Safety Incidents OSHA Severe Injury Reports · 2015–2025
2,004,209Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: VALMET INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of VALMET INC. in 175 CRYSTAL STREET, LENOX, MA 01240 (NAICS 333243). OSHA activity number 346520893.

Watch Valmet INC. — free Get an email when a new federal OSHA severe-injury report for Valmet INC. is published. One employer, no account, unsubscribe in one click.
Establishment
VALMET INC.
Site address
175 CRYSTAL STREET
City
LENOX
State
MA
ZIP
01240
Mailing
3720 DAVINCI COURT SUITE 300, NORCROSS, GA 30092
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
333243
Employees
72
Ownership type
A

2 citations on file for this inspection.

1910.147 C06 I

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $11162.00 · Current $7813.00 Reduced
29 CFR  1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed:  175 Crystal Street, Lenox, MA: On February 22, 2023, and at times prior, the employer had not performed periodic inspections of energy control procedures, including, but not limited to the Bullard VTL 46 machine, at least annually, to verify that the procedures were adequate and used properly by employees.   Abatement Note: A periodic inspection shall include the following elements:  - Appointment of an authorized employee to inspect each procedure for inaccuracies during an actual energy control task. - A review by inspector with each authorized employee, of that employee's responsibilities under each energy control procedure they are authorized to use. - Certification that the periodic inspections have been performed by identifying the machines or equipment on which the energy control procedures were being utilized, the dates of the inspections, the employees included in the inspections, and the persons performing the inspections.
Recent events (2)
  • — I (S) $7813.4
  • — Z (S) $11162

1910.147 C06 II

Other-than-serious Gravity 1 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR  1910.147(c)(6)(ii): The periodic inspection certification of energy control procedures did not contain the required documentation on identification of the machine or equipment, inspection date, employees included, and the person performing the inspection:  175 Crystal Street, Lenox, MA: On February 22, 2023, and at times prior, the employer did not certify with details that periodic inspections performed contained the required documentation including the identification of the machine or equipment, inspection date, employees included, and the person performing the inspection.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

View VALMET INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346520893.