Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: DEPARTMENT OF THE ARMY, CRANE ARMY AMMUNITION ACTIVITY, CRANE, IN

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of DEPARTMENT OF THE ARMY, CRANE ARMY AMMUNITION ACTIVITY, CRANE, IN in 300 HIGHWAY 361, CRANE, IN 47522 (NAICS 928110). OSHA activity number 346718729.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Department of the Army, Crane Army Ammunition Activity, Crane, in — free Get an email when a new federal OSHA severe-injury report for Department of the Army, Crane Army Ammunition Activity, Crane, in is published. One employer, no account, unsubscribe in one click.
Site address
300 HIGHWAY 361
City
CRANE
State
IN
ZIP
47522
Mailing
NSWC, CAAA, BUILDING 3373 ATTENTION: LUKE KEARNS, CRANE, IN 47522
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
928110
Employees
650
Ownership type
D

7 citations on file for this inspection.

1910.119 C01

Serious Gravity 10 1 instance 650 exposed
Issued
Nov 8, 2023
Abate by
Oct 1, 2025
Penalty
Initial $0 · Current $0

Hazardous substances 004013802135H146M100

29 CFR  1910.119(c)(1): Employers shall develop a written plan of action regarding the implementation of the employee participation required by this paragraph.   (a)  On or about May 23, 2023, the employer had not implemented an employee participation plan as required for process safety management activities that included front line employee participation in PSM, such as participation in process hazard analysis, their related recommendations, availability of process safety information and process hazard analysis recommendation resolution(s) for the manufacturing and recycling of military ammunition and pyrotechnics.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.119 E01

Serious Gravity 10 1 instance 650 exposed
Issued
Nov 8, 2023
Abate by
Oct 1, 2026
Penalty
Initial $0 · Current $0

Hazardous substances 004013802135H146M100

29 CFR 1910.119(e)(1): The employer shall perform an initial process hazard analysis (hazard evaluation) on processes covered by this standard. The process hazard analysis shall be appropriate to the complexity of the process and shall identify, evaluate, and control the hazards involved in the process.  Employers shall determine and document the priority order for conducting process hazard analyses based on a rationale which includes such considerations as extent of the process hazards, number of potentially affected employees, age of the process, and operating history of the process.   a)  On or about May 23, 2023, the employer had not conducted an initial process hazard analysis for the manufacture and assembly of MJU-75/B flares in Bldg. 200/2504, or for other manufacturing processes of explosives and pyrotechnics conducted at Crane Army Ammunition Activity.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.119 E02

Serious Gravity 10 1 instance 650 exposed
Issued
Nov 8, 2023
Abate by
Oct 1, 2026
Penalty
Initial $0 · Current $0

Hazardous substances 004013802135H146M100

29 CFR  1910.119(e)(2): The employer shall use one or more of the following methodologies that are appropriate to determine and evaluate the hazards of the process being analyzed.  a)  On or about May 23, 2023, the employer had not conducted an initial process hazard analysis using one of the appropriate methodologies listed in this standard for the manufacture and assembly of explosives and pyrotechnics, such as but not limited to MJU-75/B flares in Bldg. 200/2504.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.119 J02

Serious Gravity 10 1 instance 650 exposed
Issued
Nov 8, 2023
Abate by
Jan 5, 2026
Penalty
Initial $0 · Current $0

Hazardous substances 004013802135H146M100

29 CFR  1910.119(j)(2):  Written procedures. The employer shall establish and implement written procedures to maintain the on-going integrity of process equipment.   a)  On or about May 23, 2023, the employer failed to establish, document and implement mechanical integrity procedures to assure safe operation of process equipment, such as but not limited to, written procedures for the preventative maintenance of the blender and extruder in Bldg. 2504.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.119 J03

Serious Gravity 10 1 instance 650 exposed
Issued
Nov 8, 2023
Abate by
Jan 5, 2026
Penalty
Initial $0 · Current $0

Hazardous substances 004013802135H146M100

29 CFR  1910.119(j)(3): Training for process maintenance activities. The employer shall train each employee involved in maintaining the on-going integrity of process equipment in an overview of that process and its hazards and in the procedures applicable to the employee's job tasks to assure that the employee can perform the job tasks in a safe manner.   a)  On or about May 23, 2023, the employer failed to establish, document and implement mechanical integrity training for maintenance activities to assure the safe operation of process equipment, such as but not limited to, the blender and extruder in Bldg. 2504.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.119 L01

Serious Gravity 10 1 instance 650 exposed
Issued
Nov 8, 2023
Abate by
Oct 1, 2025
Penalty
Initial $0 · Current $0

Hazardous substances 004013802135H146M100

29 CFR  1910.119(l)(1): The employer shall establish and implement written procedures to manage changes (except for "replacements in kind") to process chemicals, technology, equipment, and procedures; and, changes to facilities that affect a covered process.   a)  On or about July 10, 2023, the employer did not implement written procedures for the management of change for upgrades to the extruder in Bldg. 2504, such as but not limited to work order 70254 replumb the extruder pump, heat exchanger and piping.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.119 O01

Serious Gravity 10 1 instance 650 exposed
Issued
Nov 8, 2023
Abate by
Oct 1, 2026
Penalty
Initial $0 · Current $0

Hazardous substances 004013802135H146M100

29 CFR  1910.119(o)(1):  Employers shall certify that they have evaluated compliance with the provisions of this section at least every three years to verify that the procedures and practices developed under the standard are adequate and are being followed.  (a)  On or about May 23, 2023, the employer had not conducted compliance audits of areas that were covered by process safety management, such as but not limited to Bldg. 200/2504 manufacturing and assembling MJU-75/B flares.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Department of the Army, Crane Army Ammunition Activity, Crane, in's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346718729.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.