OSHA Inspection: MDR CONSTRUCTION, INC.

Federal Agency inspection · Safety discipline

On , OSHA opened a federal Agency safety inspection of MDR CONSTRUCTION, INC. in 25 RIVER MOUNTAIN RD, DELAWARE, AR 72835 (NAICS 238210). OSHA activity number 346746712.

Watch MDR Construction, INC. — free Get an email when a new federal OSHA severe-injury report for MDR Construction, INC. is published. One employer, no account, unsubscribe in one click.
Site address
25 RIVER MOUNTAIN RD
City
DELAWARE
State
AR
ZIP
72835
Mailing
621 E. BAYLIS CHAPEL ROAD, COLUMBIA, MS 39429
Inspection type
Federal Agency (M)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238210
Employees
3
Ownership type
A

3 citations on file for this inspection.

1910.268 J04 IV A

Other-than-serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $15625.00 · Current $15625.00
29 CFR 1910.268(j)(4)(iv)(A): Manufacturer's specifications, load ratings and instructions for derrick operation were not strictly observed:  On or about June 1, 2023, at the utility pole staging site, employees were moving utility poles with a truck mounted crane which had a missing boom angle indicator exposing employees to struck by hazards.
Recent events (2)
  • — I (O) $15625
  • — Z (S) $15625

1910.268 J04 IV E

Other-than-serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $15625.00 · Current $15625.00
29 CFR 1910.268(j)(4)(iv)(E): Hand signals to derrick operators were not those prescribed by ANSI B30.6-1969, "Safety Code for Derricks":   On or about June 1, 2023, at the pole staging site, employees moving utility poles with a truck mounted crane used general gestures such as but not limited to verbal, hand waves, to signal the derrick operator in lieu of standardized signals exposing employees to a struck by hazard.
Recent events (2)
  • — I (O) $15625
  • — Z (S) $15625

1910.268 K01

Serious Gravity 10 1 instance 3 exposed
Issued
Abate by
Penalty
Initial $156259.00 · Current $135000.00 Reduced
29 CFR 1910.268(k)(1): When working with poles in piles or stacks, work was not performed from the ends of the poles as much as possible, and precautions were not taken for the safety of employees at the other end of the pole:  On or about June 1, 2023, at the pole staging site, the employer did not ensure employees moving poles from a pile were working from the ends of the poles.
Recent events (2)
  • — I (S) $135000
  • — Z (W) $156259

View MDR CONSTRUCTION, INC.'s full OSHA safety record →