OSHA Inspection: THE SHERWIN-WILLIAMS COMPANY

Referral inspection · Health discipline

On , OSHA opened a referral health inspection of THE SHERWIN-WILLIAMS COMPANY in 701 SOUTH SHILOH ROAD, GARLAND, TX 75042 (NAICS 325510). OSHA activity number 346891641.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch The Sherwin-Williams Company — free Get an email when a new federal OSHA severe-injury report for The Sherwin-Williams Company is published. One employer, no account, unsubscribe in one click.
Site address
701 SOUTH SHILOH ROAD
City
GARLAND
State
TX
ZIP
75042
Mailing
701 SOUTH SHILOH ROAD, GARLAND, TX 75042
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
325510
Employees
250
Ownership type
A

10 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 1 instance 5 exposed
Issued
Feb 5, 2024
Abate by
Mar 22, 2024
Penalty
Initial $16,131 · Current $9,679 Reduced
OSH ACT of 1970 Section (5)(a)(1): The employer did not furnish employment and a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to an unstable chemical reaction from improperly stored Organic Peroxide compound Luperox 26 A:  a) On or about August 7, 2023, and times prior thereto, employees were exposed to fire and explosion hazards from unstable chemical reaction due to the improper storage of Luperox 26 A which was not stored in a temperature-controlled environment.
Recent events (2)
  • — I (S) $9678.6
  • — Z (S) $16131

1910.119 D03 I D

Serious Gravity 10 1 instance 3 exposed
Issued
Feb 5, 2024
Abate by
Mar 22, 2024
Penalty
Initial $16,131 · Current $9,679 Reduced
29 CFR  1910.119(d)(3)(i)(D): Relief system design and design basis;  a) On or about August 7, 2023, and at times prior, at the Sherwin-Williams facility located in Garland, Texas, relief valve PSV-5408 was not included in the relief system design or design basis associated with the pressure vessel CAT-5 written process safety information. This condition exposed employees to struck-by hazards.
Recent events (2)
  • — I (S) $9678.6
  • — Z (S) $16131

1910.119 E03 I

Serious Gravity 10 1 instance 3 exposed
Issued
Feb 5, 2024
Abate by
Mar 22, 2024
Penalty
Initial $16,131 · Current $9,679 Reduced
29 CFR  1910.119(e)(3)(i): The process hazard analysis did not address the hazards of the process.   (a) On or about August 7, 2023, and at times prior, at the Sherwin-Williams facility in Garland, Texas, the 2021 Process Hazard Analysis did not identify the hazards of self-reactive, thermally sensitive chemicals and potential for high ambient temperatures on vessel CAT-5 charged with organic oxidizers. This condition exposed employees to struck-by hazards.
Recent events (2)
  • — I (S) $9678.6
  • — Z (S) $16131

1910.119 E03 V

Serious Gravity 10 1 instance 3 exposed
Issued
Feb 5, 2024
Abate by
Mar 22, 2024
Penalty
Initial $16,131 · Current $9,679 Reduced
29 CFR  1910.119(e)(3)(v): The process hazard analysis did not address the hazards related to facility siting:   a) On or about August 7, 2023, and at times prior, at the Sherwin-Williams facility located in Garland, Texas, the employer did not address process equipment siting near the control room when it evaluated the facility siting in the Process Hazard Analysis. This condition exposed employees to struck-by hazards.
Recent events (2)
  • — I (S) $9678.6
  • — Z (S) $16131

1910.119 F01 II

Serious Gravity 10 1 instance 3 exposed
Issued
Feb 5, 2024
Abate by
Mar 22, 2024
Penalty
Initial $16,131 · Current $9,679 Reduced
29 CFR  1910.119(f)(1)(ii): The employer did not develop and implement written operating procedures that provided clear instructions for safely conducting activities involved in each covered process consistent with the process safety information that addressed operating limits.  a) On or about August 7, 2023, and at times prior, at the Sherwin-Williams facility in Garland, Texas, the normal operating procedure, SQ4736P, did not list the operating limits, including specific upper temperature limits, for Luperox-26 (organic peroxide) used in CAT-5. This condition exposed employees to struck-by hazards.
Recent events (2)
  • — I (S) $9678.6
  • — Z (S) $16131

