NEW CUMBERLAND, PA —
OSHA Inspection: DLA DISTRIBUTION SUSQUEHANNA PENNSYLVANIA
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of DLA DISTRIBUTION SUSQUEHANNA PENNSYLVANIA in 2001 MISSION DRIVE, NEW CUMBERLAND, PA 17070 (NAICS 493110). OSHA activity number 346463789.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- DLA DISTRIBUTION SUSQUEHANNA PENNSYLVANIA
- Site address
- 2001 MISSION DRIVE
- City
- NEW CUMBERLAND
- State
- PA
- ZIP
- 17070
- Mailing
- 2001 MISSION DRIVE, SUITE 1, NEW CUMBERLAND, PA 17070
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 493110
- Employees
- 2283
- Ownership type
- D
Citations
31 citations on file for this inspection.
1910.29 B02
- Issued
- Jul 26, 2023
- Abate by
- Jan 31, 2024
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.29(b)(2): The employer did not ensure that guardrail systems met the requirement that midrails, screens, mesh, intermediate vertical members, solid panels, or equivalent intermediate members that are installed between the walking-working surface and the top edge of the guardrail system as follows when there is not a wall or parapet that is at least 21 inches (53 cm) high: a) Building 765 - Interior loading docks were provided with single chain guardrail systems and midrails were not provided exposing employees to a 54-inch fall hazard, on or about March 23, 2023. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.140 C20
- Issued
- Jul 26, 2023
- Abate by
- Aug 21, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.140(c)(20): The employer did not ensure that ropes, belts, lanyards, lifelines, and harnesses used for personal fall protection were protected from being cut, abraded, melted, or otherwise damaged: (a) DDSP, New Cumberland, EDC, High-Rise Racks and Bins - The employer had employees, who operated Hybrid cranes, store self-retracting lifelines with the web lifeline extended rather than retracted back into the housing, subjecting the spring to weakening, which could cause the lifeline to stop retracting properly, on or about March 6, 2023. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.37 A03
- Issued
- Jul 26, 2023
- Abate by
- Aug 9, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.37(a)(3): Exit route(s) were not kept free and unobstructed: a. Building 83 - On or about March 9, 2023, the exit door P-02 was obstructed by a pedestal fan and relocatable power tap laying in front of the door, impeding egress in the event of a fire or emergency. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.37 A04
- Issued
- Jul 26, 2023
- Abate by
- Aug 7, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.37(a)(4): Safeguard(s) designed to protect employees during an emergency (e.g., sprinkler systems, alarm systems, fire doors, exit lighting), were not in proper working order at all times: a. Building 69 - On or about March 15, 2023, the exit door emergency lighting did not illuminate when tested, exposing employees to fire hazards.. b. Building 750 Door 201 - On or about March 15, 2023, the manually operated fire alarm pull box was obstructed by stacking frames rendering the pull station in operable due to accessibility. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C04 I
- Issued
- Jul 26, 2023
- Abate by
- Aug 21, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) DDSP New Cumberland, Building 753 (Heat Plant) - Employees performed servicing and maintenance work on boilers. The boilers had energy sources that include natural gas, steam, water, and electric. The employer did not develop, document, and utilize machine-specific lockout/tagout procedures for this equipment, exposing employees to hazards, such as getting struck-by hot water or steam, contacting electrical current, and fire and explosion, on or about May 3, 2023. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C06 I
- Issued
- Jul 26, 2023
- Abate by
- Aug 1, 2024
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: (a) DDSP New Cumberland, EDC - The employer did not conduct a periodic inspection of lockout/tagout procedures, in accordance with the standard, in that the employer did not conduct an inspection annually for each lockout/tagout procedure (including, but not limited to, for the Cleco and FKI hybrid cranes) and in that the employer did not include each authorized employee in the periodic inspections, exposing employees to hazards such as struck by associated with unexpected energization or start up, on or about March 14, 2023. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 D04 I
- Issued
- Jul 26, 2023
- Abate by
- Aug 21, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(d)(4)(i):Lockout or tagout devices were not affixed to each energy isolating device by authorized employees: (a) DDSP New Cumberland, EDC, High-Rise Racks and Bins - When performing floor track maintenance on Cleco and FKI hybrid cranes, employees locked out the cranes using an emergency stop on the rear of each crane, which constitutes locking out using control circuitry, rather than applying lockout to an energy isolating device, exposing employees to hazards such as struck by associated with unexpected energization or start up, on or about March 14, 2023. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C05 II
