Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: SCHAD BOILER SETTING COMPANY DBA SCHAD REFRACTORY CONSTRUCTION COMPANY

Unprogrammed Related inspection · Health discipline

On , OSHA opened an unprogrammed Related health inspection of SCHAD BOILER SETTING COMPANY DBA SCHAD REFRACTORY CONSTRUCTION COMPANY in 900 EAST LINCOLN HIGHWAY, CHICAGO HEIGHTS, IL 60411 (NAICS 327120). OSHA activity number 347540296.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Schad Boiler Setting Company DBA Schad Refractory Construction Company — free Get an email when a new federal OSHA severe-injury report for Schad Boiler Setting Company DBA Schad Refractory Construction Company is published. One employer, no account, unsubscribe in one click.
Site address
900 EAST LINCOLN HIGHWAY
City
CHICAGO HEIGHTS
State
IL
ZIP
60411
Mailing
15240 CASTLETON STREET, DETROIT, MI 48227
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
327120
Employees
149
Ownership type
A

4 citations on file for this inspection.

1910.28 B01 I

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 17, 2024
Penalty
Initial $12,445 · Current $11,000 Reduced
29 CFR  1910.28(b)(1)(i):  The employer did not ensure that each employee on a walking-working surface with an unprotected side or edge that is 4 feet (1.2 m) or more above a lower level is protected from falling by one or more of the systems described in 29 CFR 1910.28(b)(1)(i):  a.  On or about June 10, 2024, in the main furnace, contractors rebuilding a furnace were exposed to falls of approximately eight-nine inches (89") when working at the edge of the furnace, an unprotected side.
Recent events (2)
  • — I (S) $11000
  • — Z (S) $12445

1910.146 D05 I

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 17, 2024
Penalty
Initial $10,372 · Current $8,000 Reduced
29 CFR  1910.146(d)(5)(i): Under the permit-required confined space program required by 29 CFR 1910.146(c)(4), the employer did not evaluate permit space conditions when entry operations were conducted by testing conditions in the permit space to determine it was safe for entry:     a.  On or about June 3, 2024, in the facility, employees were exposed to hazards associated with permit required confined spaces when the employer failed to verify that conditions inside the space were acceptable for entry.  Potential employee exposure included a hazardous atmosphere from chlorine and nitrogen gas(es) after the employer failed to isolate the space and evaluate the atmosphere prior to first entry.
Recent events (2)
  • — I (S) $8000
  • — Z (S) $10372

1910.146 E01

Serious Gravity 5 1 instance 1 exposed
Issued
Sep 17, 2024
Penalty
Initial $12,445 · Current $0 Reduced
29 CFR  1910.146(e)(1): Before entry was authorized, the employer did not document the completion of measures required by 29 CFR 1910.146(d)(3) by preparing an entry permit:    a.  On or about June 3, 2024, at the jobsite, the employer failed to complete a permit required confined space entry permit for employees entering the furnace to perform furnace relining activities.                   Employees within the space were, thereby exposed to hazards associated with entry into a permit required confined space.
Recent events (2)
  • — I (S) $0
  • — Z (S) $12445

1910.146 C07 III

Other-than-serious 1 instance 1 exposed
Issued
Sep 17, 2024
Penalty
Initial $1,165 · Current $1,000 Reduced
29 CFR  1910.146(c)(7)(iii): The employer did not document the basis for determining that all hazards in a permit space had been eliminated, through a written certification that contained the date, the location of the space, and the signature of the person(s) making that determination:    a.  On or about June 3, 2024, at the jobsite, employees working in the main furnace were exposed to hazards associated with permit required confined space(s) when the employer failed to document through a written certification the measures taken to prepare the space for safe entry and that all hazards in the space were eliminated prior to entry.
Recent events (2)
  • — I (O) $1000
  • — Z (O) $1165

View Schad Boiler Setting Company DBA Schad Refractory Construction Company's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347540296.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.