1910.119 F01 II A

Serious Gravity 10 1 instance 3 exposed
Issued
Feb 5, 2024
Abate by
Mar 22, 2024
Penalty
Initial $0 · Current $0
29 CFR  1910.119(f)(1)(ii)(A): The employer did not develop and implement written operating procedures that addressed the consequences of deviations from the operating limits in the covered process;  a) On or about August 7, 2023, and at times prior, at the Sherwin-Williams facility in Garland, Texas, the employer did not address the consequences of deviation from operating limits. This condition exposed employees to struck-by hazards.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.119 G02

Serious Gravity 10 1 instance 3 exposed
Issued
Feb 5, 2024
Abate by
Mar 22, 2024
Penalty
Initial $16,131 · Current $9,679 Reduced
29 CFR  1910.119(g)(2): Refresher training was not provided at least every three years to each employee involved in operating a process to assure that the employee understands and adheres to the current operating procedures of the process:  a) On or about August 7, 2023, and at times prior, at the Sherwin-Williams facility located in Garland, Texas, the employer did not provide operator refresher training at least every three years or more often, if necessary. This condition exposed employees to struck-by hazards.
Recent events (2)
  • — I (S) $9678.6
  • — Z (S) $16131

1910.119 G02

Serious Gravity 10 1 instance 3 exposed
Issued
Feb 5, 2024
Abate by
Mar 22, 2024
Penalty
Initial $16,131 · Current $0 Reduced
Refresher training was not provided at least every three years to each employee involved in operating a process to assure that the employee understands and adheres to the current operating procedures of the process:  a) On or about August 7, 2023, and at times prior, at the Sherwin-Williams facility located in Garland, Texas, the employer did not provide operator refresher training at least every three years or more often, if necessary. This condition exposed employees to struck-by hazards.
Recent events (2)
  • — I (S) $0
  • — Z (S) $16131

1910.119 J02

Serious Gravity 10 3 instances 3 exposed
Issued
Feb 5, 2024
Abate by
Mar 22, 2024
Penalty
Initial $16,131 · Current $9,679 Reduced
29 CFR 1910.119(j)(2): The employer did not establish written procedures to maintain the on-going integrity of process equipment:  (a) On or about August 7, 2023, and at times prior, at the Sherwin-Williams facility in Garland, Texas, the employer did not establish written procedures for inspecting pressure vessels.    (b) On or about August 7, 2023, and at times prior, at the Sherwin-Williams facility in Garland, Texas, the employer did not establish written procedures for inspecting piping systems.    (c) On or about August 7, 2023, and at times prior, at the Sherwin Williams facility located in Garland, Texas, the employer did not develop a mechanical integrity program for corrosion under insulation inspections  These conditions exposed employees to struck-by hazards.
Recent events (2)
  • — I (S) $9678.6
  • — Z (S) $16131

1910.119 J04 I

Serious Gravity 10 5 instances 3 exposed
Issued
Feb 5, 2024
Abate by
Mar 22, 2024
Penalty
Initial $161,310 · Current $96,786 Reduced
29 CFR  1910.119(j)(4)(i): The employer did not perform inspection and tests on process equipment:  (a)  On August 7, 2023, and at times prior, at the Sherwin-Williams facility  in Garland, Texas, the employer did not inspect the 1/2"-150 psig process piping from vessel CAT-5 to reactor R-5  (b) On August 7, 2023, and at times prior, at the Sherwin-Williams facility in Garland, Texas, the employer did not inspect the 3"-150 psig process piping from reactor R5 to Tank TD-4 (RI-103-CI-3-N).  (c) On August 7, 2023, and at times prior, at the Sherwin-Williams facility in Garland, Texas, the employer did not inspect the 3"-150 psig  process piping from reactor R5 to Tank TD-5 (RI-101-CI-3-N)  (d) On August 7, 2023, and at times prior, at the Sherwin-Williams facility in Garland, Texas, the employer did not inspect the process piping from vessel WT-5B to reactor R5.  (e) On August 7, 2023, and at times prior, at the Sherwin-Williams facility located in Garland, Texas, the employer did inspect the  process piping from the PM Acetate tank to WT-5B  These conditions exposed employees to struck-by hazards.  The Sherwin-Williams Company was previously cited for a Serious violation of this occupational safety and health standard or its equivalent standard 1910.119(j)(4)(i), which was contained in OSHA inspection number 1572722, Citation Number 1, Item number 5, and was affirmed as a final order on July 7, 2022, with a final abatement date on July 8,  2022, with respect to a workplace located at 301 Plant Road Ennis, Texas 75119.
Recent events (2)
  • — I (S) $96786
  • — Z (R) $161310

View The Sherwin-Williams Company's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346891641.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.