Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: SEOYON E-HWA INTERIOR SYSTEMS ALABAMA LLC

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of SEOYON E-HWA INTERIOR SYSTEMS ALABAMA LLC in 200 CRAIG FIELD INDUSTRIAL PARKWAY, SELMA, AL 36701 (NAICS 336360). OSHA activity number 346560204.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Seoyon E-Hwa Interior Systems Alabama LLC — free Get an email when a new federal OSHA severe-injury report for Seoyon E-Hwa Interior Systems Alabama LLC is published. One employer, no account, unsubscribe in one click.
Site address
200 CRAIG FIELD INDUSTRIAL PARKWAY
City
SELMA
State
AL
ZIP
36701
Mailing
200 CRAIG FIELD INDUSTRIAL PARKWAY, SELMA, AL 36701
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
336360
Employees
350
Ownership type
A

3 citations on file for this inspection.

1910.147 C04 I

Serious Gravity 5 1 instance 2 exposed
Issued
Jun 9, 2023
Abate by
Jun 22, 2023
Penalty
Initial $8,929 · Current $8,929
29 CFR  1910.147(c)(4)(i):Procedures were not utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section:  a) Line #3 folding machine, Westpark; On or about March 6, 2023, and at times prior to the employer exposed employees to electrical hazards in that employees were conducting maintenance activities on the heating element without first utilizing the lockout/tagout procedure.
Recent events (1)
  • — Z (S) $8929

1910.212 A01

Serious Gravity 5 1 instance 2 exposed
Issued
Jun 9, 2023
Penalty
Initial $9,488 · Current $9,488
29 CFR  1910.212(a)(1):Machine guarding was not provided to protect operator(s) and other employees from hazard(s) created by the point of operation:  a) Line #2 IMG Mold station, Westpark; On or about March 30, 2023, and at times prior to the employer exposed employees to burn hazards in that employees utilized a welding iron that was stored in such a manner that the employee could make contact with the hot elements of the iron or its holster while not in use.
Recent events (1)
  • — Z (S) $9488

1910.132 D01

Other-than-serious 1 instance 2 exposed
Issued
Jun 9, 2023
Abate by
Jun 22, 2023
Penalty
Initial $0 · Current $0
29 CFR  1910.132(d)(1):The employer did not assess the workplace to determine if hazards are present, or are likely to be present, which necessitate the use of personal protective equipment (PPE):  a) CN7A, Glue spray booths; On or about March 9, 2023, and at times prior to the employer failed to assess the workplace and what personal protective equipment would be needed to be worn by employees while working with chemicals in the glue spray booths.
Recent events (1)
  • — Z (O) $0

View Seoyon E-Hwa Interior Systems Alabama LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346560204.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.