- Issued
- Jul 26, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(5)(ii): Lockout devices and tagout devices were utilized for other purposes than controlling energy: (a) DDSP New Cumberland, EDC - An employee used a lockout lock to lock a chain between the steering wheel and an arm rest on a CarryAll Club Car to prevent others from using the vehicle, on or about March 6, 2023. No abatement certification or documentation required
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.176 B
- Issued
- Jul 26, 2023
- Abate by
- Aug 21, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.176(b): Material stored in tiers was not stacked, blocked, interlocked or limited in height so that it was stable and secure against sliding and collapse: a) Building 52, Bay 2 - On the second tier stacking frames a pallet of boxes was not secured against falling and collapse. A portion of the pallets hung over the edge of the crossbars, on or about 3/23/23. b) Building 52, Bay 2 - On the third tier stacking frames a pallet of boxes was not secured against falling and collapse. A portion of the pallets hung over the edge of the crossbars, on or about 3/23/23. c) Building 52, Bay 2 - A pallet of boxes was not secured against falling and collapse. The pallet was stacked above the top rails of a three tiered stacking frame, on or about March 23, 2023. d) Building 52, LOC 5212120D1 - Loose boxes were not secured against falling and collapse. The boxes were stacked above the top rails of a four tiered stacking frame, on or about March 23, 2023. e) Building 760, Pole C2 - A pallet of storage containers was unstable and leaning, on or about March 16, 2023. f) Building 760, Near Aisle 469 - On the third tier stacking frame, a pallet of boxes was not secured against falling and collapse. A portion of the pallet hung over the edge of the crossbar, on or about March 16, 2023. g) Building 50, Row 316 - A higher stacking frame was not firmly and fully seated into the top cups of the lower stacking frame, on or about March 23, 2023. h) Building 50, Bay 2, 5012-25 - A higher stacking frame was not firmly and fully seated into the top cups of the lower stacking frame, on or about March 23, 2023. i) Building 52 - A higher stacking frame was not firmly and fully seated into the top cups of the lower stacking frame, on or about March 23, 2023. j) Building 52 - A three tiered stacking frame was placed on top of the horizontal brace of an adjacent three tiered stacking frame, on or about March 23, 2023. k) Building 53, Bay 4, rack 5341210B1 - A higher stacking frame was not firmly and fully seated into the top cups of the lower stacking frame, on or about March 23, 2023. l) Building 55, 513 - A higher stacking frame was not firmly and fully seated into the top cups of the lower stacking frame, on or about April 19, 2023. m) Building 83, Bay 5 - A higher stacking frame was not firmly and fully seated into the top cups of the lower stacking frame, on or about March 16, 2023. n) Building 760, LOC 6010630BLKA - A higher stacking frame was not firmly and fully seated into the top cups of the lower stacking frame, on or about March 16, 2023. o) Building 760, LOC LOC 604634BLKD1 - A higher stacking frame was not firmly and fully seated into the top cups of the lower stacking frame, on or about March 16, 2023. p) Building 760, Bay 4, Space 463 - A higher stacking frame was not firmly and fully seated into the top cups of the lower stacking frame, on or about March 16, 2023. Defense Logistics Agency was previously cited for a violation of this occupational safety and health standard 1910.176(b) was contained in OSHA inspection number 1403519, citation number 1, item number 2 and was affirmed as a final order on 10/22/2019, with respect to a workplace located at 450 Martin Luther King Blvd. Robins AFB, GA 31098. Defense Logistics Agency was previously cited for a violation of this occupational safety and health standard 1910.176(b) was contained in OSHA inspection number 1383346, citation number 1, item number 3 and was affirmed as a final order on 08/06/2019, with respect to a workplace located at 450 Martin Luther King Blvd. Robins AFB, GA 31098. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.178 A04
- Issued
- Jul 26, 2023
- Abate by
