Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: SPAN CONSTRUCTION AND DEVELOPMENT LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of SPAN CONSTRUCTION AND DEVELOPMENT LLC in 2350 WILDWOOD AVENUE, SHERWOOD, AR 72120 (NAICS 236220). OSHA activity number 346428402.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Span Construction and Development LLC — free Get an email when a new federal OSHA severe-injury report for Span Construction and Development LLC is published. One employer, no account, unsubscribe in one click.
Site address
2350 WILDWOOD AVENUE
City
SHERWOOD
State
AR
ZIP
72120
Mailing
11524 FAIRVIEW ROAD, LITTLE ROCK, AR 72212
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
12
Ownership type
A

5 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 2 exposed
Issued
Mar 1, 2024
Abate by
Apr 5, 2024
Penalty
Initial $1,165 · Current $1,165
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:  (a) On or about July 21, 2023, the employer failed to submit certification of corrective action for citation 1, item 1a issued June 30, 2023, with an abatement due date of July 11, 2023.  (b) On or about July 24, 2023, the employer failed to submit certification of corrective action for citation 1, item 1b  issued June 30, 2023, with an abatement due date of July 13, 2023.  (c) On or about July 24, 2023, the employer failed to submit certification of corrective action for citation 1, item 2  issued June 30, 2023, with an abatement due date of July 13, 2023.
Recent events (1)
  • — Z (O) $1165

1903.19 D01

Other-than-serious 1 instance 2 exposed
Issued
Mar 1, 2024
Abate by
Apr 5, 2024
Penalty
Initial $1,165 · Current $1,165
29 CFR 1903.19(d)(1):  The employer did not submit to the Agency documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required:  (a)On or about July 21, 2023, the employer failed to submit documentation of corrective action for Citation 1, Item 1a issued on June 30, 2023, with an abatement due date of July 11, 2023.  (b)On or about July 24, 2023, the employer failed to submit documentation of corrective action for Citation 1, Item 1b issued on June 30, 2023, with an abatement due date of July 13, 2023.  (c)On or about July 24, 2023, the employer failed to submit documentation of corrective action for Citation 1, item 2 Issued on June 30, 2023, with an abatement due date of July 13, 2023.
Recent events (1)
  • — Z (O) $1165

1926.451 C02 IV

Serious Gravity 10 1 instance 2 exposed
Issued
Jun 30, 2023
Abate by
Jul 11, 2023
Penalty
Initial $14,063 · Current $4,219 Reduced
29 CFR  1926.451(c)(2)(iv): Front-end loaders and similar pieces of equipment were used to support scaffold platforms when they were not specifically designed by the manufacturer for such use:  (a) On or about January 10, 2023, on the southwest corner of the commercial construction site, employees were using front-end loader as a scaffold platform.
Recent events (2)
  • — I (S) $4218.9
  • — Z (S) $14063

1926.451 C02 V

Serious Gravity 10 1 instance 2 exposed
Issued
Jun 30, 2023
Abate by
Jul 13, 2023
Penalty
Initial $0 · Current $0
29 CFR  1926.451(c)(2)(v):  Fork-lifts were used to support scaffold platforms while the entire platform was not attached to the fork and the fork-lift was moved horizontally while the platform was occupied:  (a) On or about January 10, 2023, on the southwest corner of the commercial construction site, employees were working from a wooden box supported on the forks of a rough terrain forklift and were moved horizontally.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 G01 VII

Serious Gravity 10 1 instance 2 exposed
Issued
Jun 30, 2023
Abate by
Jul 13, 2023
Penalty
Initial $14,063 · Current $4,219 Reduced
29 CFR  1926.451(g)(1)(vii):  Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.  (a) On or about January 10, 2023, on the southwest corner of the commercial construction site, employees were working in excess of 10-feet above the ground without fall protection while working in a wooden box supported by a rough terrain forklift.
Recent events (2)
  • — I (S) $4218.9
  • — Z (S) $14063

View Span Construction and Development LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346428402.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.