LEBANON, PA —
OSHA Inspection: GABLE & SON CONSTRUCTION, INC.
Unprogrammed Other inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Other safety inspection of GABLE & SON CONSTRUCTION, INC. in 410 SPRINGWOOD DRIVE, LEBANON, PA 17042 (NAICS 238160). OSHA activity number 346921042.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- GABLE & SON CONSTRUCTION, INC.
- Site address
- 410 SPRINGWOOD DRIVE
- City
- LEBANON
- State
- PA
- ZIP
- 17042
- Mailing
- 500 SOUTH 9TH STREET, LEBANON, PA 17042
What kind of inspection was it?
- Inspection type
- Unprogrammed Other (I)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 5
- Ownership type
- A
Citations
1 citation on file for this inspection.
1926.501 B13
- Issued
- Oct 27, 2023
- Abate by
- Nov 16, 2023
- Penalty
- Initial $5,625 · Current $3,500 Reduced
General-duty citation text
29 CFR 1926.501(b)(13):Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) Jobsite, 410 Springwood Drive Lebanon, PA - On or about August 16, 2023, employees engaged in roofing work on a five story apartment complex were not protected by the use of fall protection, exposing employees to a fall hazard of approximately 50 feet. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $3500
- — Z (S) $5625
More inspections at Gable & SON Construction, INC.
View Gable & SON Construction, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238160)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 346921042.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.