- Aug 7, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.178(a)(4): Modifications and additions which affect capacity and safe operation were performed by the customer or user without manufacturers prior written approval, and the capacity, operation, and maintenance instruction plates, tags, or decals were not changed accordingly: a. Building 750 MHE Bay - On or about March 15, 2023, the Hyster 60 forklift 20118371 had an underhung Sacket systems attachment device FS000083 which had not been evaluated by the manufacturer of the forklift and approved with an updated load capacity and rating for the attachment and effective load triangle. Defense Logistics Agency was previously cited for a violation of this occupational safety and health standard 1910.178(a)(4), which was contained in OSHA inspection number 1383346, citation number 1, item number 6 and was affirmed as a final order on 08/06/2019, with respect to a workplace located at 450 Mlk Blvd. Robins AFB Warner Robins, GA 31098. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.178 P01
- Issued
- Jul 26, 2023
- Abate by
- Aug 9, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.178(p)(1): Powered industrial truck(s) found to be in need of repair, defective, or in any way unsafe had not been taken out of service until restored to safe operating condition(s): a. Building 87 Bay 2 - On or about March 9, 2023, the battery cord for forklift DLA13291 was damaged with exposed copper. b. Building 750 MHE Bay - On or about March 15, 2023, the flexible cord used to charge the Taylor-Dunn FS000006 stock chaser was damaged and was not taken out of service until repairs were made. Defense Logistics Agency was previously cited for a violation of this occupational safety and health standard 1910.178(p)(1), which was contained in OSHA inspection number 1383346, citation number 1, item number 5 and was affirmed as a final order on 08/06/2019, with respect to a workplace located at 450 Mlk Blvd. Robins AFB, Warner Robins, GA 31098 Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.178 M05 I
- Issued
- Jul 26, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.178(m)(5)(i): Powered industrial trucks were left unattended without the load engaging means lowered, controls neutralized, and the power was not shut off: a. Building 87 Bay 2 - On or about March 9, 2023, forklift was left running and the operator had dismounted and was more than 25 feet away with their back to the equipment filling out paperwork. Corrected During Inspection
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.178 M05 III
- Issued
- Jul 26, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.178(m)(5)(iii): Powered industrial truck(s), with the operator dismounted and within 25 feet of the truck still in his view, did not have the load engaging means fully lowered, controls neutralized, and the brakes set to prevent movement: a) Building 57 - A Yale forklift was observed unattended with its forks raised approximately 30 inches above the floor, on or about April 19, 2023. No abatement certification or documentation required.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.178 L03
- Issued
- Jul 26, 2023
- Abate by
- Aug 21, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.178(l)(3): Powered industrial truck operators did not receive initial training in the following topics, except in topics which the employer can demonstrate are not applicable to safe operation of the truck in the employer's workplace: (a) DDSP New Cumberland, EDC, DK02 - Employees operated a Crown stand-up rider reach truck and a Yale order selector, where the steel storage racks' first horizontal rack beams could enter the operator compartment of these powered industrial trucks, and the employees had not received training in the hazard of under-ride, on or about March 14, 2023. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.212 A01
- Issued
- Jul 26, 2023
- Abate by
- Aug 9, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks: a. Building 750 Metal Shop - On or about March 15, 2023, the DoAll 4F4009 vertical bandsaw used for cutting metal was not guarded to enclose the full blade outside of the point of operation. b. Building 750 Metal Shop - On or about March 15, 2023, the Betenbender 4H5009 press brake was not guarded by distance, shielding or presence sensing device on both sides of the press. Defense Logistics Agency was previously cited for a violation of this occupational safety and health standard 1910.212(a)(1), which was contained in OSHA inspection number 1304815, citation number 1, item number 2 and was affirmed as a final order on 08/28/2018, with respect to a workplace located at 8899 East 56th Street, Indianapolis, IN 46249. Defense Logistics Agency was previously cited for a violation of this occupational safety and health standard 1910.212(a)(1), which was contained in OSHA inspection number 1403521, citation number 1, item number 2 and was affirmed as a final order on 10/22/2019, with respect to a workplace located at 450 Martin Luther King Blvd. Robins AFB, GA 31098 Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.212 A02
- Issued
- Jul 26, 2023
- Abate by
