On , OSHA opened a complaint safety inspection of BURRIS LOGISTICS, INC. in 4501 DIGNAN ST., JACKSONVILLE, FL 32254 (NAICS 493120). OSHA activity number 346241631.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- BURRIS LOGISTICS, INC.
- Site address
- 4501 DIGNAN ST.
- City
- JACKSONVILLE
- State
- FL
- ZIP
- 32254
- Mailing
- 4501 DIGNAN ST., JACKSONVILLE, FL 32254
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 493120
- Employees
- 149
- Ownership type
- A
Citations
6 citations on file for this inspection.
1910.36 D01
- Issued
- Mar 17, 2023
- Penalty
- Initial $5,692 · Current $4,269 Reduced
General-duty citation text
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a. At 4501 Dignan St, Jacksonville Florida: On or about September 21, 2022, the employer exposed ammonia system operators to an egress obstruction hazard in the event of fire or ammonia release in that the ammonia engine room exit door did not have a panic bar release as required by ANSI/IIAR-2, Standard for Equipment, Design, and Installation of Ammonia Mechanical Refrigerating Systems, paragraph 6.3.1.5.
Recent events (2)
- — I (S) $4269
- — Z (S) $5692
1910.119 D03 I B
- Issued
- Mar 17, 2023
- Penalty
- Initial $7,590 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(d)(3)(i)(B): The employer's piping and instrument diagrams (P&ID) were not accurate and did not represent equipment that was existing and was part of the process. a. At 4501 Dignan St, Jacksonville, Florida: On or about September 21, 2022, the ammonia system piping and instrumentation diagrams (P&ID) were not accurate in that they did not note the decommissioning of the blast freezer piping, valve groups, air handling units, and evaporators that were removed from service in 2015 and were no longer part of the process.
Recent events (2)
- — I (S) $0
- — Z (S) $7590
1910.119 E05
- Issued
- Mar 17, 2023
- Penalty
- Initial $7,590 · Current $5,693 Reduced
General-duty citation text
29 CFR 1910.119(e)(5): The employer did not assure that Process Hazard Analysis (PHA) recommendations were resolved in a timely manner. a. At 4501 Dignan St, Jacksonville, Florida: On or about September 21, 2022, the employer had not resolved 14 Process Hazard Analysis safety recommendation items from the September 30, 2022 Ammonia System Process Hazard Analysis, including items not assigned for action.
Recent events (2)
- — I (S) $5692.5
- — Z (S) $7590
1910.119 L04
- Issued
- Mar 17, 2023
- Penalty
- Initial $5,692 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(l)(4): The employer did not update Process Safety Information (PSI) as required for Management of Change Statements (MOCS): a. At 4501 Dignan St, Jacksonville Florida: On or about September 21, 2022, the employer had not updated the Process Safety Information Block Flow Diagrams and System Descriptions to reflect the 2021 Management of Change Statement for the removal of Blast Cell Walls and decommissioning of the 4 Blast Cell piping, evaporators, air handlers, and valve groups.
Recent events (2)
- — I (S) $0
- — Z (S) $5692
1910.119 O04
- Issued
- Mar 17, 2023
- Penalty
- Initial $7,590 · Current $5,693 Reduced
General-duty citation text
29 CFR 1910.119(o)(4):29 CFR 1910.119(o)(4): The employer did not promptly respond to change recommendations from the Compliance Audit: a. At 4501 Dignan St, Jacksonville Florida: On or about September 21, 2022, the employer had not resolved change recommendations and action items from the April 14, 2021 Ammonia System Process Safety Management Compliance Audit.
Recent events (2)
- — I (S) $5692.5
- — Z (S) $7590
1910.176 B
- Issued
- Mar 17, 2023
- Penalty
- Initial $9,488 · Current $7,116 Reduced
General-duty citation text
29 CFR 1910.176(b): Storage of material created a hazard: a. At 4501 Dignan St, Jacksonville Florida: On or about September 21, 2022, in freezer storage room 5, powered industrial truck (PIT) operator employees were exposed to the hazard of being struck by pallets stored at heights up to 20-feet on the racking system shelves, in that pallets were unstable with boxed goods on pallets that had shifted and were leaning and protruding over the PIT travel aisles.
Recent events (2)
- — I (S) $7116
- — Z (S) $9488
More inspections at Burris Logistics, INC.
View Burris Logistics, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 493120)
More inspections in FL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346241631.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.