OSHA Inspection: J N PALLET COMPANY, LLC

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of J N PALLET COMPANY, LLC in 11207 CARR ROAD, CONNEAUTVILLE, PA 16406 (NAICS 321920). OSHA activity number 347615924.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch J N Pallet Company, LLC — free Get an email when a new federal OSHA severe-injury report for J N Pallet Company, LLC is published. One employer, no account, unsubscribe in one click.
Site address
11207 CARR ROAD
City
CONNEAUTVILLE
State
PA
ZIP
16406
Mailing
11207 CARR ROAD, CONNEAUTVILLE, PA 16406
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
321920
Employees
28
Ownership type
A

9 citations on file for this inspection.

1910.29 B02

Serious Gravity 5 1 instance 8 exposed
Issued
Sep 30, 2024
Abate by
Oct 25, 2024
Penalty
Initial $5,485 · Current $2,000 Reduced
29 CFR 1910.29(b)(2): The employer did not ensure that guardrail systems met the requirement that mid rails, screens, mesh, intermediate vertical members, solid panels, or equivalent intermediate members that are installed between the walking-working surface and the top edge of the guardrail system as follows when there is not a wall or parapet that is at least 21 inches (53 cm) high.   a.)  Jn Pallet Company, LLC; Scragg Building - on or about 7/15/24, and at times prior thereto:  The 7-riser stairway was not equipped with a mid-rail.  The stairway led from the floor to the scrub grass mill.   ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2000
  • — Z (S) $5485

1910.22 D02

Serious Gravity 5 1 instance 8 exposed
Issued
Sep 30, 2024
Abate by
Oct 25, 2024
Penalty
Initial $0 · Current $0
29 CFR  1910.22(d)(2): The employer did not ensure that hazardous conditions on walking-working surfaces are corrected or repaired before an employee uses the walking-working surface again. The employer did not ensure that if the correction or repair cannot be made immediately, the hazard is guarded to prevent employees from using the walking-working surface until the hazard is corrected or repaired.     a.)  Jn Pallet Company, LLC;  Scragg Building - on or about 7/15/24,  and at times prior thereto:  The treads of the stairway were bent/sloped in the middle of each riser .  The stairway led from the floor to the scrub grass mill.   ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.147 C04 II

Serious Gravity 10 1 instance 3 exposed
Issued
Sep 30, 2024
Abate by
Oct 25, 2024
Penalty
Initial $11,292 · Current $11,000 Reduced
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, including, but not limited to Items of this section:  a.)  JN Pallet Company, LLC - On or about 7/15/24, and at times prior thereto, the lockout/tagout procedures did not address the specific hazard of the saw blades coasting to a stop during shutdown.  Employees periodically conduct servicing, maintenance and repair on equipment including, but not limited to, conveyors, saws and dust collection systems.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $11000
  • — Z (S) $11292

1910.147 C05 I

Serious Gravity 5 1 instance 3 exposed
Issued
Sep 30, 2024
Abate by
Jan 17, 2025
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(5)(i): Locks, tags, chains, wedges, key blocks, adapter pins, self-locking fasteners, or other hardware were not provided by the employer for isolating, securing or blocking of machines or equipment from energy sources:   a.)  JN Pallet Company, LLC - On or about 7/15/24, and at times prior thereto, the door that covered the saw blades on the Pendu gangsaw did not contain time delayed mechanisms and/or other devices to protect personnel from the saw blades that have to coast to a stop.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.147 D02

Serious Gravity 5 1 instance 3 exposed
Issued
Sep 30, 2024
Abate by
Oct 25, 2024
Penalty
Initial $0 · Current $0
29 CFR 1910.147(d)(2): An orderly shutdown of machine or equipment was not utilized to avoid any additional or increased hazards to employees as a result of equipment stoppage:   a.)  JN Pallet Company, LLC - On or about 7/15/24, and at times prior thereto, the shut down the of Pendu double gangsaw did not have any precautions in place to ensure the saw blades come to a full stop prior to the guard being opened. The saw blades coast to a stop and continue to operate for several seconds after the equipment is shut down or locked out.  Employees periodically conduct servicing, maintenance and repair on equipment including, but not limited to, conveyors, saws and dust collection systems.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.145 C02 I

Serious Gravity 1 1 instance 8 exposed
Issued
Sep 30, 2024
Abate by
Oct 25, 2024
Penalty
Initial $0 · Current $0
29 CFR 1910.145(c)(2)(i): Caution signs were not used to warn against potential hazards or to caution against unsafe practices:  a.)  Jn Pallet Company, LLC, Scragg Building - On or about 7/15/24, and at times prior thereto, a caution sign was not on the Pendu Double Gang Bay Saw to warn employees of potential hazards and caution against the unsafe practice of reaching into the area while the saw blades are still moving after machine is shut down.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.145 C03

Serious Gravity 1 1 instance 8 exposed
Issued
Sep 30, 2024
Abate by
Oct 25, 2024
Penalty
Initial $0 · Current $0
29 CFR 1910.145(c)(3): Safety instruction sign(s) were not used where there was a need for general instructions and suggestions relative to safety measure(s):    a.)  Jn Pallet Company, LLC, Scragg Building - On or about 7/15/24, and at times prior thereto, a safety instruction signage was not on the Pendu Double Gang Bay Saw to guide the employees against the unsafe practice of reaching into the area while the saw blades are still moving after the machine is shut down.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.147 C06 I

Serious Gravity 5 1 instance 3 exposed
Issued
Sep 30, 2024
Abate by
Oct 25, 2024
Penalty
Initial $5,485 · Current $2,000 Reduced
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed:  a.)  JN Pallet Company, LLC - On or about 7/15/24, and at times prior thereto, periodic inspections were not being performed on hazardous energy control (lockout/tagout) procedures.  Employees conduct servicing, maintenance and repair on equipment including, but not limited to, conveyors, saws and dust collection systems.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2000
  • — Z (S) $5485

1910.145 E02

Other-than-serious 1 instance 8 exposed
Issued
Sep 30, 2024
Abate by
Oct 25, 2024
Penalty
Initial $0 · Current $0
29 CFR  1910.145(e)(2): The wording of signs was not easily read and concise.  a.)  Jn Pallet Company, LLC, Scragg  Building - On or about 7/15/24, and at times prior thereto, a danger sticker on the Pendu Double Gang Bay Saw was worn and illegible.  ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below).  This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View J N Pallet Company, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 347615924.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.