- Aug 9, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.212(a)(2): Guard(s) on machine(s) were not affixed to the machine or secured elsewhere when attachment to the machine was not possible: a. Building 750 Carpentry Shop - On or about March 9, 2023, the belt and pulley guard for the drill press 4F5004 was not affixed to the machine to prevent inadvertent removal, exposing employees to caught in hazards. b. Building 750 Cabinet Shop - On or about March 9, 2023, the upper and lower guard housing for the band blade rolls of the vertical band saw 4F4013 were not secured with tooling to prevent unintentional or unauthorized access, exposing employees to caught in hazards. c. Building 750 Weld Shop - On or about March 15, 2023, the belt and pulley guard for the drill press 4F5004 was not affixed to the machine to prevent inadvertent removal, exposing employees to a caught in hazard. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.215 B09
- Issued
- Jul 26, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.215(b)(9): The distance between the abrasive wheel periphery(s) and the adjustable tongue or the end of the safety guard peripheral member at the top exceeded one fourth inch: a. Building 750 MHE Bay - On or about March 15, 2023, the Wissota W10 bench grinder was did not have the tongue guard adjusted to 1/4" of the grinding wheel, employees were exposed to caught in hazards. Corrected During Inspection
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.213 I01
- Issued
- Jul 26, 2023
- Abate by
- Aug 9, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.213(i)(1): non-working portion(s) of the blade of bandsaw(s) were not enclosed or guarded: a. Building 750 Carpentry Shop - On or about March 9, 2013, the vertical band saw 4F4012 was not guarded to shield the entirety of the unused blade belt above the table, employees were exposed to caught in hazards. b. Building 750 Carpentry Shop - On or about March 9, 2013, the vertical band saw 4F4011 was not guarded to shield the entirety of the unused blade belt above the table, employees were exposed to caught in hazards. c. Building 750 Cabinet Shop - On or about March 9, 2013, the vertical band saw 4F4013 was not guarded to shield the entirety of the unused blade belt above the table, employees were exposed to caught in hazards. d. Building 750 Cabinet Shop - On or about March 9, 2013, the vertical band saw 4F4013 was not guarded to shield under the table, employees were exposed to caught in hazards. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.213 P01
- Issued
- Jul 26, 2023
- Abate by
- Aug 9, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.213(p)(1): Feed rolls of self-feed sanding machine(s) were not protected with semicylindrical guard to prevent the hands of the operator from coming in contact with the in-running rolls: a. Building 750 Cabinet Shop - On or about March 9, 2023, the General International oscillating spindle sander 4F0009 did not have a guard over the unused portion of the spindle in excess to the size of the stock being sanded. Employees were exposed to caught in hazards. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.303 B01 II
- Issued
- Jul 26, 2023
- Abate by
- Aug 21, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.303(b)(1)(ii): Electrical equipment was not free from recognized hazards, based on the mechanical strength and durability, including, for parts designed to enclose and protect other equipment, the adequacy of the protection thus provided: a) Building 760 - The metal conduit and outlet box was damaged, exposing employees to electrical shock hazards on or about March 16, 2023. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.303 G02 I
- Issued
- Jul 26, 2023
- Abate by
- Aug 21, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.303(g)(2)(i): Live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by approved cabinets or other forms of approved enclosures, or other means listed under this provision: a)Building 52 - A power relay 20amp/120vac had the cover removed, exposing employees live wires and parts, on or about March 23, 2023. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.303 G02 II
- Issued
- Jul 26, 2023
- Abate by
- Aug 21, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.303(g)(2)(ii): In locations where electric equipment was likely to be exposed to physical damage, enclosures or guards were not so arranged and of such strength as to prevent such damage: a) Building 760 - A 20 amp/120-volt surface mounted outlet located was not protected from accidental contact or damage, on or about March 16, 2023. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.303 B02
- Issued
- Jul 26, 2023
- Abate by
- Aug 21, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling. a) Building 750 - MHE Shop - The employer connected multiple electrical power strips (known as daisy chaining) in the supply room on or about March 15,2023. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.334 A03 I
- Issued
- Jul 26, 2023
- Abate by
- Aug 7, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.334(a)(3)(i): A flexible cord used with the type of ground equipment did not contain an electrical equipment grounding conductor. a. Building 750 HVAC Shop - On or about March 9, 2023, the flexible cord for the pipe cutter was missing its ground pin, employees were exposed to electrical hazards. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.305 J04 V
