Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: JOE DARRAH, INC.

Federal Agency inspection · Safety discipline

On , OSHA opened a federal Agency safety inspection of JOE DARRAH, INC. in 1099 KINGS MILL ROAD, YORK, PA 17403 (NAICS 423930). OSHA activity number 346106693.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch JOE Darrah, INC. — free Get an email when a new federal OSHA severe-injury report for JOE Darrah, INC. is published. One employer, no account, unsubscribe in one click.
Establishment
JOE DARRAH, INC.
Site address
1099 KINGS MILL ROAD
City
YORK
State
PA
ZIP
17403
Mailing
1099 KINGS MILL ROAD, YORK, PA 17403
Inspection type
Federal Agency (M)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
423930
Employees
40
Ownership type
A

5 citations on file for this inspection.

1910.147 C04 I

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 25, 2023
Abate by
Mar 31, 2023
Penalty
Initial $7,813 · Current $7,813
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section:  (a) SERVICE GARAGE - The employer did not develop and implement a specific energy control procedure to be utilized for the control of potentially hazardous energy associated with powered industrial vehicles. Employees performing servicing and maintenance are exposed to hazardous energy including but not limited to hydraulic, electrical, and gravity, on or about July 27, 2022  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $7813
  • — Z (S) $7813

1910.147 C07 I

Deleted Serious Gravity 5 1 instance 1 exposed
Issued
Jan 25, 2023
Abate by
Mar 1, 2023
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(7)(i): The employer did not provide adequate training to ensure that employees acquired the knowledge and skills required for the safe application, usage and removal of energy control devices:  (a) SERVICE GARAGE - The employer did not ensure that employees who performed servicing and maintenance on powered industrial trucks received  training on the safe application, usage and removal of energy control devices, on or about July 27, 2022.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.178 L01 II

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 25, 2023
Abate by
Mar 31, 2023
Penalty
Initial $7,813 · Current $12,187
29 CFR  1910.178(l)(1)(ii):The employer did not ensure that each operator had successfully completed the training required by paragraph (l), except as permitted by paragraph (l)(5), prior to permitting an employee to operate a powered industrial truck:  a) SERVICE GARAGE - The employer did not ensure that each employee that operated a powered industrial truck  had successfully completed the training , on or about July 27, 2022.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $12187
  • — Z (S) $7813

1910.178 M02

Serious Gravity 10 1 instance 1 exposed
Issued
Jan 25, 2023
Abate by
Mar 31, 2023
Penalty
Initial $15,625 · Current $0 Reduced
29 CFR  1910.178(m)(2):Employee(s) stood under or passed under the elevated portion of a powered industrial truck(s)  a) Service Garage - An employee was conducting servicing and maintenance activities while working under the elevated portion of the TCM forklift, on or about July 27, 2022.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $15625

1910.178 M05 III

Serious Gravity 10 1 instance 1 exposed
Issued
Jan 25, 2023
Abate by
Mar 31, 2023
Penalty
Initial $0 · Current $0
29 CFR  1910.178(m)(5)(iii):Powered industrial truck(s), with the operator dismounted and within 25 feet of the truck still in his view, did not have the load engaging means fully lowered, controls neutralized, and the brakes set to prevent movement:  (a) SERVICE GARAGE - The brakes were not set to prevent movement on the TCM forklift, on or about July 27, 2022.  Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View JOE Darrah, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346106693.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.