OSHA Inspection: DAY POLYMER RESOURCES, LLC

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of DAY POLYMER RESOURCES, LLC in 9774 TREASE ROAD, WADSWORTH, OH 44281 (NAICS 326199). OSHA activity number 346891229.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch DAY Polymer Resources, LLC — free Get an email when a new federal OSHA severe-injury report for DAY Polymer Resources, LLC is published. One employer, no account, unsubscribe in one click.
Site address
9774 TREASE ROAD
City
WADSWORTH
State
OH
ZIP
44281
Mailing
9774 TREASE ROAD, WADSWORTH, OH 44281
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
326199
Employees
25
Ownership type
A

6 citations on file for this inspection.

1910.28 B11 I

Serious Gravity 1 1 instance 1 exposed
Issued
Dec 7, 2023
Penalty
Initial $2,678 · Current $2,678
29 CFR  1910.28(b)(11)(i):(i) Each employee exposed to an unprotected side or edge of a stairway landing that is 4 feet (1.2 m) or more above a lower level is protected by a guardrail or stair rail system;  On or about August 7, 2023, the employer failed to ensure the unprotected side or edge (right side when ascending) of the stairway landing leading to the Extruder Line No. 3 Pelletizer machine was equipped with a guardrail or stair rail system.  The Line No. 3 Pelletizer stairway landing was approximately 57 inches above the workshop floor.
Recent events (2)
  • — I (S) $2678
  • — Z (S) $2678

1910.28 B11 II

Serious Gravity 1 1 instance 1 exposed
Issued
Dec 7, 2023
Penalty
Initial $0 · Current $0
29 CFR  1910.28(b)(11)(ii):(ii) Each flight of stairs having at least 3 treads and at least 4 risers is equipped with stair rail systems and handrails as follows:   On or about August 7, 2023, the employer failed to ensure the flight of stairs leading to the Line No. 3 Pelletizer machine was equipped with a stair rail system and/or handrail on the right side of the stairway when ascending.  The Line No. 3 Pelletizer stairway had 4 treads and 5 risers.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.212 A01

Other-than-serious Gravity 5 1 instance 2 exposed
Issued
Dec 7, 2023
Penalty
Initial $4,465 · Current $0 Reduced
29 CFR  1910.212(a)(1):Types of guarding. One or more methods of machine guarding shall be provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks.   On or about August 7, 2023, the employer failed to ensure the Extruder Line No. 2 Feed (Screw) Auger was guarded to protect employees and operators from the rotating parts of the auger.
Recent events (2)
  • — I (O) $0
  • — Z (S) $4465

1910.303 B02

Serious Gravity 1 1 instance 1 exposed
Issued
Dec 7, 2023
Penalty
Initial $2,678 · Current $2,678
29 CFR  1910.303(b)(2):Installation and use. Listed or labeled equipment shall be installed and used in accordance with any instructions included in the listing or labeling.  On or about August 7, 2023, the employer failed to ensure the electrical receptacle (outlet) box used to power the 220V Extruder Line No. 2 vacuum pump was installed in accordance with the listed and labelled instructions.  The electrical receptacle box was designed for secured installation inside a wall or other fixture.
Recent events (2)
  • — I (S) $2678
  • — Z (S) $2678

1910.305 G02 III

Serious Gravity 1 1 instance 1 exposed
Issued
Dec 7, 2023
Penalty
Initial $0 · Current $0
29 CFR  1910.305(g)(2)(iii):Flexible cords and cables shall be connected to devices and fittings so that strain relief is provided that will prevent pull from being directly transmitted to joints or terminal screws.  On or about August 7, 2023, the employer failed to ensure the flexible cord connected to the electrical receptacle (outlet) box used to power the 220V Extruder Line No. 2 vacuum pump was provided with strain relief to prevent the conductors from being pulled from the receptacle outlet box.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.178 L06

Other-than-serious 1 instance 3 exposed
Issued
Dec 7, 2023
Abate by
Jan 11, 2024
Penalty
Initial $0 · Current $0
29 CFR  1910.178(l)(6):Certification. The employer shall certify that each operator has been trained and evaluated as required by this paragraph (l). The certification shall include the name of the operator, the date of the training, the date of the evaluation, and the identity of the person(s) performing the training or evaluation.  On or about August 7, 2023, the employer failed to certify, with a certification that included the name of the operator, the date of training, and the date of the evaluation, that training and evaluation had been conducted for each operator of a powered industrial truck (forklift).
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View DAY Polymer Resources, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346891229.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.