- Issued
- Jul 26, 2023
- Abate by
- Aug 21, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.305(j)(4)(v): The disconnecting means was not readily accessible. a) Building 750 - Transportation - On or about March23, 2023, the disconnects in the Transportation Bay labeled EF-1-35 - EF-1-39 were blocked, preventing employees from access. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1960.8 A
- Issued
- Jul 26, 2023
- Abate by
- Jan 31, 2024
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1960.8(a): The Agency head did not furnish employment and a place of employment to each employee that were free from recognized hazards that caused or were likely to cause death or serious physical harm in that employees were exposed to struck-by and crushed-by hazards due to structural collapse: a) Building 50, Near Staging Door 193 - Significant damage to a wooden structural support column had not been evaluated or accessed to determine its structural integrity, on or about March 23, 2023. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1960.8 A
- Issued
- Jul 26, 2023
- Abate by
- Jan 31, 2024
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1960.8(a): The Agency head did not furnish employment and a place of employment to each employee that were free from recognized hazards that caused or were likely to cause death or serious physical harm: a. Building 750 Carpentry and Cabinet Shop - On or about March 9, 2023, the employer failed to perform a dust hazard analysis in accordance with NFPA 652, section 7.1.1.2, to determine if wood dust generated presented a deflagration hazard and implement engineering controls, training and policies to mitigate the risk. The dust had a KSt of 9.17 and Pressure Ratio of 6.99 with an explosive severity of 1.54 which constitutes class 2 dust with explosive potential.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1960.8 A
- Issued
- Jul 26, 2023
- Abate by
- Aug 14, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1960.8(a):29 CFR 1960.8(a): The Agency head did not furnish employment and a place of employment to each employee that were free from recognized hazards that caused or were likely to cause death or serious physical harm from fire or explosion: a. Building 750 MHE Bay - On or about March 15, 2023, flammable storage cabinet 21, 22 and 23 were stored right next to each other and the employer failed to comply with NFPA 30 article and associated table 14.5.2 which requires a separation of 5 feet between cabinets. b. Building 750 MHE Bay - On or about March 15, 2023, the employer had in excess of 3 flammable storage lockers within the bay which is in excess to the quantity designated in DLAR 4145.11 enclosure 6, and NFPA 30 14.5.4. c. Building 750 Room 123 - On or about March 15, 2023, the employer had modified the flammable storage cabinet by drilling holes in the cabinet to affix a padlock device due to the handle not working any longer, by breaching the walls the employer compromised the fire rating as it was not reverified by UL to meet design criteria UL 1275. d. Building 750 HVAC Shop - On or about March 9, 2023, the employer had modified the flammable storage cabinet by drilling holes in the cabinet to affix a padlock device however part of that had fallen off or been removed leaving 4 open holes in the door wall. The modifications were due to the handle not working any longer, by breaching the walls the employer compromised the fire rating as it was not reverified by UL to meet design criteria UL 1275. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1960.8 A
- Issued
- Jul 26, 2023
- Abate by
- Aug 9, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1960.8(a): The Agency head did not furnish employment and a place of employment to each employee that were free from recognized hazards that caused or were likely to cause death or serious physical harm from struck by hazards associated with metal racking. a. Building 83 - The agency failed to ensure pallet racks were marked for capacity in accordance with MH16.1 and DLA Distribution Manual 6055.01 (dated 10/20/17). Capacity ratings were illegible due to being covered by stickers, on or about March 9, 2023. b. Building 750 MHE Bay - On or about March 15, 2023, the racks located near the door to the hall back into the building were not anchored, in addition the racks were not on even flooring which resulted in one end being propped up with red brick. c. Building 750 MHE Supply Room - On or about March 15, 2023, racks in rows, c, d, e, f, g were not anchored to the floor in accordance with MH16.1. d. Building 750 MHE Supply Room - On or about March 15, 2023, the rack system used for belts in row H were not anchored to the floor in accordance with MH16.1. additionally, there were movable shelf racks that did not have the locking pin/safety pin mechanism engaged. e Building 750 MHE Supply Room "toilet" area - On or about March 15, 2023, the movable shelf racks that did not have the locking