PALMYRA, WI —
OSHA Inspection: COLD SPRING EGG FARMS, INC.
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of COLD SPRING EGG FARMS, INC. in W2024 WISCONSIN 59, PALMYRA, WI 53156 (NAICS 111998). OSHA activity number 346676620.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- COLD SPRING EGG FARMS, INC.
- Site address
- W2024 WISCONSIN 59
- City
- PALMYRA
- State
- WI
- ZIP
- 53156
- Mailing
- N9416 TAMARACK RD, WHITEWATER, WI 53190
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 111998
- Employees
- 40
- Ownership type
- A
Citations
7 citations on file for this inspection.
1910.25 C03
- Issued
- Aug 30, 2023
- Abate by
- May 1, 2024
- Penalty
- Initial $7,032 · Current $4,482 Reduced
General-duty citation text
29 CFR 1910.25(c)(3): The employer did not ensure that standard stairs have a minimum tread depth of 9.5 inches (24 cm): On or about May 3, 2023, a standard stairway over the Accumulator machine did not have minimum tread depth of 9.5 in. Tread depth on the stairway measured at approximately 7 in.
Recent events (3)
- — F (S) $4482
- — C (S) $7032
- — Z (S) $7032
1910.147 C04 I
- Issued
- Aug 30, 2023
- Abate by
- Sep 14, 2023
- Penalty
- Initial $9,844 · Current $0 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) On or about August 18, 2023, hazardous energy control procedures for all MR-12 Case Packer #1 line a were not utilized when engaging in covered activities such as sanitation. b) On or about August 18, 2023, hazardous energy control procedures for all MR-12 Case Packer #1 line b were not utilized when engaging in covered activities such as sanitation. c) On or about August 18, 2023, hazardous energy control procedures for all MR-12 Case Packer #2 line a were not utilized when engaging in covered activities such as sanitation. d) On or about August 18, 2023, hazardous energy control procedures for all MR-12 Case Packer #2 line b were not utilized when engaging in covered activities such as sanitation. e) On or about August 18, 2023, hazardous energy control procedures for all MR-12 Case Packer #3 line a were not utilized when engaging in covered activities such as sanitation. f) On or about August 18, 2023, hazardous energy control procedures for all MR-12 Case Packer #3 line b were not utilized when engaging in covered activities such as sanitation. g) On or about August 18, 2023, hazardous energy control procedures for all MR-12 Case Packer #4 line a were not utilized when engaging in covered activities such as sanitation. h) On or about August 18, 2023, hazardous energy control procedures for all MR-12 Case Packer #4 line b were not utilized when engaging in covered activities such as sanitation. i) On or about August 18, 2023, hazardous energy control procedures for all MR-12 Case Packer #5 line a were not utilized when engaging in covered activities such as sanitation. j) On or about August 18, 2023, hazardous energy control procedures for all MR-12 Case Packer #5 line b were not utilized when engaging in covered activities such as sanitation. k) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 1 were not utilized when engaging in covered activities such as sanitation. l) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 2 were not utilized when engaging in covered activities such as sanitation. m) On or about August 17, 2023, and times, prior, hazardous energy control procedures for the Denesters line 3 were not utilized when engaging in covered activities such as sanitation. n) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 4 were not utilized when engaging in covered activities such as sanitation. o) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 5 were not utilized when engaging in covered activities such as sanitation. p) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 6 were not utilized when engaging in covered activities such as sanitation. q) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 7 were not utilized when engaging in covered activities such as sanitation. r) On or about August 17, 2023, hazardous energy control procedures for the Denesters line 8 were not utilized when engaging in covered activities such as sanitation. s) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 9 were not utilized when engaging in covered activities such as sanitation. t) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 10 were not utilized when engaging in covered activities such as sanitation. u) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 11 were not utilized when engaging in covered activities such as sanitation. v) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 12 were not utilized when engaging in covered activities such as sanitation. w) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 13 were not utilized when engaging in covered activities such as sanitation. x) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 14 were not utilized when engaging in covered activities such as sanitation. y) On or about August 17, 2023, hazardous energy control procedures for the Denesters line 15 were not utilized when engaging in covered activities such as sanitation. z) On or about August 17, 2023, and times prior hazardous energy control procedures for the Denesters line 16 were not utilized when engaging in covered activities such as sanitation. aa) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 17 were not utilized when engaging in covered activities such as sanitation. ab) On or about August 17, 2023, and times prior hazardous energy control procedures for the Denesters line 18 were not utilized when engaging in covered activities such as sanitation. ac) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 19 were not utilized when engaging in covered activities such as sanitation. ad) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 20 were not utilized when engaging in covered activities such as sanitation. ae) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 21 were not utilized when engaging in covered activities such as sanitation. af) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 22 were not utilized when engaging in covered activities such as sanitation. ag) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 23 were not utilized when engaging in covered activities such as sanitation. ah) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 24 were not utilized when engaging in covered activities such as sanitation. ai) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 25 were not utilized when engaging in covered activities such as sanitation. aj) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 26 were not utilized when engaging in covered activities such as sanitation. ak) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 27 were not utilized when engaging in covered activities such as sanitation. al) On or about August 17, 2023, and times prior, hazardous energy control procedures for the Denesters line 28 were not utilized when engaging in covered activities such as sanitation. am) On or about August 17, 2023, hazardous energy control procedures for the Omnia PX700 line 1 (left) were not utilized when engaging in covered activities such as sanitation. an) On or about August 17, 2023, hazardous energy control procedures for the Omnia PX700 line 2 (right) were not utilized when engaging in covered activities such as sanitation. ao) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 1 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. ap) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 2 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. aq) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 3 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. ar) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 4 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. as) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 5 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. at) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 6 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. au) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 7 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. av) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 8 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. aw) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 9 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. ax) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 10 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. ay) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 11 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. az) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 12 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. ba) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 13 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bb) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 14 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bc) On or about August 17, 2023, hazardous energy control procedures for packing lane infeed line 15 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bd) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 16 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. be) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 17 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bf) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 18 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bg) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 19 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bh) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 20 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bi) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 21 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bj) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 22 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bk) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 23 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bl) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 24 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bm) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 25 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bn) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 26 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bo) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 27 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation. bp) On or about August 17, 2023, and times prior, hazardous energy control procedures for packing lane infeed line 28 packing conveyor and trestle equipment were not utilized when engaging in covered activities such as sanitation.
