMERALD WAY
- City
- MOUNT JOY
- State
- PA
- ZIP
- 17552
- Mailing
- 100 HARTINGS PARK ROAD, DENVER, PA 17517
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236115
- Employees
- 13
- Ownership type
- A
Citations
2 citations on file for this inspection.
1926.102 A01
- Issued
- Dec 2, 2022
- Abate by
- Mar 24, 2023
- Penalty
- Initial $6,381 · Current $3,000 Reduced
General-duty citation text
29 CFR 1926.102(a)(1):The employer shall ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation. (a) Lot 4 Emerald Way Mount Joy PA New Residential Construction - The employer did not ensure that employees were protected from struck by hazards while using a portable Chop Saw, on or about June 8, 2022. (b) Lot 4 Emerald Way Mount Joy PA New Residential Construction - The employer did not ensure that employees were protected from struck by hazards while using a pneumatic nail gun, on or about June 8, 2022. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $3000
- — Z (S) $6381
1926.501 B13
- Issued
- Dec 2, 2022
- Abate by
- Mar 24, 2023
- Penalty
- Initial $63,812 · Current $19,000 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee engaged in residential construction activities 6 feet (1.8 m) or more above lower levels was not protected by guardrail systems, safety net systems, personal fall arrest systems, or an alternative fall protection measure under another provision of paragraph 1926.501(b), nor did the employer demonstrate that it is infeasible or creates a greater hazard to use these systems and develop and implement a fall protection plan which meets the requirements of paragraph (k) of section: (a) Lot 4 Emerald Way Mount Joy PA, New Residential Construction - An employee was on the front porch roof 10 feet 9 inches above grade with a 2 in 12 pitch installing framing on the main roof eves without fall protection, on or about June 8, 2022. (b) Lot 4 Emerald Way Mount Joy PA ,New Residential Construction - An employee was on the side of the main roof roof 10 feet 9 inches above grade with a 14 in 12 pitch installing sheathing and ice guard on the main roof without fall protection, on or about June 8, 2022. (c) Lot 4 Emerald Way Mount Joy PA, New Residential Construction - An employee was standing at the open window above the front porch 10 feet 9 inches above grade with a 2 in 12 pitch assisting with framing on the porch roof eave without fall protection, on or about June 8, 2022. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (W) $19000
- — Z (W) $63812
More inspections at J.Z. Shirk Construction LLC
View J.Z. Shirk Construction LLC's full OSHA safety record →
More inspections in this industry (NAICS 236115)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346007206.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.