pin/safety pin mechanism engaged in accordance with MH16.1. f. Building 750 Roads and Grounds - On or about March 15, 2023, the de-icer storage rack had a damaged upright, the employer continued to use the rack instead of taking it out of service for repair in accordance with MH16.1 and DLA Distribution Manual 6055.01 (dated 10/20/17). g. Building 750 Carpentry - On or about March 9, 2023, the plywood rack did not have the locking pin/safety pin in place on the 2nd and 4th tier in accordance with MH16.1. h. Building 87 - On or about March 9, 2023, location 87130818A upright was damaged at the base of the structural metal movable shelf rack, was not taken out of service for repair in accordance with MH16.1 and DLA Distribution Manual 6055.01 (dated 10/20/17). i. Building 87 - On or about March 9, 2023, location 87131305B the movable shelf racks that did not have the locking pin/safety pin mechanism engaged in accordance with MH16.1. j. Building 87 - On or about March 9, 2023, location 87170909 upright was damaged at the base of the structural metal movable shelf rack, was not taken out of service for repair in accordance with MH16.1 and DLA Distribution Manual 6055.01 (dated 10/20/17). k. Building 87 - On or about March 9, 2023, location 6A12192C the adjustable shelf rack cross braces were not set into place and locked into place to prevent dislodgement and collapse were not maintained and installed in accordance with MH16.1.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1960.8 C
- Issued
- Jul 26, 2023
- Abate by
- Aug 21, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1960.8(c): The Agency did not develop, implement, and evaluate an occupational safety and health program in accordance with the requirements of section 19 of the Act, Executive Order 12196, and the basic program elements prescribed in this part, or approved alternate program elements: a) Building 50, Row 338 - The agency failed to ensure that empty stacking frames were pulled and placed in a proper designated stacking frame storage area, in accordance with DLA Distribution Manual 6055.01 (dated 10/20/17). An empty stacking frame was observed between the 2nd and 4th stacking frame tiers, on or about March 23, 2023. b) Building 50, Bay 2, 50124632 - The agency failed to ensure that stacking frames showing visible damage were removed from service and tagged, "Do Not Use" in accordance with DLA Distribution Manual 6055.01 (dated 10/20/17). The upright at the base of the rack was bent and twisted exposing employees to struck-by hazards, on or about March 23, 2023. c) Building 53, Bay 3, 3-08 - The agency failed to ensure that stacking frames showing visible damage were removed from service and tagged, "Do Not Use" in accordance with DLA Distribution Manual 6055.01 (dated 10/20/17). The upright at the base of the rack was bent and the frame was out of plumb exposing employees to struck-by hazards, on or about March 23, 2023. d) Building 56, Bay 1, Rack 08 - The agency failed to ensure that stacking frames showing visible damage were removed from service and tagged, "Do Not Use" in accordance with DLA Distribution Manual 6055.01 (dated 10/20/17). The upright at the base of the rack was bent and twisted exposing employees to struck-by hazards, on or about April 19, 2023. e) Building 760, Aisle 02, Rack 6020246A1 - The agency failed to ensure that stacking frames showing visible damage were removed from service and tagged, "Do Not Use" in accordance with DLA Distribution Manual 6055.01 (dated 10/20/17). The upright at the base of the rack was bent and twisted exposing employees to struck-by hazards, on or about March 16, 2023. f) Building 760, Aisle 02, Rack 6020242A1 - The agency failed to ensure that stacking frames showing visible damage were removed from service and tagged, "Do Not Use" in accordance with DLA Distribution Manual 6055.01 (dated 10/20/17). The upright at the base of the rack was bent and twisted exposing employees to struck-by hazards, on or about March 16, 2023. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.110 F06 II
- Issued
- Jul 26, 2023
- Abate by
- Aug 7, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.110(f)(6)(ii): Containers were not stored in a suitable enclosure or otherwise protected against tampering. a. Building 56 - On or about March 25, 2023, the employer failed to ensure that LPG cylinders were secured in approved enclosures to prevent tampering. Multiple cylinders were stored next to the enclosure. b. Building 52 - On or about March 25, 2023, the employer failed to ensure that LPG cylinders were secured in approved enclosures to prevent tampering. Multiple cylinders were stored next to the enclosure. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at DLA Distribution Susquehanna Pennsylvania
View DLA Distribution Susquehanna Pennsylvania's full OSHA safety record →
More inspections in this industry (NAICS 493110)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346463789.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.