Recent events (3)
- — F (S) $0
- — C (S) $9844
- — Z (S) $9844
1910.147 D04 I
- Issued
- Aug 30, 2023
- Abate by
- Sep 14, 2023
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(d)(4)(i): Lockout or tagout devices were not affixed to each energy isolating device by authorized employees: On or about May 5, 2023, two maintenance technicians were engaged in maintenance and servicing activities on a MOBA MR12 Case Packer #4 line a. Isolation devices were not physically located and operated in such a manner to prevent the unexpected re-energization of the conveyor belt and robotic arm. Circuitry controls (i.e., interlocks) were used as the primary method of de-energization.
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1910.147 C07 I
- Issued
- Aug 30, 2023
- Abate by
- Sep 14, 2023
- Penalty
- Initial $9,844 · Current $0 Reduced
General-duty citation text
29 CFR 1910.147(c)(7)(i): The employer did not provide adequate training to ensure that the purpose and function of the energy control program was understood by employees: a) On or about August 18, 2023, sanitation employees have not received training on hazardous energy control procedures for MR-12 Case Packers when engaging in covered activities. b) On or about August 17, 2023, sanitation employees have not received training on hazardous energy control procedures for the Denesters when engaging in covered activities. c) On or about August 17, 2023, sanitation employees have not received training on hazardous energy control procedures for the Omnia PX700 line 1 (left) when engaging in covered activities. d) On or about August 17, 2023, sanitation employees have not received training on hazardous energy control procedures for the Omnia PX700 line 2 (right) when engaging in covered activities. e) On or about August 17, 2023, sanitation employees have not received training on hazardous energy control procedures for packing lane infeed packing conveyor and trestle equipment when engaging in covered activities.
Recent events (3)
- — F (S) $0
- — C (S) $9844
- — Z (S) $9844
1910.212 A01
- Issued
- Aug 30, 2023
- Abate by
- May 1, 2024
- Penalty
- Initial $9,844 · Current $4,482 Reduced
General-duty citation text
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks: On or about May 3, 2023, the employer failed to ensure that the Klutch Benchtop Drill Press was equipped with a safety guard to protect maintenance employees from hazards created by point of operation, ingoing nip points, rotating parts, flying chips and sparks.
Recent events (3)
- — F (S) $4482
- — C (S) $9844
- — Z (S) $9844
1910.215 A04
- Issued
- Aug 30, 2023
- Abate by
- Sep 14, 2023
- Penalty
- Initial $8,438 · Current $0 Reduced
General-duty citation text
29 CFR 1910.215(a)(4): Work rest(s) on grinding machinery were not adjusted closely to the wheel with a maximum opening of one eighth inch: On or about May 3, 2023, the employer did not ensure that the work rest on the Dewalt bench grinder was adjusted within maximum opening of one-eight inch. The work rest was over one-eighth of an inch away from the wheel, exposing employee to struck by hazards during wheel failure and caught in hazards between the work rest and wheel.
Recent events (3)
- — F (S) $0
- — C (S) $8438
- — Z (S) $8438
1910.215 B09
- Issued
- Aug 30, 2023
- Abate by
- May 1, 2024
- Penalty
- Initial $0 · Current $6,329
General-duty citation text
29 CFR 1910.215(b)(9): The distance between the abrasive wheel periphery(s) and the adjustable tongue or the end of the safety guard peripheral member at the top exceeded one fourth inch: On or about May 3, 2023, the employer did not ensure that the tongue guard on the Dewalt bench grinder was adjusted within maximum opening of one- fourth of an inch from the grinding wheel. The adjustable tongue guard was adjusted beyond one-fourth inch of the wheel exposing employees to stuck by hazards during wheel failure.
Recent events (3)
- — F (S) $6329
- — C (S) $0
- — Z (S) $0
More inspections at Cold Spring EGG Farms, INC.
View Cold Spring EGG Farms, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 111998)
More inspections in WI
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346676620.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.