LENOX, MA ·
OSHA Inspection: VALMET INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of VALMET INC. in 175 CRYSTAL STREET, LENOX, MA 01240 (NAICS 333243). OSHA activity number 346520893.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- VALMET INC.
- Site address
- 175 CRYSTAL STREET
- City
- LENOX
- State
- MA
- ZIP
- 01240
- Mailing
- 3720 DAVINCI COURT SUITE 300, NORCROSS, GA 30092
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 333243
- Employees
- 72
- Ownership type
- Private (A)
Citations
2 citations on file for this inspection.
1910.147 C06 I
- Issued
- May 9, 2023
- Abate by
- Jun 5, 2023
- Penalty
- Initial $11,162 · Current $7,813 Reduced
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: 175 Crystal Street, Lenox, MA: On February 22, 2023, and at times prior, the employer had not performed periodic inspections of energy control procedures, including, but not limited to the Bullard VTL 46 machine, at least annually, to verify that the procedures were adequate and used properly by employees. Abatement Note: A periodic inspection shall include the following elements: - Appointment of an authorized employee to inspect each procedure for inaccuracies during an actual energy control task. - A review by inspector with each authorized employee, of that employee's responsibilities under each energy control procedure they are authorized to use. - Certification that the periodic inspections have been performed by identifying the machines or equipment on which the energy control procedures were being utilized, the dates of the inspections, the employees included in the inspections, and the persons performing the inspections.
Recent events (2)
- · I (S) $7813.4
- · Z (S) $11162
1910.147 C06 II
- Issued
- May 9, 2023
- Abate by
- Jun 5, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(6)(ii): The periodic inspection certification of energy control procedures did not contain the required documentation on identification of the machine or equipment, inspection date, employees included, and the person performing the inspection: 175 Crystal Street, Lenox, MA: On February 22, 2023, and at times prior, the employer did not certify with details that periodic inspections performed contained the required documentation including the identification of the machine or equipment, inspection date, employees included, and the person performing the inspection.
Recent events (2)
- · I (O) $0
- · Z (S) $0
More inspections at Valmet INC.
View Valmet INC.'s full OSHA safety record →
More inspections in this industry (NAICS 333243)
More inspections in MA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 346520893.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.